Status: Under Construction / Groundbroken | Location: Parc de l’Alba Sincrotró, 08290 Cerdanyola del Vallès, Barcelona, Spain
The ADAM Parc de l’Alba BCN3 Data Center is a colocation and cloud hosting facility located within the Parc de l’Alba Sincrotró technology hub in Cerdanyola del Vallès, Catalonia, Spain. Developed by Spanish data center operator ADAM, the project has a stated total area of 7,500 square meters, with 12,000 square meters allocated across modular technical halls. Positioned adjacent to the ALBA Synchrotron research complex, BCN3 represents ADAM’s flagship expansion in Catalonia and places its digital infrastructure development alongside an established scientific and technology environment. The facility is designed to serve organizations seeking reliable infrastructure for hosting IT equipment, cloud services, and business-critical digital applications.
The colocation model allows enterprises and service providers to deploy their systems in a dedicated data center environment without having to build and manage their own facilities. Its cloud hosting capabilities also support organizations that need flexible infrastructure for applications, data storage, and digital operations. The modular technical halls provide a structured approach to accommodating IT infrastructure, although specific capacity and expansion details have not been provided. Its location within the Parc de l’Alba technology hub creates a connection to a wider ecosystem of research, innovation, and technology-focused activity.
The proximity to the ALBA Synchrotron research complex gives the development a distinctive setting within Catalonia’s scientific and technological landscape. Research institutions, technology companies, and enterprises increasingly depend on digital infrastructure to manage data-intensive applications and support connected operations. While no specific power capacity, IT load, cooling systems, or renewable energy arrangements have been disclosed in the supplied information, the project’s scale and modular design establish its role as a substantial addition to ADAM’s regional footprint. By combining colocation and cloud hosting services with a location in an established research and technology hub, the ADAM Parc de l’Alba BCN3 Data Center strengthens ADAM’s presence in Catalonia and contributes to the region’s expanding digital infrastructure ecosystem.
| Field | Value |
|---|---|
| Project Name | ADAM Data Center BCN3 Parc de l’Alba 8MW Barcelona |
| Location | Parc de l’Alba Sincrotró, 08290 Cerdanyola del Vallès, Barcelona, Spain |
| Status | Under Construction / Groundbroken |
| Project Type | Eco-Efficient Enterprise & Cloud Co-location Data Center |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Barcelona |
| Population | 1.7 million (City proper) |
| Urban Agglomeration | 5.6 million (Barcelona metropolitan area) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.