Aligned Conesville Campus CMH-02 AI Data Center Conesville OH

Status: Under Construction   |   Location: 47201 County Road 273, Conesville, Ohio 43811


Project Overview

Aligned Conesville Campus (CMH-02) is a large-scale hyperscale data center development focused on artificial intelligence and cloud computing infrastructure, located at 47201 County Road 273 within the Conesville Industrial Park in Coshocton County, Ohio. Developed and operated by Plano, Texas-based Aligned Data Centers, the project occupies approximately 197 acres of brownfield land adjacent to the retired 2 GW AEP Conesville coal-fired power plant. The development represents Aligned's third data center campus in Ohio and forms part of the company's broader strategy to expand high-density computing capacity across major U.S. technology markets. Announced on July 24, 2025, the project entered development with a foundational anchor customer already secured, providing an initial demand base for its planned infrastructure. The campus master plan encompasses multiple data center facilities identified as CMH-02-01 through CMH-02-04, incorporating concrete slab-on-grade construction and structural steel building systems. To accelerate deployment and accommodate evolving computing requirements, the development utilizes Aligned's Adaptive Modular Infrastructure (AMI), which supports prefabricated construction, standardized infrastructure integration, and scalable capacity expansion. Designed around Tier III reliability standards and a stated 100% uptime service-level agreement, the campus incorporates advanced electrical and cooling systems to support energy-intensive AI workloads. Its power infrastructure includes 2 MW uninterruptible power supply line-ups, 3 MW backup generators, and 415V A+B redundant rack-level power distribution. Thermal management combines Aligned's patented Delta3 air cooling arrays with DeltaFlow liquid cooling loops, enabling the facility to accommodate ultra-high-density GPU clusters and advanced AI computing equipment. The campus also incorporates a closed-loop chilled-water cooling architecture designed to minimize freshwater consumption and achieve near-zero Water Utilization Efficiency (WUE). Its energy strategy includes 100% renewable power sourcing to support the company's sustainability objectives and reduce the environmental footprint of large-scale digital infrastructure. With Phase 1 capacity delivery initially targeted for mid-2026, the multi-billion-dollar development is expected to contribute to regional economic revitalization by repurposing former industrial property, attracting technology investment, supporting construction activity, and strengthening Central Ohio's position as an emerging hyperscale data center and artificial intelligence infrastructure market.


Quick Facts Selected Details

Field Value
Project Name Aligned Conesville Campus CMH-02 AI Data Center Conesville OH
Location 47201 County Road 273, Conesville, Ohio 43811
Status Under Construction
Project Type Mega-Scale AI and Hyperscale Cloud Data Center Campus
Commissioning 🔒 Subscriber Intelligence
Total IT Load 🔒 Subscriber Intelligence
Total Capacity 🔒 Subscriber Intelligence
Tier Level 🔒 Subscriber Intelligence

City Profile

Header Details
City Name Ohio
Population Not applicable because Pike is primarily a township and county designation rather than an incorporated city
Urban Agglomeration Not separately defined
Economic Profile 🔒 Detailed city intelligence available to subscribers

🔒

Unlock Full Project Intelligence

Get complete intelligence for Aligned Conesville Campus CMH-02 AI Data Center Conesville OH including companies involved, technical specifications, infrastructure details, construction milestones and investment intelligence.
✓ Companies & stakeholders
✓ Power infrastructure
✓ Technical specifications
✓ Construction milestones
✓ Investment details
✓ Funding intelligence

Companies Involved

Developer, operator, infrastructure partners, contractors and engineering.

🔒 Subscriber

Technical Specifications

Power capacity, redundancy, cooling, connectivity, PUE and energy mix.

🔒 Subscriber

Milestones

Announcement, construction start, go-live and full buildout.

🔒 Subscriber

Investment Details

Total project investment and funding intelligence.

🔒 Subscriber

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.