Status: Under Construction | Location: 47201 County Road 273, Conesville, Ohio 43811
Aligned Conesville Campus (CMH-02) is a large-scale hyperscale data center development focused on artificial intelligence and cloud computing infrastructure, located at 47201 County Road 273 within the Conesville Industrial Park in Coshocton County, Ohio. Developed and operated by Plano, Texas-based Aligned Data Centers, the project occupies approximately 197 acres of brownfield land adjacent to the retired 2 GW AEP Conesville coal-fired power plant. The development represents Aligned's third data center campus in Ohio and forms part of the company's broader strategy to expand high-density computing capacity across major U.S. technology markets. Announced on July 24, 2025, the project entered development with a foundational anchor customer already secured, providing an initial demand base for its planned infrastructure. The campus master plan encompasses multiple data center facilities identified as CMH-02-01 through CMH-02-04, incorporating concrete slab-on-grade construction and structural steel building systems. To accelerate deployment and accommodate evolving computing requirements, the development utilizes Aligned's Adaptive Modular Infrastructure (AMI), which supports prefabricated construction, standardized infrastructure integration, and scalable capacity expansion. Designed around Tier III reliability standards and a stated 100% uptime service-level agreement, the campus incorporates advanced electrical and cooling systems to support energy-intensive AI workloads. Its power infrastructure includes 2 MW uninterruptible power supply line-ups, 3 MW backup generators, and 415V A+B redundant rack-level power distribution. Thermal management combines Aligned's patented Delta3 air cooling arrays with DeltaFlow liquid cooling loops, enabling the facility to accommodate ultra-high-density GPU clusters and advanced AI computing equipment. The campus also incorporates a closed-loop chilled-water cooling architecture designed to minimize freshwater consumption and achieve near-zero Water Utilization Efficiency (WUE). Its energy strategy includes 100% renewable power sourcing to support the company's sustainability objectives and reduce the environmental footprint of large-scale digital infrastructure. With Phase 1 capacity delivery initially targeted for mid-2026, the multi-billion-dollar development is expected to contribute to regional economic revitalization by repurposing former industrial property, attracting technology investment, supporting construction activity, and strengthening Central Ohio's position as an emerging hyperscale data center and artificial intelligence infrastructure market.
| Field | Value |
|---|---|
| Project Name | Aligned Conesville Campus CMH-02 AI Data Center Conesville OH |
| Location | 47201 County Road 273, Conesville, Ohio 43811 |
| Status | Under Construction |
| Project Type | Mega-Scale AI and Hyperscale Cloud Data Center Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Ohio |
| Population | Not applicable because Pike is primarily a township and county designation rather than an incorporated city |
| Urban Agglomeration | Not separately defined |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.