Apple Waukee Data Center Building 2 Iowa: Hyperscale Cloud Expansion Hub
Status: Under Construction / Phased Expansion | Location: 2995 W Hickman Rd 50263 Waukee Iowa, USA
Project Overview
Apple Waukee – Building 2 is the second hyperscale data center facility under development on Apple’s expansive 2,000-acre master-planned campus in Waukee, Iowa, located within the rapidly growing Des Moines metropolitan region. As a major expansion of Apple’s long-term infrastructure investment, valued at approximately US$1.375 billion, Building 2 is designed to significantly increase the campus’s computing, storage, and networking capacity to meet the growing demand for cloud services, artificial intelligence (AI), and next-generation digital applications across North America. The facility will complement the capabilities of Building 1 while providing additional scalable infrastructure to support Apple’s expanding ecosystem of cloud-based platforms, including iCloud, Siri, Apple Music, the App Store, Apple Pay, Apple TV+, iMessage, and emerging Apple Intelligence services powered by Private Cloud Compute. Engineered to accommodate high-density computing environments, the data center features modular pod-based architecture that enables efficient deployment, operational flexibility, and future expansion as customer demand continues to grow. Its resilient infrastructure incorporates redundant electrical and mechanical systems, advanced uninterruptible power supply (UPS) technology, standby backup generators, fault-tolerant power distribution, and climate-optimized cooling systems designed to maximize energy efficiency while maintaining optimal operating conditions for modern compute-intensive workloads. The facility is also expected to support advanced AI processing, machine learning, and high-performance computing (HPC) applications that require greater rack densities and enhanced thermal management. Sustainability remains a core design principle, with Building 2 engineered to operate using 100% renewable electricity through regional clean energy procurement and renewable energy initiatives, reinforcing Apple’s global commitment to carbon neutrality and environmentally responsible operations. Comprehensive physical security, including multi-layer access controls, continuous surveillance, environmental monitoring, and advanced fire detection and suppression systems, protects critical infrastructure and customer data. High-capacity fiber connectivity integrates Building 2 with Apple’s nationwide and global cloud infrastructure, enabling resilient, low-latency service delivery and business continuity. As the second major phase of the Waukee campus, Building 2 strengthens Apple’s long-term cloud infrastructure strategy and positions the campus to support future innovations in AI, cloud computing, and digital services while contributing to the continued growth of the Midwest as a key data center region.
Quick Facts
| Field | Value |
| Project Name | Apple Waukee Data Center Building 2 Iowa: Hyperscale Cloud Expansion Hub |
| Location | 2995 W Hickman Rd 50263 Waukee Iowa, USA |
| Status | Under Construction / Phased Expansion |
| Commissioning | Targeted Go-Live 2026–2027 |
| Total IT Load | ~40 MW Critical IT Power Capacity Allocation (Building 2) |
| Total Capacity | ~315,000 sq ft to 398,000 sq ft (~29,264 m² to 37,000 m²) gross facility footprint (Part of a 2,000-acre 6-building master campus) |
| Tier Level | Tier III+ Equivalent Fault-Tolerant Design / LEED Certified Design |
| Project Type | Single-Tenant Purpose-Built Hyperscale Cloud & Infrastructure Expansion Data Center |
City Profile
| Header | Details |
| City Name | Waukee |
| Population | ~33,000 |
| Urban Agglomeration | Part of the Des Moines Metropolitan Area (~760,000 population) |
| City GDP | Part of the Des Moines metropolitan economy (estimated USD 65+ billion) |
| Per Capita Income | ~USD 55,000 |
| City Tier | Tier 2 – Emerging Data Center & Digital Infrastructure Hub |
| Key Strengths | One of the fastest-growing cities in Iowa; proximity to Des Moines; reliable and affordable power; expanding fiber connectivity; business-friendly environment; available land for hyperscale developments; growing technology and logistics sectors; access to a skilled workforce; attractive location for cloud, AI, and enterprise data center investments. |
Companies Involved
| Header | Details |
| Developer / Operator | Apple |
| Strategic Infrastructure Partner | MidAmerican Energy Company & City of Waukee Municipal Authorities |
| Construction Contractor | Specialized U.S. Mission-Critical EPC Contractors (e.g., JE Dunn / Ryan Companies) |
| MEP Engineering | Specialized Global Mission-Critical Engineering Consultants & Apple Data Center Engineering Teams |
| Network Connectivity | Dual path-diverse subterranean fiber entrance vaults, dedicated private Meet-Me-Rooms (MMRs), and direct dark fiber interconnection to major Midwestern fiber rings and Apple’s national data center network. |
| Power Infrastructure | High-voltage utility grid feeds from MidAmerican Energy, static 2N / Block Redundant uninterruptible power supply (UPS) configurations, automated switchgear, and multi-megawatt standby emergency diesel generator arrays with multi-day fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | ~40 MW Building Power Capacity (~150 MW+ Planned Campus Total) |
| UPS Redundancy | 2N / Block Redundant Static UPS Architecture |
| Cooling System | Air-side free-cooling economizers, closed-loop chilled water plant, hot/cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI workloads, and automated BMS environmental controls. |
| Connectivity | High-bandwidth optical fiber links connecting Waukee directly to Apple’s primary data center campuses in Maiden (NC), Reno (NV), Prineville (OR), and Mesa (AZ). |
| PUE Target | High-bandwidth optical fiber links connecting Waukee directly to Apple’s primary data center campuses in Maiden (NC), Reno (NV), Prineville (OR), and Mesa (AZ). |
| Energy Mix | 100% Renewable Energy supply (matched through local wind and solar Power Purchase Agreements with MidAmerican Energy). |
Milestones
| Header | Details |
| Announcement | August 2017 |
| Construction Start | 2023–2024 |
| Phase 1 Go-Live | Target 2026–2027 |
| Full Buildout | Under Construction / Active Master Campus Expansion |
Investment Details
| Header | Details |
| Total Investment | $1,375,000,000 USD (Total Campus Capital Commitment) |
| Funding | Corporate Capital Expenditure (Apple Inc.) |