Status: Planned | Location: 21200 Martinsburg Road, Dickerson, Maryland 20842
Atmosphere Dickerson Campus is a planned 360 MW hyperscale artificial intelligence and cloud data center development located at 21200 Martinsburg Road in Dickerson, Montgomery County, Maryland, United States. Developed by Atmosphere Data Centers, the project occupies an approximately 170-acre heavy-industrial site within the former Dickerson power generation complex, with an approximately 110-acre core parcel under contract from Terra Energy. Situated roughly 11 miles north of Ashburn's Data Center Alley, the campus is strategically positioned to serve growing demand for cloud computing, artificial intelligence, and high-performance computing infrastructure in the Mid-Atlantic region. The master plan includes five data center buildings, designated Buildings A through E, alongside administrative facilities, electrical infrastructure, storage buildings, and dedicated water and wastewater treatment facilities. The development is designed around modular construction methods and advanced liquid cooling technologies to support high-density computing workloads. Its sustainability strategy targets a power usage effectiveness (PUE) of approximately 1.08 to 1.10 and incorporates non-diesel backup generation systems with emissions capture. The proposed electrical infrastructure will leverage nearby Pepco substations, FirstEnergy transmission lines, carbon-free nuclear baseload electricity, and a nearby 2,000 MWh battery energy storage system. Telecommunications planning includes multiple fiber pathways and Q-loop connectivity, providing potential cloud on-ramps to AWS, Microsoft Azure, Google Cloud, and Oracle Cloud. In December 2025, the project received conditional use sketch plan approval with conditions prohibiting groundwater-based cooling and diesel backup generators. However, county permitting pause and data center moratorium discussions emerged in June 2026, creating potential regulatory challenges for its development. Once implemented, the campus could strengthen Montgomery County's position in the regional AI and cloud infrastructure market.
| Field | Value |
|---|---|
| Project Name | Atmosphere Dickerson Campus 360MW Data Center Dickerson MD |
| Location | 21200 Martinsburg Road, Dickerson, Maryland 20842 |
| Status | Planned |
| Project Type | Hyperscale AI, Machine Learning, and Cloud Data Center Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Maryland |
| Population | Approximately 6.3 million |
| Urban Agglomeration | Baltimore metropolitan area: approximately 2.9 million; Washington metropolitan area: approximately 6.4 million (Maryland portion contributes to this region) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.