Data4 Escaudain: €5B 700MW Hyperscale Campus in France

Status: Active / Master Planning & Environmental Site Permitting Phase (Tracking June 2026)   |   Location: Former Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France


Project Overview

The Data4 Escaudain Data Center Campus is a monumental digital infrastructure asset officially unveiled by European operator Data4 on June 16, 2026. Representing a massive €5 billion (US$5.8 billion) capital blueprint, this giga-scale development stands as the single largest data center investment in the company's history and across the French market. The project is specifically engineered from the ground up to establish a massive computational engine tailored to absorb skyrocketing European demand for high-performance computing (HPC), deep cloud migrations, and modern artificial intelligence architectures. Advancing systematically through site environmental master-planning and spatial layout optimization in mid-2026, the campus transforms a 33-hectare parcel at the former Parc des Soufflantes industrial site. Strategically positioned between Europe's traditional core FLAP-D (Frankfurt, London, Amsterdam, Paris, and Dublin) data markets, the Escaudain complex completely bypasses the severe grid locks and land scarcity throttling nearby capital metros. By redeveloping a historic industrial site, the massive project will create thousands of regional construction jobs and hundreds of high-wage technical roles while providing hyperscale tenants with immediate speed-to-market and unparalleled grid connectivity.


Quick Facts

FieldValue
Project NameData4 Escaudain: €5B 700MW Hyperscale Campus in France
LocationFormer Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France
StatusActive / Master Planning & Environmental Site Permitting Phase (Tracking June 2026)
CommissioningPhase 1 structural delivery and initial power testing targeted for late 2028
Total IT Load~550.0 MW net critical operational compute capacity across full buildout
Total Capacity700.0 Megawatts (700 MW) gross total utility power allocation
Tier LevelTier III+ Compliant (Concurrently maintainable design with direct high-voltage grid backing)
Project TypeBrownfield Industrial Redevelopment, Giga-Scale AI & Hyperscale Cloud Campus

City Profile

HeaderDetails
City NameEscaudain
PopulationApproximately 9,300
Urban AgglomerationApproximately 337,000 (Valenciennes Urban Area)
City GDPNot officially reported at city level; part of the Valenciennes economic region
Per Capita IncomeEstimated €19,000 - €22,000 per year
City TierTier 4 – Small Industrial Town
Key StrengthsStrategic location in Hauts-de-France; access to Valenciennes economy; industrial and manufacturing heritage; affordable housing; good regional transport connectivity

Companies Involved

HeaderDetails
Developer / Operator Data4 Infrastructure
Strategic Infrastructure Partner Municipality of Escaudain / Hauts-de-France Regional Economic Development Council
Construction Contractor Leading European Prime Mission-Critical General Contractors & Industrial Builders
MEP Engineering Data4 Global Design Group & High-Density Thermal Systems Engineering Divisions
Network Connectivity Ultra-high-speed carrier-neutral network fabric deploying multiple physically isolated fiber paths linking directly back to the primary Western European internet exchanges
Power Infrastructure Direct, high-voltage transmission interconnects tied into France's heavy industrial utility grid, supported by newly constructed on-site distribution substations

Technical Specifications

HeaderDetails
Power Capacity700 MW gross ultimate site power allocation engineered to sustain high-density AI server clusters and next-generation compute configurations
UPS Redundancy$2N$ block-redundant static solid-state UPS networks paired with rapid-start backup generation arrays and advanced localized energy buffering blocks
Cooling System Next-generation liquid cooling architectures and closed-loop thermodynamic loops designed to maximize heat-rejection efficiency without constant fluid loss
Connectivity Minimum of 4 physically independent, concrete-fortified underground network entry points to guarantee absolute transport pathway diversity
PUE Target Highly optimized annualized operating profile utilizing advanced environmental controls to drastically reduce ancillary power overhead
Energy Mix 100% matched renewable energy framework utilizing localized green power sourcing agreements backed by Data4's strict corporate ESG mandates

Milestones

HeaderDetails
Announcement 2026 - Q2
Construction Start 2026 - Q4
Phase 1 Go-Live 2028 - Q4
Full Buildout 2032 - Q4

Investment Details

HeaderDetails
Total Investment€5 Billion
Funding Backed by direct institutional equity structures from AXA Investment Managers combined with Data4 corporate infrastructure capital allocations

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.