DC BLOX Indianapolis Campus 100MW Data Center Indiana

Status: Permitted   |   Location: 305 Fintail Dr, Indianapolis, IN 46219


Project Overview

DC BLOX Indianapolis Campus is a proposed data center development located at 305 Fintail Drive within the Thunderbird Commerce Center in Warren Township, Indianapolis, Indiana. Developed by Atlanta-based DC BLOX Inc. through its subsidiary DCB Indianapolis, LLC, the project represents the company's first data center development in Indiana. The campus is being established on the former Ford Visteon industrial property, repurposing the site for large-scale digital infrastructure. Following community feedback and planning reviews in mid-2026, DC BLOX revised its original development proposal from three buildings to two buildings with a combined floor area of approximately 320,000 square feet. The updated design includes a single-story facility of around 70,000 square feet and a two-story building of approximately 250,000 square feet, supported by a dedicated substation occupying roughly 2.4 acres.

The development is planned in two phases, with an estimated power capacity of approximately 80 to 100 MW. Its infrastructure is designed to support enterprise cloud computing, colocation services, and high-density artificial intelligence workloads, including potential requirements associated with U.S. Department of Energy AI computing initiatives. To address environmental concerns, DC BLOX has proposed a closed-loop cooling system using propylene glycol that avoids water consumption through evaporative cooling towers. Additional safety and site management features include double-lined above-ground generator fuel tanks, lithium-ion battery backup systems, and landscaped buffering along the adjacent Pennsy Trail.

The total project investment is estimated at $1.8 billion to $2 billion, including approximately $600 million to $700 million for land acquisition and facility construction by DC BLOX and another $1.2 billion to $1.3 billion in tenant IT equipment and hardware. However, the project's tax incentive requests encountered challenges in November 2026, when an Indianapolis City-County Council committee recommended against approval of the proposed tax abatements ahead of a full council vote scheduled for December 2026.


Quick Facts Selected Details

Field Value
Project Name DC BLOX Indianapolis Campus 100MW Data Center Indiana
Location 305 Fintail Dr, Indianapolis, IN 46219
Status Permitted
Project Type Edge and Hyperscale AI Data Center Campus
Commissioning 🔒 Subscriber Intelligence
Total IT Load 🔒 Subscriber Intelligence
Total Capacity 🔒 Subscriber Intelligence
Tier Level 🔒 Subscriber Intelligence

City Profile

Header Details
City Name Indiana
Population ~6.83 million
Urban Agglomeration Major metros: Indianapolis ~2.1M, Chicago metro (IN portion included)
Economic Profile 🔒 Detailed city intelligence available to subscribers

🔒

Unlock Full Project Intelligence

Get complete intelligence for DC BLOX Indianapolis Campus 100MW Data Center Indiana including companies involved, technical specifications, infrastructure details, construction milestones and investment intelligence.
✓ Companies & stakeholders
✓ Power infrastructure
✓ Technical specifications
✓ Construction milestones
✓ Investment details
✓ Funding intelligence

Companies Involved

Developer, operator, infrastructure partners, contractors and engineering.

🔒 Subscriber

Technical Specifications

Power capacity, redundancy, cooling, connectivity, PUE and energy mix.

🔒 Subscriber

Milestones

Announcement, construction start, go-live and full buildout.

🔒 Subscriber

Investment Details

Total project investment and funding intelligence.

🔒 Subscriber

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.