Status: Announcement (MoU Signed, Pre-Construction) | Location: Visakhapatnam (Vizag), Andhra Pradesh, India
The Digital Connexion AI Data Center Campus in Visakhapatnam, Andhra Pradesh, represents a monumental commitment to building out India's digital backbone, particularly for the demanding field of Artificial Intelligence. This project is a joint venture between Reliance Industries, Canadian private equity firm Brookfield Infrastructure, and US-based data center operator Digital Realty. The consortium has pledged a staggering investment of $11 billion USD (approximately ₹91,000 crore) to develop a massive, dedicated AI data center park with a total capacity of 1 Gigawatt (GW). The project is expected to be built in phases, targeting full operational status by 2030.
The core purpose of this facility is to provide "AI-native" infrastructure, meaning it is specifically engineered to handle the ultra-high-density compute racks powered by the latest Graphics Processing Units (GPUs) used for training and deploying large AI models. This requires specialized infrastructure, including dedicated power substations and advanced cooling systems, most likely involving next-generation liquid cooling technologies to manage the intense heat load.
The selection of Visakhapatnam as the location is strategic. The city is rapidly becoming a major hub for data infrastructure on the east coast of India, benefiting from strong governmental incentives and its suitability for hosting subsea cable landing stations (CLS), which provide vital international network connectivity. This facility, alongside a parallel Reliance project in Jamnagar, will form a dual-hub network, enhancing the resilience and low-latency of the entire digital infrastructure ecosystem in India. In addition to serving hyperscale cloud providers and enterprises, the campus is projected to create a significant number of direct and indirect jobs, positioning Andhra Pradesh as a key player in the global AI race.
This massive investment underscores a pivotal shift in the data center industry towards not just scale, but AI-readiness and sustainability, with a strong focus on renewable energy to power the complex.
| Field | Value |
|---|---|
| Project Name | Digital Connexion AI Data Center Campus |
| Location | Visakhapatnam (Vizag), Andhra Pradesh, India |
| Status | Announcement (MoU Signed, Pre-Construction) |
| Commissioning | Expected by 2030 (Full Build-out) |
| Total IT Load | Not specified (Part of 1 GW total capacity) |
| Total Capacity | 1 GW (Gigawatt) |
| Tier Level | Likely Tier III/IV (Hyperscale requirement for AI-ready) |
| Project Type | Hyperscale, AI-Native Data Center Park |
| Header | Details |
|---|---|
| City Name | Visakhapatnam (Vizag) |
| Population | Approximately 2.3 Million (City) |
| Urban Agglomeration | Not specified (City-level focus) |
| City GDP | Not readily available in public announcement |
| Per Capita Income | Not readily available in public announcement |
| City Tier | Tier-1/Emerging Tier-1 Digital Hub |
| Key Strengths | Strategic location on the eastern coast; Existing port/industrial infrastructure; Emerging hub for subsea cable landing stations (CLS); Strong government support for data center development. |
| Header | Details |
|---|---|
| Developer / Operator | Digital Connexion |
| Strategic Infrastructure Partner | Andhra Pradesh State Government |
| Construction Contractor | To be determined |
| MEP Engineering | To be determined (Will involve advanced liquid cooling specialists) |
| Network Connectivity | High-speed fiber; Dual-hub network with Reliance's Jamnagar facility; Supports sea-landing cables (CLS) |
| Power Infrastructure | Dedicated power substations planned |
| Header | Details |
|---|---|
| Power Capacity | 1 GW |
| UPS Redundancy | Expected high redundancy (e.g., N+1 or 2N for hyperscale) |
| Cooling System | Advanced, likely incorporating liquid cooling for high-density AI racks |
| Connectivity | Supports cloud service providers and hyperscale clients |
| PUE Target | Expected low PUE (Designed for energy efficiency) |
| Energy Mix | Focus on renewable energy sourcing |
| Header | Details |
|---|---|
| Announcement | November 2025 (MoU signed) |
| Construction Start | Not yet specified (expected soon after final approvals) |
| Phase 1 Go-Live | Multi-phase development over five years |
| Full Buildout | Expected by 2030 |
| Header | Details |
|---|---|
| Total Investment | $11 Billion USD (~₹91,000 Crore) |
| Funding | Reliance Industries, Brookfield Infrastructure, and Digital Realty |