Digital Edge SEL5: 60MW Ansan AI Hyperscale Project
Status: Active / Secured Land & Early Civil Design Planning (Tracking June 2026) | Location: Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea
Project Overview
The Digital Edge SEL5 Data Center is a major next-generation digital infrastructure asset officially announced on June 8, 2026, in Ansan, South Korea. Located inside the government-designated Sihwa National Industrial Complex, this greenfield facility is engineered explicitly to address the severe space and power constraints impacting the primary Seoul metropolitan data center ecosystem. Advancing directly into early civil design work, site layout engineering, and substation connection frameworks in mid-2026, the project centers on a newly acquired 16,592-square-meter land parcel. SEL5 stands out in a supply-constrained market by securing a massive 90 MVA utility power agreement early in its development cycle. The data center is purpose-built to handle the intense processing configurations and extreme rack densities associated with large language model training and real-time AI inference. Situated roughly 40 kilometers southwest of central Seoul, the facility gives international hyperscalers and cloud service providers scalable data blocks combined with ultra-low latency metropolitan interconnectivity.
Quick Facts
| Field | Value |
| Project Name | Digital Edge SEL5: 60MW Ansan AI Hyperscale Project |
| Location | Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea |
| Status | Active / Secured Land & Early Civil Design Planning (Tracking June 2026) |
| Commissioning | Phase 1 building shell delivery and technical data hall fit-out scheduled for 2028 |
| Total IT Load | ~60.0 MW net critical operational compute capacity |
| Total Capacity | 90.0 Megavolt-Amperes (90 MVA) gross ultimate utility power agreement envelope |
| Tier Level | Tier III+ Compliant (Concurrently maintainable fault-tolerant design) |
| Project Type | Greenfield High-Density Hyperscale, Cloud Infrastructure & AI-Ready Facility |
City Profile
| Header | Details |
| City Name | Seoul |
| Population | ~9.4 million (Seoul city proper) |
| Urban Agglomeration | ~26 million (Seoul Capital Area metropolitan region) |
| City GDP | ~US$400 billion |
| Per Capita Income | ~US$42,000–45,000 |
| City Tier | Tier 1 / Alpha Global City |
| Key Strengths | Global financial center, technology and innovation hub, headquarters of major conglomerates (Samsung, LG, Hyundai), advanced infrastructure, world-class public transportation, strong education and research institutions, vibrant culture and tourism sector |
Companies Involved
| Header | Details |
| Developer / Operator | Digital Edge |
| Strategic Infrastructure Partner | Sihwa National Industrial Complex Management Board |
| Construction Contractor | Leading Domestic South Korean Mission-Critical EPC Engineering Builders |
| MEP Engineering | Digital Edge Global Data Center Architecture & Advanced Thermal Control Division |
| Network Connectivity | Carrier-neutral infrastructure utilizing multiple physically isolated, concrete-hardened network entries tied directly into Digital Edge's regional South Korean fiber backbones |
| Power Infrastructure | Korea Electric Power Corporation (KEPCO) Grid (Dual-feed architecture linked via two independent 154 kV industrial substations) |
Technical Specifications
| Header | Details |
| Power Capacity | 60 MW net critical IT capacity supported by a dedicated 90 MVA utility allocation built to mitigate localized cluster spikes |
| UPS Redundancy | $2N$ block-redundant static solid-state UPS topologies paired with industrial standby generator arrays ensuring 99.999% availability |
| Cooling System | Next-generation hybrid setup incorporating an industrial chiller plant with integrated free cooling alongside native loops for advanced liquid cooling |
| Connectivity | Minimum of 4 physically isolated, subterranean fiber entries providing absolute route diversity and secure transport loops |
| PUE Target | $\le 1.25$ design-optimized annualized operating profile setting a highly efficient benchmark for the Greater Seoul market |
| Energy Mix | High-efficiency architectural designs optimized to reduce resource consumption, targeting compliance with global corporate ESG benchmarks |
Milestones
| Header | Details |
| Announcement | 2026 - Q2 |
| Construction Start | 2026 - Q4 |
| Phase 1 Go-Live | 2028 - Q2 |
| Full Buildout | 2029 - Q4 |
Investment Details
| Header | Details |
| Total Investment | Multi-hundred million dollar capital deployment forming a core piece of Digital Edge's regional asset scaling framework |
| Funding | Corporate equity from the Stonepeak platform, supported by Digital Edge's newly closed regional holding company debt facilities |