Digital Realty Cyberjaya KUL11 32MW AI Campus
Status: Fully Operational / Newly Launched | Location: Cyberjaya Digital District, Selangor, Malaysia
Project Overview
The formal inauguration of Digital Realty's multi-site campus in Cyberjaya marks a strategic milestone for Malaysia's digital infrastructure. Rather than engaging in the regional race for raw gigawatt capacity, Digital Realty's newly launched platform focuses heavily on interconnection density and artificial intelligence inference execution. The campus integrates three distinct sites situated within a 500-meter radius, creating a unified, highly reliable ecosystem. At the center of this launch is KUL11, a purpose-built, six-story facility engineered to support intense AI and high-performance computing (HPC) workloads. This facility operates alongside KUL10, a dedicated connectivity carrier hotel hosting more than 40 network service providers and linked to major internet exchanges like MyIX and DE-CIX. The design of the Cyberjaya campus reflects the operational shift toward localized AI applications. As enterprise computing moves from massive data training phases toward active inference workloads, the demand has pivoted toward facilities that balance processing power with low-latency network paths. KUL11 provides exactly this environment, allowing financial institutions and enterprises to run sensitive private AI workflows securely without routing traffic outside national borders. To maintain absolute resiliency, each building features independent, diverse fiber entry points.
Quick Facts
| Field | Value |
| Project Name | Digital Realty Cyberjaya KUL11 32MW AI Campus |
| Location | Cyberjaya Digital District, Selangor, Malaysia |
| Status | Fully Operational / Newly Launched |
| Commissioning | June 2026 |
| Total IT Load | 15 MW (KUL11 Specific Phase) |
| Total Capacity | 32 MW (Total Three-Site Connected Campus Footprint) |
| Tier Level | Tier III Certified |
| Project Type | Hyperscale, High-Density AI Inference & Interconnection Hub |
City Profile
| Header | Details |
| City Name | Cyberjaya |
| Population | ~140,000 (Cyberjaya-Sepang corridor) |
| Urban Agglomeration | ~8.9 Million (Greater Kuala Lumpur) |
| City GDP | ~US $45 Billion (Contribution to Selangor/Digital Hub) |
| Per Capita Income | ~US $15,500 (Higher than national average) |
| City Tier | Tier 1 (Digital/Tech Hub) |
| Key Strengths | Multimedia Super Corridor (MSC) status, Tax incentives, Stable Grid |
Companies Involved
| Header | Details |
| Developer / Operator | Digital Realty |
| Strategic Infrastructure Partner | MDEC (Malaysia Digital Economy Corporation) & CSF Advisers |
| Construction Contractor | Gamuda Engineering |
| MEP Engineering | Digital Realty APAC Engineering Team |
| Network Connectivity | MyIX, DE-CIX, PlatformDIGITAL®, ServiceFabric® |
| Power Infrastructure | 32 MW total planned campus capacity across KUL10, KUL11, and a future expansion site. |
Technical Specifications
| Header | Details |
| Power Capacity | 32 MW Total Dedicated Grid Connection via Tenaga Nasional Berhad (TNB) |
| UPS Redundancy | Distributed Block Redundant (2N Configuration) |
| Cooling System | High-Density Chilled Water System with Liquid-Cooling Integration |
| Connectivity | Independent, highly diverse fiber entrance paths per facility |
| PUE Target | 1.30 Target |
| Energy Mix | Clean Energy Tracked via Malaysian Corporate Green Power Programme (CGPP) |
Milestones
| Header | Details |
| Announcement | Q3 2024 |
| Construction Start | Q1 2025 |
| Phase 1 Go-Live | June 2026 |
| Full Buildout | Mid-2028 (Third Phase Completion) |
Investment Details
| Header | Details |
| Total Investment | Estimated $180 Million USD |
| Funding | Corporate Capital Reinvestment Portfolio |