Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center

Status: Operational / Active Phased Capacity Expansion   |   Location: Calle de Alfonso Gómez 4, 28037 Madrid, Spain


Project Overview

Digital Realty’s MAD4 is a flagship hyperscale data center strategically located in Madrid’s San Blas-Canillejas technology district, widely recognised as "Silicon Alley Madrid." Spanning approximately 35,000 m² (380,000 sq ft), the facility delivers up to 34 MW of critical IT capacity, making it the largest and most advanced data center within Digital Realty’s Madrid metro campus. Purpose-built to support hyperscale cloud providers, enterprises, AI workloads, and high-performance computing (HPC), MAD4 offers highly scalable, energy-efficient infrastructure designed for mission-critical digital operations. The facility is interconnected through a resilient campus dark-fiber ring with the nearby MAD1, MAD2, and MAD3 data centers, enabling ultra-low-latency connectivity and seamless workload distribution across the Madrid campus. Serving as a strategic digital gateway between Southern Europe, Latin America, and North Africa, MAD4 provides carrier-neutral access to a rich ecosystem of telecommunications providers, internet service providers, cloud platforms, and enterprise networks. Customers benefit from direct connectivity to major internet exchanges, including ES-PANIX and DE-CIX Madrid, enabling high-performance interconnection and low-latency data exchange. The facility is engineered with a fully redundant 2N electrical architecture, advanced cooling systems, and comprehensive physical security measures to ensure maximum uptime and operational resilience. Powered entirely through 100% renewable energy procurement, MAD4 also supports customers' sustainability objectives while delivering reliable, secure, and future-ready infrastructure. Its strategic location, resilient design, extensive connectivity, and AI-ready capabilities make Digital Realty MAD4 one of Spain’s most important digital infrastructure assets and a key gateway for international data traffic.


Quick Facts

FieldValue
Project NameDigital Realty MAD4 Madrid: 34MW Hyperscale Data Center
LocationCalle de Alfonso Gómez 4, 28037 Madrid, Spain
StatusOperational / Active Phased Capacity Expansion
CommissioningPhase 1 Launch: Q4 2022 / Active Phased Scaling: 2025–2027
Total IT Load34 MW Total Critical IT Load
Total Capacity~40+ MW Total Gross Utility Substation Supply across 380,000 sq ft (35,000 m²) technical area
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 14001, ISO 27001, ISO 50001 Certified)
Project TypePurpose-Built Greenfield Hyperscale, Cloud & Interconnection Campus

City Profile

HeaderDetails
City NameMadrid
Population3.3Million
Urban Agglomeration 7 Million
City GDP€135.362 billion in 2020
Per Capita Income €38,435 per inhabitant in 2022.
City TierTier 1
Key StrengthsStrategic Subsea Cable Hub (connecting to the Americas and Africa); Central Location in Iberian Peninsula; Government Support for Digitalization.

Companies Involved

HeaderDetails
Developer / Operator Digital Realty
Strategic Infrastructure Partner Iberdrola / Endesa (Electrical Utilities) & Community of Madrid
Construction Contractor Specialized European Data Center EPC & Mission-Critical Contractors
MEP Engineering Digital Realty Global Design & High-Density Thermal Engineering Teams
Network Connectivity Redundant campus dark-fiber ring linking MAD1, MAD2, MAD3, and MAD4; direct access to ES-PANIX, DE-CIX Madrid, and major transatlantic/Mediterranean subsea landing routes.
Power Infrastructure Dual dedicated utility grid feeds, static 2N uninterruptible power supply (UPS) topology, and N+1 emergency standby generators with a guaranteed 4-hour fuel supply commitment.

Technical Specifications

HeaderDetails
Power Capacity34 MW Critical IT Power Capacity
UPS Redundancy2N Static UPS Architecture
Cooling System Closed-loop chilled water cooling system with N+1 redundancy, air-side economization, hot/cold aisle containment, and liquid-to-chip cooling readiness for high-density AI clusters.
Connectivity Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), multi-path fiber entry points (POEs), and cloud cross-connects via ServiceFabric™.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix 100% matched clean renewable energy procurement (wind and solar) supported by European Guarantees of Origin (GoO).

Milestones

HeaderDetails
Announcement Q1 2021
Construction Start 2021
Phase 1 Go-Live Q4 2022
Full Buildout Operational / Phased Expansion 2025–2027

Investment Details

HeaderDetails
Total InvestmentEstimated €200,000,000 EUR to €300,000,000 EUR
Funding Digital Realty corporate capital expenditure (CapEx) allocation