Frankfurt Central IV Hyperscale Data Center 186MW Campus

Status: Under Construction   |   Location: Frankfurt, EU


Project Overview

The Frankfurt Central IV Hyperscale Data Center represents a flagship expansion into Europe’s premier digital infrastructure hub. As artificial intelligence and high-performance computing (HPC) workloads scale globally, Maincubes has initiated this next-generation greenfield campus to capture the surging demand from global hyperscalers, cloud service providers, and sovereign AI enterprises looking for secure infrastructure outside of traditional constraints. Spanning a strategic location within the highly connected Frankfurt internet exchange footprint, the facility is meticulously engineered to offer dense compute configurations while meeting Europe's stringent Energy Efficiency Act standards. The architecture of Frankfurt Central IV shifts away from legacy layouts to accommodate high-density server deployments natively. Built utilizing modular pre-cast concrete engineering, the campus minimizes construction time frames and localized environmental disruptions. Structurally, the facility is divided into multiple high-density data halls that feature specialized structural load-bearing tracking engineered to hold heavy AI accelerator racks. The physical layout emphasizes security and segregation, ensuring that multi-tenant cloud operations run independently with dedicated staging areas, strict biometric access perimeter controls, and localized technical operations rooms.


Quick Facts

FieldValue
Project NameFrankfurt Central IV Hyperscale Data Center 186MW Campus
LocationFrankfurt, EU
StatusUnder Construction
CommissioningQ2 2027
Total IT Load186 MW
Total Capacity220 MW Gross Grid Allocation
Tier LevelTier III Compliant (with Tier IV elements for power)
Project TypeHyperscale Greenfield Build

City Profile

HeaderDetails
City NameFrankfurt
Population7,80,000
Urban Agglomeration5.8 million
City GDP€160.8 billion
Per Capita Income$101,000 USD
City TierTier 1
Key StrengthsHosting DE-CIX, the worlds largest Internet Exchange Point; financial capital of the Eurozone; strict sustainability mandates driving innovation.

Companies Involved

HeaderDetails
Developer / Operator maincubes Asset Management
Strategic Infrastructure Partner DTCP (Digital Transformation Capital Partners)
Construction Contractor Bouygues Energies & Services
MEP Engineering Royal HaskoningDHV / Siemens Smart Infrastructure
Network Connectivity DE-CIX Frankfurt, Colt Technology Services, Lumen Technologies
Power Infrastructure Dual 110kV dedicated substation feed from Westnetz

Technical Specifications

HeaderDetails
Power Capacity186 MW Net IT Capacity
UPS RedundancyDistributed Redundant (N+1) Flywheel and Lithium-Ion UPS
Cooling System Closed-loop Direct-to-Chip Liquid Cooling & Air-assisted chilled water
Connectivity Carrier-neutral access with 4 diverse fiber entry paths
PUE Target 1.15 annualized
Energy Mix 100% Verified Renewable (Wind and Solar PPA) supplemented by HVO backup generators

Milestones

HeaderDetails
Announcement Q3 2025
Construction Start Q1 2026
Phase 1 Go-Live Q2 2027
Full Buildout Q4 2028

Investment Details

HeaderDetails
Total Investment€1.2 Billion ($1.3 Billion USD)
Funding Consortium Debt Facility (led by Deutsche Bank) & Institutional Equity