Hscale MXP2 Hyperscale Milan Campus

Status: Under Construction / Development   |   Location: Milan Industrial District, Italy


Project Overview

The Hscale MXP2 Hyperscale Campus represents a massive €2 billion ($2.3 billion USD) digital infrastructure deployment in Italy, marking a significant expansion of southern Europe's high-performance computing (HPC) and artificial intelligence corridor. Located in the industrial outskirts of Milan, this specialized three-building development is specifically engineered to address the acute shortage of AI-ready, high-density colocation space within the primary Italian and Mediterranean enterprise markets.  The architectural framework of the MXP2 campus is custom-built to support the heavy physical and structural loads required by modern graphics processing unit (GPU) clusters. To mitigate the significant heat dissipation from these workloads without drawing heavily on local municipal water sources, Hscale has designed the facilities around an advanced closed-loop system that combines automated direct-to-chip liquid cooling manifolds with localized, high-efficiency air cooling loops. This technical setup enables the massive facility to operate at an ultra-efficient Power Usage Effectiveness (PUE) target of 1.16, setting a benchmark for green, large-scale deployments in Southern Europe.


Quick Facts

FieldValue
Project NameHscale MXP2 Hyperscale Milan Campus
LocationMilan Industrial District, Italy
StatusUnder Construction / Development
CommissioningQ4 2028 (Phase 1 Go-Live)
Total IT Load96 MW
Total Capacity120 MW (Full buildout allocation across three buildings)
Tier LevelTier III Compliant
Project TypeHyperscale / AI-Ready Wholesale Colocation

City Profile

HeaderDetails
City NameMilan
Population~1.4 million
Urban Agglomeration~3.2 million
City GDP~USD 220–240 billion
Per Capita Income~USD 60,000–65,000
City TierAlpha Global City
Key StrengthsGlobal financial and fashion capital

Companies Involved

HeaderDetails
Developer / Operator Hscale Platforms Corp.
Strategic Infrastructure Partner Terna (Transmission System Operator) & Regional Utilities
Construction Contractor To be finalized (Top-tier European Mission-Critical General Contractor)
MEP Engineering To be finalized (Specialized European AI-HPC MEP Consultants)
Network Connectivity Diverse Italian Dark Fiber Rings, Mediterranean Subsea Backhaul Interconnects
Power Infrastructure Dual-feed, dedicated on-site 150kV high-voltage substation with automated grid-balancing and localized load isolation protocols.

Technical Specifications

HeaderDetails
Power Capacity120 MW total allocated utility power
UPS RedundancyDistributed Reserve / Block Redundant static UPS configuration
Cooling System Direct-to-chip liquid cooling manifolds and closed-loop liquid-to-air cooling systems
Connectivity Carrier-neutral, multiple diverse dark fiber entry pathways
PUE Target 1.16
Energy Mix 100% Renewable Energy via regional Solar and Hydroelectric PPAs

Milestones

HeaderDetails
Announcement Q2 2026
Construction Start Q4 2026
Phase 1 Go-Live Q4 2028
Full Buildout Q2 2030

Investment Details

HeaderDetails
Total Investment€2,000,000,000 ($2.3 Billion USD)
Funding Infrastructure Private Equity Funds & Consortium Green Debt Facilities