Status: Under Development / Pre-Construction (100% Pre-Leased) | Location: 1627 State Route 3543 (Former Century Aluminum Smelter Site), Hawesville, Hancock County, Kentucky 42348, United States
The Justified Data Campus is a flagship 480 MW gross power artificial intelligence infrastructure development by TeraWulf Inc., located on a 250-plus-acre former Century Aluminum smelter site along the Ohio River in Hawesville, Kentucky. The project represents a major transformation of legacy industrial infrastructure into a high-density computing campus designed to support the rapidly growing requirements of artificial intelligence and high-performance computing. By repurposing existing electrical infrastructure and leveraging the site's established industrial power capabilities, the development is positioned to provide substantial energy capacity for advanced computing operations. TeraWulf has entered into a long-term 20-year, $19 billion lease agreement with Anthropic covering approximately 401 MW of critical IT capacity, underscoring the campus's role in supporting large-scale AI workloads. The facility is designed to accommodate intensive AI model training, inference operations, and dense GPU clusters that require significant power and advanced thermal management. Its infrastructure incorporates connectivity to the MISO power grid, energized high-voltage substations, and direct-to-chip liquid cooling technology to efficiently manage the heat generated by high-density computing equipment. The combination of substantial power availability, existing industrial infrastructure, dedicated electrical systems, and advanced cooling capabilities enables the campus to support scalable AI deployments while optimizing operational efficiency. Located within a strategically positioned industrial corridor along the Ohio River, the Justified Data Campus demonstrates how former heavy-industrial sites can be converted into next-generation digital infrastructure hubs. The development highlights the increasing convergence of energy infrastructure and AI computing capacity as hyperscalers and technology companies seek large-scale, power-intensive data center environments.
| Field | Value |
|---|---|
| Project Name | Justified Data Campus: TeraWulf Hawesville Specs |
| Location | 1627 State Route 3543 (Former Century Aluminum Smelter Site), Hawesville, Hancock County, Kentucky 42348, United States |
| Status | Under Development / Pre-Construction (100% Pre-Leased) |
| Project Type | Purpose-Built Hyperscale AI Cloud, High-Performance Computing (HPC) & Dense GPU Megacampus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Kentucky |
| Population | Approx. 4.5 Million |
| Urban Agglomeration | Approx. 3.1 Million |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.