Justified Data Campus: TeraWulf Hawesville Specs

Status: Under Development / Pre-Construction (100% Pre-Leased)   |   Location: 1627 State Route 3543 (Former Century Aluminum Smelter Site), Hawesville, Hancock County, Kentucky 42348, United States


Project Overview

The Justified Data Campus is a flagship 480 MW gross power artificial intelligence infrastructure development by TeraWulf Inc., located on a 250-plus-acre former Century Aluminum smelter site along the Ohio River in Hawesville, Kentucky. The project represents a major transformation of legacy industrial infrastructure into a high-density computing campus designed to support the rapidly growing requirements of artificial intelligence and high-performance computing. By repurposing existing electrical infrastructure and leveraging the site's established industrial power capabilities, the development is positioned to provide substantial energy capacity for advanced computing operations. TeraWulf has entered into a long-term 20-year, $19 billion lease agreement with Anthropic covering approximately 401 MW of critical IT capacity, underscoring the campus's role in supporting large-scale AI workloads. The facility is designed to accommodate intensive AI model training, inference operations, and dense GPU clusters that require significant power and advanced thermal management. Its infrastructure incorporates connectivity to the MISO power grid, energized high-voltage substations, and direct-to-chip liquid cooling technology to efficiently manage the heat generated by high-density computing equipment. The combination of substantial power availability, existing industrial infrastructure, dedicated electrical systems, and advanced cooling capabilities enables the campus to support scalable AI deployments while optimizing operational efficiency. Located within a strategically positioned industrial corridor along the Ohio River, the Justified Data Campus demonstrates how former heavy-industrial sites can be converted into next-generation digital infrastructure hubs. The development highlights the increasing convergence of energy infrastructure and AI computing capacity as hyperscalers and technology companies seek large-scale, power-intensive data center environments.


Quick Facts

FieldValue
Project NameJustified Data Campus: TeraWulf Hawesville Specs
Location1627 State Route 3543 (Former Century Aluminum Smelter Site), Hawesville, Hancock County, Kentucky 42348, United States
StatusUnder Development / Pre-Construction (100% Pre-Leased)
CommissioningH2 2027 Initial Delivery Target (Full Phase Delivery Early 2028)
Total IT Load~401.0 MW Critical IT Load Capacity (480.0 MW Gross Power Capacity)
Total Capacity250+ acre buildable brownfield master-planned AI supercomputing campus
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant AI Architecture
Project TypePurpose-Built Hyperscale AI Cloud, High-Performance Computing (HPC) & Dense GPU Megacampus

City Profile

HeaderDetails
City NameKentucky
PopulationApprox. 4.5 Million
Urban AgglomerationApprox. 3.1 Million
City GDPApprox. USD 280 Billion
Per Capita IncomeApprox. USD 58,000
City TierTier 2 US State Economy
Key StrengthsBourbon production, automotive manufacturing, logistics & distribution, healthcare, agriculture, horse racing & tourism

Companies Involved

HeaderDetails
Developer / Operator TeraWulf Inc.
Strategic Infrastructure Partner MISO (Midcontinent Independent System Operator), Anthropic (Anchor Tenant), Local Power Utilities
Construction Contractor Specialized Industrial EPC & Mission-Critical Data Center Contractors
MEP Engineering TeraWulf Global Mission-Critical Energy Engineering & Thermal Management Teams
Network Connectivity Carrier-neutral facility featuring path-diverse subterranean dark fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and high-capacity dark fiber interconnects to regional Midwest fiber backbones and major US internet exchange hubs.
Power Infrastructure Multiple redundant high-voltage transmission lines connected directly via an energized on-site substation within the MISO power market, supported by static 2N / N+1 uninterruptible power supply (UPS) modules and backup industrial diesel generators.

Technical Specifications

HeaderDetails
Power Capacity~480 MVA Total Substation Grid Power Capacity
UPS RedundancyConcurrently Maintainable 2N / N+1 Static UPS Systems
Cooling System Ultra-dense direct-to-chip (DLC) liquid cooling systems, rear-door heat exchangers (RDHx), closed-loop chillers, cold-aisle containment, and air-side free cooling taking advantage of regional climate conditions.
Connectivity Sub-millisecond optical dark fiber routes connecting Hawesville to regional carrier nodes, Louisville, Indianapolis, and Chicago internet exchanges.
PUE Target < 1.15 Annualized Operational Design PUE
Energy Mix High-efficiency MISO utility grid power supplemented by regional zero-carbon and clean energy procurement.

Milestones

HeaderDetails
Announcement February 2026 (Site Acquisition) / July 2026 (Anthropic Anchor Lease)
Construction Start 2026 / Early 2027
Phase 1 Go-Live H2 2027
Full Buildout Early 2028 Commercial Delivery

Investment Details

HeaderDetails
Total Investment~$1,500,000,000 – $2,500,000,000 USD (Estimated Facility Capital Expenditure)
Funding Corporate Capital Expenditure / Long-Term Anchor Lease Financing (TeraWulf / Anthropic Agreement)