Status: Permitted | Location: 1051 County Road 401, Taylor, TX 76574
Project Comal Campus is a major 360 MW hyperscale artificial intelligence and cloud data center development located at 1051 County Road 401 in Taylor, Williamson County, Texas. Developed by Dallas-based KDC Real Estate Development and Investments, the project covers approximately 210 to 220 acres along the US 79 technology corridor, northeast of Samsung Electronics' semiconductor manufacturing plant. In March 2026, the Taylor City Council unanimously approved the property's annexation and Employment Center rezoning, marking an important step toward development.
The master plan includes six large data center buildings, dedicated electrical infrastructure, stormwater detention ponds, and supporting commercial spaces. Designed to accommodate high-density AI computing and hyperscale cloud workloads, the campus will have a planned power capacity of approximately 360 MW. Its electricity supply is expected to connect to the ERCOT South Central load zone through Oncor, supporting the substantial energy requirements of the facilities.
Water conservation and community protection are important elements of the development. KDC has proposed a closed-loop cooling system requiring an initial water fill of up to 5 million gallons per building, or approximately 30 million gallons across the six buildings. The water will be continuously recycled to minimize evaporative losses. Additional measures include Dark Skies-compliant exterior lighting, noise mitigation controls, and a 300-foot landscaped buffer separating the campus from nearby residential communities.
With an estimated investment exceeding $2.5 billion, Project Comal is expected to create approximately 3,000 construction jobs over a three-and-a-half-year development period and more than 360 permanent direct and indirect jobs once operational. Over its first decade, the campus is projected to generate more than $145.9 million in municipal tax and utility revenues for the City of Taylor and $70.7 million for the local school district.
| Field | Value |
|---|---|
| Project Name | KDC Project Comal 360MW Data Center Campus 345kV Texas |
| Location | 1051 County Road 401, Taylor, TX 76574 |
| Status | Permitted |
| Project Type | Hyperscale AI Data Center Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Texas |
| Population | ~30.5 million (2025 est.) |
| Urban Agglomeration | ~27–28 million (major metro clusters combined) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.