London III Data Center: 56MW West London AI Factory

Status: Under Construction / Phased Expansion (April 2026)   |   Location: Digital Park, Crawley, UK


Project Overview

 As of April 2026, London III is undergoing a substantial 56MW expansion, positioning it as a flagship “AI Factory” for the UK market and a cornerstone of next-generation digital infrastructure. Technically, the facility is being upgraded to support ultra-high-density rack configurations of up to 100kW per rack, enabling it to efficiently run advanced AI hardware such as NVIDIA Blackwell and NVIDIA Vera Rubin systems. This level of density reflects the growing demand for accelerated computing environments capable of handling large-scale AI training and inference workloads. Strategically located in the Crawley digital corridor, London III offers a critical alternative to the increasingly power-constrained Slough market, ensuring scalability for enterprise and hyperscale clients. The expansion also emphasizes sustainability and regulatory compliance, featuring a closed-loop cooling system engineered to operate with zero water consumption an essential factor in meeting modern UK planning and environmental standards. Fully integrated into PlatformDIGITAL, the facility provides seamless, low-latency connectivity to London’s financial district and key cloud on-ramps. This integration enhances data mobility, interconnection, and hybrid IT capabilities, reinforcing London III’s role as a vital hub for AI-driven innovation and digital transformation across the United Kingdom and beyond.


Quick Facts

FieldValue
Project NameLondon III Data Center: 56MW West London AI Factory
LocationDigital Park, Crawley, UK
StatusUnder Construction / Phased Expansion (April 2026)
CommissioningPhase 1 Expansion Online: Q1 2027
Total IT Load56.0 MW (Total Campus Capacity)
Total Capacity~25,000 m² of high-density whitespace
Tier LevelTier III+ (AI Inference & Training Ready)
Project TypeAI-Ready Hyperscale Campus

City Profile

HeaderDetails
City Namelondon
Population 8.9 Million
Urban Agglomeration9.8 to 11.4 million
City GDP£110.8 billion in 2023
Per Capita Income£69,077 in 2023
City TierTier 1
Key StrengthsGlobal Financial Hub; Dense Connectivity; Low Latency to Europe and North America; large skilled talent pool.

Companies Involved

HeaderDetails
Developer / Operator Digital Realty
Strategic Infrastructure Partner West London Digital Park / PlatformDIGITAL®.
Construction Contractor Digital Realty GDC / Mercury Engineering.
MEP Engineering $N+1$ Block Redundant Power; Liquid cooling manifolds.
Network Connectivity 100+ Carriers; Low-latency fiber to Slough and City of London.
Power Infrastructure 56 MW; New on-site high-voltage substation (2026).

Technical Specifications

HeaderDetails
Power Capacity56.0 MW
UPS Redundancy$N+1$
Cooling System Non-evaporative Closed-Loop (Zero Water Use).
Connectivity Core AI training and inference node for the London metro.
PUE Target < 1.25
Energy Mix 100% Renewable Matching (REGO-backed).

Milestones

HeaderDetails
Announcement N/A (Expansion Update)
Construction Start 2025
Phase 1 Go-Live Q1 2027
Full Buildout 2028

Investment Details

HeaderDetails
Total InvestmentPart of a multi-billion pound UK infrastructure commitment.
Funding Undisclosed (Estimated £400M+ for expansion).

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.

Submit