Microsoft Castroville FM471 Data Center 250MW Campus

Status: Under Construction   |   Location: 2580 FM471 North / 8844 FM1957, Castroville, TX 78009, USA


Project Overview

The Microsoft Castroville FM471 Campus, situated at 2580 FM471 North and 8844 FM1957 in Castroville, Texas, represents a major hyperscale data center development designed to expand Microsoft's global Azure cloud infrastructure while supporting next-generation artificial intelligence, high-performance computing, and enterprise workloads. Located in Medina County northwest of San Antonio, the expansive campus spans hundreds of acres and is engineered to accommodate phased development, rapid power deployment, and increasingly dense computing architectures. Utility power is supplied through high-voltage onsite substations connected to the ERCOT power grid, providing the electrical capacity required for large-scale cloud and AI operations. Resiliency is reinforced through static uninterruptible power supply configurations and industrial standby emergency diesel generators supported by extensive onsite fuel storage, helping maintain continuous operations during grid interruptions and other utility events. The campus incorporates Microsoft's broader sustainability objectives, with infrastructure designed to support zero-waste practices and net-zero water ambitions. Zero-water closed-loop cooling systems help reduce dependence on freshwater resources, while advanced direct-to-chip liquid cooling capabilities are suited to the elevated thermal requirements of high-density AI and accelerated computing environments. Network connectivity is another critical component, with redundant subterranean dark fiber pathways providing diverse connections to major Texas intercity fiber backbones and regional technology corridors. Strategically positioned within the San Antonio metropolitan area, the Castroville FM471 campus strengthens Microsoft's regional Azure footprint by combining large-scale land availability, robust electrical infrastructure, advanced cooling technologies, and resilient fiber connectivity. Together, these capabilities position the development as an important hyperscale digital infrastructure hub for Microsoft's expanding cloud and AI ecosystem across Texas and beyond.


Quick Facts Selected Details

Field Value
Project Name Microsoft Castroville FM471 Data Center 250MW Campus
Location 2580 FM471 North / 8844 FM1957, Castroville, TX 78009, USA
Status Under Construction
Project Type Hyperscale Data Center, AI Cloud Infrastructure & Azure Region Node
Commissioning 🔒 Subscriber Intelligence
Total IT Load 🔒 Subscriber Intelligence
Total Capacity 🔒 Subscriber Intelligence
Tier Level 🔒 Subscriber Intelligence

City Profile

Header Details
City Name San Antonio
Population Approximately 1.5 million (2023 estimate)
Urban Agglomeration Around 2.5 million
Economic Profile 🔒 Detailed city intelligence available to subscribers

🔒

Unlock Full Project Intelligence

Get complete intelligence for Microsoft Castroville FM471 Data Center 250MW Campus including companies involved, technical specifications, infrastructure details, construction milestones and investment intelligence.
✓ Companies & stakeholders
✓ Power infrastructure
✓ Technical specifications
✓ Construction milestones
✓ Investment details
✓ Funding intelligence

Companies Involved

Developer, operator, infrastructure partners, contractors and engineering.

🔒 Subscriber

Technical Specifications

Power capacity, redundancy, cooling, connectivity, PUE and energy mix.

🔒 Subscriber

Milestones

Announcement, construction start, go-live and full buildout.

🔒 Subscriber

Investment Details

Total project investment and funding intelligence.

🔒 Subscriber