Project Overview

The Microsoft Hillcrest Campus, located on a 132-acre site at 210 Tunstall Road in South Hill, Virginia, represents a major enterprise data center development supporting Microsoft’s Southern Virginia regional infrastructure. Designed to expand Microsoft Azure capacity and accommodate growing cloud computing, artificial intelligence, machine learning, and enterprise workload requirements, the campus encompasses three initial single-story data center buildings identified as AVC01, AVC02, and AVC03. Utility infrastructure is designed around high-voltage substation interconnections with Dominion Energy, supported by static modular uninterruptible power supply systems configured in 2N redundant topologies and emergency standby diesel generators to provide resilience during utility interruptions. Thermal management incorporates high-efficiency air-cooled chiller systems alongside direct-to-chip liquid cooling options designed for increasingly dense computing environments, including GPU-based AI infrastructure. These cooling technologies are intended to maintain reliable operating conditions while improving energy efficiency and limiting local water consumption. As part of Microsoft’s broader digital infrastructure presence in Mecklenburg County and Southern Virginia, the Hillcrest campus is strategically positioned to benefit from established regional telecommunications networks and connectivity corridors. Planned network infrastructure includes subterranean dark-fiber entry vaults, dual carrier-neutral meet-me rooms, redundant internal fiber pathways, and high-capacity fiber backbones connecting toward Microsoft’s established Boydton data center campus and major Ashburn network hubs. Physical security incorporates controlled perimeter access, biometric authentication, surveillance systems, secured equipment areas, and zero-trust security principles designed to protect mission-critical infrastructure. Through its strategic location, resilient electrical architecture, advanced cooling capabilities, and high-capacity network connectivity, the Hillcrest Campus is positioned to strengthen Microsoft Azure’s Southern Virginia infrastructure while supporting the increasing computational demands of cloud services and artificial intelligence applications.


Quick Facts Selected Details

Field Value
Project Name Microsoft Hillcrest Campus Data Center South Hill Mecklenburg County Virginia
Location 210 Tunstall Rd, South Hill, VA 23970, United States
Status Under Construction Phase
Project Type Enterprise Cloud Infrastructure & Azure AI Availability Zone Node
Commissioning πŸ”’ Subscriber Intelligence
Total IT Load πŸ”’ Subscriber Intelligence
Total Capacity πŸ”’ Subscriber Intelligence
Tier Level πŸ”’ Subscriber Intelligence

City Profile

Header Details
City Name Richland Paris
Population Richland's population is relatively small. The city is part of a larger metropolitan area, so it can be helpful to consider the surrounding area as well.
Urban Agglomeration As part of Paris’ urban agglomeration, Richland contributes to the broader metro area with a population that reaches over 2 million, considering the greater Paris area.
Economic Profile πŸ”’ Detailed city intelligence available to subscribers

πŸ”’

Unlock Full Project Intelligence

Get complete intelligence for Microsoft Hillcrest Campus Data Center South Hill Mecklenburg County Virginia including companies involved, technical specifications, infrastructure details, construction milestones and investment intelligence.
βœ“ Companies & stakeholders
βœ“ Power infrastructure
βœ“ Technical specifications
βœ“ Construction milestones
βœ“ Investment details
βœ“ Funding intelligence

Companies Involved

Developer, operator, infrastructure partners, contractors and engineering.

πŸ”’ Subscriber

Technical Specifications

Power capacity, redundancy, cooling, connectivity, PUE and energy mix.

πŸ”’ Subscriber

Milestones

Announcement, construction start, go-live and full buildout.

πŸ”’ Subscriber

Investment Details

Total project investment and funding intelligence.

πŸ”’ Subscriber

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.