Status: Permitted | Location: 2588 County Drive (US-460), Petersburg, Virginia 23803
NuVu Petersburg Campus, also known as the NuVu County Drive Data Center Campus, is a proposed three-building hyperscale data center development located between Interstate 95 and County Drive (U.S. Route 460) in Petersburg, Virginia. Developed by Leesburg-based NuVu Real Estate, the project encompasses approximately 75 acres of previously undeveloped land acquired in November 2025 for approximately $4.12 million. The property is situated within a federally designated Opportunity Zone, positioning the development within an area targeted for investment and economic revitalization. The site is classified under M-1 Light Industrial zoning, which permits data center development by right following amendments to Petersburg's zoning regulations in 2024, eliminating the requirement for a separate rezoning process. The development is also planned without impacts to regulated wetlands. Announced in January 2026, the project represents an estimated capital investment of up to $1.1 billion and is designed to deliver approximately 300 MW of data center capacity. Its master plan includes three purpose-built facilities supported by electrical distribution infrastructure, cooling systems, telecommunications connectivity, and associated campus facilities. In February 2026, the project became the first data center development in Petersburg to receive site plan approval, marking an important milestone in the city's emerging data center development activity. Electricity supply is expected to be supported by a new on-site substation connected to Dominion Energy Virginia's power grid, with the site's proximity to an existing 230 kV transmission corridor providing access to regional high-voltage infrastructure. The developer also plans to incorporate clean energy sourcing as part of the campus's broader energy strategy. Water management is another important component of the proposed design, with a closed-loop cooling system intended to recycle water within the facility and reduce dependence on external freshwater supplies. The cooling architecture is specifically designed to operate without drawing on Petersburg's public municipal water system. Through its planned investment, electrical infrastructure, and water-efficient engineering approach, NuVu Petersburg Campus aims to establish a significant hyperscale computing hub in the region while contributing to local economic development and expanding Virginia's digital infrastructure footprint.
| Field | Value |
|---|---|
| Project Name | NuVu Petersburg Campus 300MW Data Center Petersburg VA |
| Location | 2588 County Drive (US-460), Petersburg, Virginia 23803 |
| Status | Permitted |
| Project Type | Hyperscale AI and Cloud Data Center Campus |
| Commissioning | π Subscriber Intelligence |
| Total IT Load | π Subscriber Intelligence |
| Total Capacity | π Subscriber Intelligence |
| Tier Level | π Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Virginia |
| Population | β 1.77 million |
| Urban Agglomeration | β 1.05 million (CharlestonβHuntingtonβParkersburg combined urban influence) |
| Economic Profile | π Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.