Oracle Zettascale Hub: 131,072 GPU AI Supercluster Texas

Status: Active Deployment / Expansion (March 2026)   |   Location: Abilene (Taylor/Shackelford Counties), Texas


Project Overview

Formally unveiled as the foundational infrastructure layer for the OpenAI Stargate initiative, the Zettascale Hub represents Oracle’s strategic response to the “brute force” scaling phase of artificial intelligence. Located in Abilene, the campus departs from conventional hyperscale layouts by concentrating all critical compute resources within a tightly integrated two-kilometer radius, significantly reducing GPU-to-GPU latency and enabling ultra-high-speed model training at scale. As of March 2026, the facility is deploying the advanced Zettascale10 architecture, leveraging Oracle’s proprietary Acceleron RoCE networking fabric to interconnect hundreds of thousands of NVIDIA Blackwell GPUs and AMD Instinct GPUs. This high-bandwidth, low-latency configuration enables peak performance levels of up to 16 zettaFLOPS (sparse FP4), positioning the hub among the most powerful AI compute environments globally. To address the immense power requirements without overburdening the local grid, Oracle is investing in dedicated onsite substations alongside large-scale battery energy storage systems (BESS), ensuring operational stability and energy resilience. In parallel, the project integrates a closed-loop, non-evaporative cooling system, reducing water consumption to levels comparable to a standard office building an essential adaptation for the semi-arid climate of West Texas. Collectively, the Zettascale Hub exemplifies a new class of AI infrastructure, where extreme compute density, energy autonomy, and resource efficiency converge to support next-generation foundation models.


Quick Facts

FieldValue
Project NameOracle Zettascale Hub: 131,072 GPU AI Supercluster Texas
LocationAbilene (Taylor/Shackelford Counties), Texas
StatusActive Deployment / Expansion (March 2026)
CommissioningInitial Phase: Q3 2025; MI450 Series Expansion: Q3 2026
Total IT Load1.0 GW+ (Scalable to multi-gigawatt)
Total CapacitySupport for 131,072 to 800,000+ GPUs in a single cluster
Tier LevelTier IV (Zettascale AI Optimized)
Project TypeSovereign AI & Frontier Training Supernode

City Profile

HeaderDetails
City NameAbilene
Population~129,000
Urban Agglomeration~175,000
City GDP~$8–10 billion (estimated, Abilene MSA)
Per Capita Income~$30,000–$32,000
City TierTier 3 (Mid-sized regional city)
Key StrengthsDefense presence (Dyess AFB), logistics hub, affordable land, growing energy sector (wind & renewables), emerging data center interest, strong transport connectivity

Companies Involved

HeaderDetails
Developer / Operator Oracle Cloud Infrastructure (OCI)
Strategic Infrastructure Partner OpenAI (Primary Tenant) / City of Abilene.
Construction Contractor TBD (Large-scale industrial partners).
MEP Engineering Oracle Global Design / AEP Texas (Grid Interconnect).
Network Connectivity 3.2 Tbps cluster bandwidth; custom multi-plane network fabric.
Power Infrastructure On-site dedicated transmission; 25-year clean energy PPA.

Technical Specifications

HeaderDetails
Power Capacity1.0 GW (Initial) / 2.0 GW+ (Planned)
UPS Redundancy$2N$ architecture with integrated grid-stabilization "Virtual Power Plant."
Cooling System 100% Non-Evaporative Closed-Loop Liquid Cooling.
Connectivity Ultra-low latency "Direct Fiber" to primary AI research labs.
PUE Target 1.10
Energy Mix 100% CFE Match; Massive focus on solar + long-duration storage.

Milestones

HeaderDetails
Announcement October 14, 2025
Construction Start 2024 (Initial Site Prep)
Phase 1 Go-Live Late 2025
Full Buildout 2030

Investment Details

HeaderDetails
Total Investment$10 Billion (Abilene Campus Phase)
Funding Oracle 2026 $50B Capital Raise (Debt/Equity Mix).