Status: Permitted | Location: 2075 Jason Industrial Parkway, Winston, Georgia 30187
SDC ATLA Data Center is a permitted hyperscale data center development located at 2075 Jason Industrial Parkway in Winston, Douglas County, Georgia, United States, west of Atlanta. Developed by SDC ATLA, LLC, an affiliate of Stream Data Centers, the campus occupies approximately 215.6 to 274 acres within the growing West Atlanta digital infrastructure corridor. The development is planned as a large-scale hyperscale facility supporting cloud computing, artificial intelligence, and other high-performance computing workloads. Georgia Department of Community Affairs Development of Regional Impact (DRI) filings identify nine proposed data center buildings with a combined floor area of approximately 1.34 million square feet. Environmental permitting records from the Georgia Environmental Protection Division include Air Permit Application No. 29802 and AIRS No. 097-00103. The proposed campus includes 315 diesel-fired emergency backup generators, with 35 generators allocated to each building. Each generator is designed for approximately 2.5 MW of capacity and uses ultra-low sulfur diesel fuel, with integrated belly fuel tanks. The generator installation is subject to a site-wide nitrogen oxide emissions cap of less than 250 tons per year. The wider Stream Data Centers Atlanta West campus is planned to support up to 270 MW of critical IT capacity. The development is expected to strengthen the company's presence in the Atlanta data center market and provide infrastructure for growing enterprise and hyperscale computing requirements. Construction is anticipated to begin around 2027, following the necessary permitting and development preparations. Once completed, the campus could contribute additional data center capacity to Georgia's expanding digital infrastructure ecosystem.
| Field | Value |
|---|---|
| Project Name | SDC ATLA Data Center |
| Location | 2075 Jason Industrial Parkway, Winston, Georgia 30187 |
| Status | Permitted |
| Project Type | Hyperscale AI and Cloud Data Center Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Georgia |
| Population | 11,302,748, July 2025 estimate |
| Urban Agglomeration | Not separately reported. |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.