Stargate UAE Phase 1 200MW AI Compute Cluster

Status: Phase 1 Commissioned   |   Location: Abu Dhabi


Project Overview

The Stargate UAE project, officially commissioned for its first phase in February 2026, represents the pinnacle of sovereign AI infrastructure. Located within a dedicated 10-square-mile AI campus in Abu Dhabi, this facility is the result of a landmark international partnership involving G42, OpenAI, Microsoft, NVIDIA, and SoftBank. The project is designed specifically to meet the skyrocketing demand for "nation-scale" compute power, focusing on training large language models (LLMs) and performing high-density AI inferencing.

Phase 1 delivers 200 MW of IT capacity, utilizing the latest NVIDIA Grace Blackwell GB300 systems to provide unprecedented processing speeds. Unlike traditional data centers, Stargate is architected for extreme rack densities, likely exceeding 100 kW per rack, necessitating advanced liquid cooling solutions. The facility serves as a core engine for the UAE's "Vision 2030" goals, ensuring the nation has the sovereign capability to develop and host world-class AI applications locally.

Sustainability is integrated into the campus's DNA; the project is powered by a tri-source energy strategy including Nuclear (from the Barakah Plant), Solar, and Natural Gas. This ensures a stable, massive power supply required for the GB300 chips while maintaining a roadmap toward carbon neutrality. By providing local access to OpenAI’s models and Oracle’s sovereign cloud services, Stargate UAE eliminates the latency and data residency hurdles that previously slowed AI adoption in the Middle East. At its full buildout, the campus is expected to reach a staggering 1 GW of capacity, making it one of the largest AI-dedicated clusters on the planet.


Quick Facts

FieldValue
Project NameStargate UAE Phase 1 200MW AI Compute Cluster
LocationAbu Dhabi
StatusPhase 1 Commissioned
CommissioningFebruary 12, 2026
Total IT Load200 MW (Phase 1)
Total Capacity1 GW (Full Buildout)
Tier LevelTier III+ (AI Optimized)
Project TypeAI Hyperscale / Sovereign Cloud

City Profile

HeaderDetails
City NameAbu Dhabi
Population~1.6 Million (City)
Urban Agglomeration~3.8 Million (Emirate)
City GDP~$310 Billion USD (Emirate)
Per Capita Income~$82,000 USD
City TierTier 1 Global Hub
Key StrengthsNuclear Power, Sovereign Funding, Strategic Neutrality

Companies Involved

HeaderDetails
Developer / Operator G42, FPT Corporation, & Viet Thai Group (VTG)
Strategic Infrastructure Partner Microsoft & SoftBank Group
Construction Contractor Specialized Hyperscale Consortium (Confidential)
MEP Engineering NVIDIA AI Infrastructure Team
Network Connectivity Cisco Systems (High-speed InfiniBand fabric)
Power Infrastructure Emirates Nuclear Energy Corp (ENEC) & TAQA

Technical Specifications

HeaderDetails
Power Capacity200 MW
UPS Redundancy2N+1 AI-Grade Redundancy
Cooling System Direct-to-Chip Liquid Cooling
Connectivity Ultra-low latency 800G InfiniBand Interconnects
PUE Target 1.12
Energy Mix Nuclear, Solar, and Gas (Hybrid Grid)

Milestones

HeaderDetails
Announcement May 2025
Construction Start July 2025
Phase 1 Go-Live February 12, 2026
Full Buildout Estimated 2029

Investment Details

HeaderDetails
Total InvestmentPart of $5.2 Billion G42-Microsoft Expansion
Funding Sovereign Wealth (ADIA/Mubadala) & Corporate Equity