Project Overview
The Stargate UAE project, officially commissioned for its first phase in February 2026, represents the pinnacle of sovereign AI infrastructure. Located within a dedicated 10-square-mile AI campus in Abu Dhabi, this facility is the result of a landmark international partnership involving G42, OpenAI, Microsoft, NVIDIA, and SoftBank. The project is designed specifically to meet the skyrocketing demand for "nation-scale" compute power, focusing on training large language models (LLMs) and performing high-density AI inferencing.
Phase 1 delivers 200 MW of IT capacity, utilizing the latest NVIDIA Grace Blackwell GB300 systems to provide unprecedented processing speeds. Unlike traditional data centers, Stargate is architected for extreme rack densities, likely exceeding 100 kW per rack, necessitating advanced liquid cooling solutions. The facility serves as a core engine for the UAE's "Vision 2030" goals, ensuring the nation has the sovereign capability to develop and host world-class AI applications locally.
Sustainability is integrated into the campus's DNA; the project is powered by a tri-source energy strategy including Nuclear (from the Barakah Plant), Solar, and Natural Gas. This ensures a stable, massive power supply required for the GB300 chips while maintaining a roadmap toward carbon neutrality. By providing local access to OpenAI’s models and Oracle’s sovereign cloud services, Stargate UAE eliminates the latency and data residency hurdles that previously slowed AI adoption in the Middle East. At its full buildout, the campus is expected to reach a staggering 1 GW of capacity, making it one of the largest AI-dedicated clusters on the planet.
Quick Facts
| Field | Value |
| Project Name | Stargate UAE Phase 1 200MW AI Compute Cluster |
| Location | Abu Dhabi |
| Status | Phase 1 Commissioned |
| Commissioning | February 12, 2026 |
| Total IT Load | 200 MW (Phase 1) |
| Total Capacity | 1 GW (Full Buildout) |
| Tier Level | Tier III+ (AI Optimized) |
| Project Type | AI Hyperscale / Sovereign Cloud |
City Profile
| Header | Details |
| City Name | Abu Dhabi |
| Population | ~1.6 Million (City) |
| Urban Agglomeration | ~3.8 Million (Emirate) |
| City GDP | ~$310 Billion USD (Emirate) |
| Per Capita Income | ~$82,000 USD |
| City Tier | Tier 1 Global Hub |
| Key Strengths | Nuclear Power, Sovereign Funding, Strategic Neutrality |
Companies Involved
| Header | Details |
| Developer / Operator | G42, FPT Corporation, & Viet Thai Group (VTG) |
| Strategic Infrastructure Partner | Microsoft & SoftBank Group |
| Construction Contractor | Specialized Hyperscale Consortium (Confidential) |
| MEP Engineering | NVIDIA AI Infrastructure Team |
| Network Connectivity | Cisco Systems (High-speed InfiniBand fabric) |
| Power Infrastructure | Emirates Nuclear Energy Corp (ENEC) & TAQA |
Technical Specifications
| Header | Details |
| Power Capacity | 200 MW |
| UPS Redundancy | 2N+1 AI-Grade Redundancy |
| Cooling System | Direct-to-Chip Liquid Cooling |
| Connectivity | Ultra-low latency 800G InfiniBand Interconnects |
| PUE Target | 1.12 |
| Energy Mix | Nuclear, Solar, and Gas (Hybrid Grid) |
Milestones
| Header | Details |
| Announcement | May 2025 |
| Construction Start | July 2025 |
| Phase 1 Go-Live | February 12, 2026 |
| Full Buildout | Estimated 2029 |
Investment Details
| Header | Details |
| Total Investment | Part of $5.2 Billion G42-Microsoft Expansion |
| Funding | Sovereign Wealth (ADIA/Mubadala) & Corporate Equity |