Start Campus Data Hub (SIN01)

Status: Operational (First Building, SIN01)   |   Location: Sines, Portugal (Atlantic Coast)


Project Overview

The Start Campus Data Hub in Sines, Portugal, is one of the most ambitious and strategically significant data center developments in Europe, positioning Sines as a new, green digital gateway. Officially launching its first building, SIN01, in Q2 2025, the project is rapidly transitioning from a plan into an operational reality. The entire campus is planned as a Gigascale facility, ultimately targeting a monumental total power capacity of 1.2 GW across six dedicated buildings, driven by a total investment that is expected to approach €10 Billion over the life of the project.

This project's core differentiator is its profound commitment to sustainability and efficiency. Leveraging Portugal's already high share of renewable energy, the campus is designed to operate on 100% renewable energy from the national grid. Crucially, its location on the Atlantic coast allows it to utilize a sophisticated Seawater Cooling (SWAC) system. This highly efficient, closed-loop process significantly reduces the facility's reliance on fresh water and mechanical cooling, resulting in an exceptionally low and industry-leading PUE target of approximately 1.1. This makes it a model for sustainable, energy-intensive AI, HPC, and Cloud workloads.

Strategically, the Sines location is paramount. It is the landing point for several high-capacity submarine fiber-optic cables, including the 2Africa and BlueMed systems, making it an ideal, low-latency interconnection hub between Europe, the Americas, and Africa. The SIN01 building represents the initial phase, providing a first wave of critical capacity to anchor the campus and attract major Hyperscale operators looking for highly redundant (Tier IV-ready), sustainable digital infrastructure that is optimized for the power-hungry demands of Artificial Intelligence deployments.


Quick Facts

FieldValue
Project NameStart Campus Data Hub (SIN01)
LocationSines, Portugal (Atlantic Coast)
StatusOperational (First Building, SIN01)
CommissioningQ2 2025 (SIN01 Opened)
Total IT Load15 MW (Initial Capacity of SIN01)
Total Capacity1.2 GW (Total Campus Gigascale Plan)
Tier LevelTier III+ to Tier IV Ready (Designed for High Redundancy)`
Project TypeHyperscale, Cloud, HPC, and AI Data Center Campus

City Profile

HeaderDetails
City NameSines, Portugal
PopulationNot specified
Urban AgglomerationNot specified
City GDPNot specified
Per Capita IncomeNot specified
City TierNot specified
Key StrengthsExcellent Seawater Access, Proximity to National Power Grid, Submarine Cable Hub

Companies Involved

HeaderDetails
Developer / Operator Start Campus
Strategic Infrastructure Partner Government of Portugal, Major European Utilities
Construction Contractor (Not Publicly Disclosed)
MEP Engineering (Not Publicly Disclosed)
Network Connectivity Direct access to Sines high-capacity submarine cable landing station (e.g., 2Africa, BlueMed)
Power Infrastructure Direct connection to Portugal's high-capacity national grid

Technical Specifications

HeaderDetails
Power Capacity1.2 GW (Secured Total Grid Capacity)
UPS RedundancyN+1 / 2N-Ready
Cooling System Seawater Cooling (SWAC), Closed-Loop System
Connectivity Submarine Cable Landing Station (Sines is a major European gateway)
PUE Target ~1.1 (Extremely Low, due to Seawater Cooling)
Energy Mix 100% Renewable Energy (from Portugal's Green Grid)

Milestones

HeaderDetails
Announcement 2021
Construction Start 2023
Phase 1 Go-Live 6 Buildings Planned
Full Buildout 2030+

Investment Details

HeaderDetails
Total Investment€8.5 - €9.97 Billion (Total Campus Investment)
Funding Institutional Investment, Project Financing

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.