Status: Pre-Development & AI Retrofit Phase (Site Acquired January 2026) | Location: 1341 Sycamore View Road, Memphis, Tennessee 38134, USA (38,500 sq ft retrofitted sole-tenant facility footprint)
The STEM Practice Memphis Data Center is a specialized 9 MW artificial intelligence infrastructure development located at 1341 Sycamore View Road in Memphis, Shelby County, Tennessee, United States. Developed by Golden Acquisitions in partnership with The STEM Practice, a Texas-based AI platform operator and Oracle partner, the project repurposes an existing 38,500-square-foot, four-story commercial building for high-density computing. Designed as a sovereign AI reasoning node, the facility reflects a growing focus on infrastructure capable of supporting advanced AI applications while making use of existing commercial properties rather than relying entirely on new-build data center campuses.
The planned 9 MW capacity is intended to support AI workloads that require substantial computing resources, including reasoning tasks and other computationally intensive applications. As organizations move beyond AI model training toward deploying models in real-world environments, demand is growing for infrastructure capable of processing requests, generating outputs, and supporting enterprise AI services. High-density AI deployments require careful planning for electricity delivery, cooling, server configurations, and network connectivity. The project’s association with The STEM Practice and its Oracle partnership provides a connection to the broader AI and enterprise technology ecosystem, although specific details about the facility’s GPU configuration, IT load allocation, cooling design, power supply, and operational schedule have not been provided in the supplied information.
The Memphis project also illustrates how existing commercial buildings may be adapted for specialized digital infrastructure, subject to the technical and structural requirements of data center operations. Its urban location provides a base for serving regional businesses and organizations seeking access to AI computing capabilities. The project’s sovereign AI positioning suggests an emphasis on controlled infrastructure for AI workloads, but the specific data governance, residency, and customer-access arrangements remain unspecified. Its ultimate capabilities will depend on the completed facility design, power and cooling systems, and commissioning process. Nevertheless, the STEM Practice Memphis Data Center represents a targeted investment in AI-focused infrastructure, combining building reuse with a planned 9 MW capacity for advanced reasoning
| Field | Value |
|---|---|
| Project Name | The STEM Practice Memphis Data Center 9MW Tennessee |
| Location | 1341 Sycamore View Road, Memphis, Tennessee 38134, USA (38,500 sq ft retrofitted sole-tenant facility footprint) |
| Status | Pre-Development & AI Retrofit Phase (Site Acquired January 2026) |
| Project Type | Retrofitted Sole-Tenant Sovereign AI Inference Node & Colocation Data Center |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Memphis |
| Population | 609,647 |
| Urban Agglomeration | Approximately 1.34 million (Memphis metropolitan area, 2025 estimate) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.