Status: Planned | Location: 35 North 1193 East, Declo, Cassia County, Idaho 83323, USA
The TerraVolt Declo Campus is a planned 240 MW behind-the-meter, off-grid hyperscale and artificial intelligence (AI) data center development located on a 1,077-acre (435.8-hectare) parcel zoned for Multiple-Use at 35 North 1193 East, outside Declo in Cassia County, Idaho. Announced on October 30, 2026, by TerraVolt Holdings, Inc., a powered-land development company headquartered in Tustin, California, the project represents a strategic approach to addressing the growing demand for large-scale digital infrastructure and AI computing capacity. Led by Chairman and CEO Joel Stone, TerraVolt is developing the campus around an independent power model designed to reduce dependence on conventional utility infrastructure and avoid lengthy grid interconnection delays. The planned 240 MW capacity is intended to support hyperscale cloud operations, high-performance computing (HPC), and AI workloads that require substantial and reliable electricity supplies. Its behind-the-meter configuration will allow the campus to operate using dedicated, islanded on-site power generation rather than relying entirely on electricity delivered through the public grid. This approach is particularly relevant as data center developers face increasing challenges associated with limited grid capacity, transmission constraints, and lengthy power connection timelines. The substantial 1,077-acre site also provides significant land availability for developing large-scale facilities and potentially accommodating future infrastructure expansion. Located in southern Idaho, the Declo campus adds to the region's potential as an emerging destination for energy-intensive digital infrastructure investments. By combining a large development site with an independent power strategy, TerraVolt aims to establish a purpose-built data center campus capable of supporting the growing infrastructure requirements of the hyperscale cloud and AI industries.
| Field | Value |
|---|---|
| Project Name | TerraVolt Declo Campus Data Center Idaho |
| Location | 35 North 1193 East, Declo, Cassia County, Idaho 83323, USA |
| Status | Planned |
| Project Type | Master-Planned Behind-the-Meter Hyperscale AI Campus, Neocloud Hub & Off-Grid Gas-Powered Digital Infrastructure Park |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Declo |
| Population | Estimated 350 to 450 residents |
| Urban Agglomeration | Estimated 1,000 to 1,500 residents across Declo and nearby rural communities |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.