Yondr Group Frankfurt Data Center Campus: 40MW Hyperscale Hub

Status: Fully Operational / Active Campus Deployment   |   Location: In der Niederwiese 3, 65474 Bischofsheim, Greater Frankfurt Metropolitan Area, Germany


Project Overview

Yondr Group's Frankfurt Data Center Campus in Bischofsheim is a flagship hyperscale digital infrastructure development strategically located just south of central Frankfurt, one of Europe’s most important cloud and interconnection markets within the FLAP (Frankfurt, London, Amsterdam, and Paris) region. Designed to meet the growing requirements of hyperscale cloud providers, enterprise customers, artificial intelligence (AI), machine learning (ML), and high-performance computing (HPC) workloads, the campus delivers 40 MW of scalable IT power capacity through a phased development approach that enables efficient expansion as customer demand increases. The facility has been engineered in compliance with Germany’s Energy Efficiency Act (EnEfG), reflecting Yondr Group’s commitment to operational efficiency and long-term environmental sustainability. Powered entirely by 100% renewable electricity, the campus further enhances its sustainability credentials through rooftop solar photovoltaic (PV) installations, green living walls that improve biodiversity and environmental performance, electric vehicle (EV) charging infrastructure, and readiness for district heating and waste heat recovery to support the surrounding municipality. The campus is purpose-built for high-density computing environments with resilient power and cooling infrastructure capable of supporting next-generation GPU clusters and AI applications. As a carrier-neutral facility, it provides ultra-low-latency connectivity to DE-CIX, one of the world’s largest internet exchanges, along with direct access to major European cloud and fiber corridors, enabling seamless hybrid and multi-cloud deployments. Combining scalable hyperscale capacity, AI-ready infrastructure, sustainable operations, and exceptional connectivity, Yondr Group’s Frankfurt Data Center Campus serves as a future-ready digital infrastructure platform supporting digital transformation and cloud growth across Germany and Europe.


Quick Facts

FieldValue
Project NameYondr Group Frankfurt Data Center Campus: 40MW Hyperscale Hub
LocationIn der Niederwiese 3, 65474 Bischofsheim, Greater Frankfurt Metropolitan Area, Germany
StatusFully Operational / Active Campus Deployment
CommissioningPhase 1 (20MW) Go-Live: Late 2024 / Full 40MW Campus Completion: July 2025
Total IT Load40 MW Critical IT Power Capacity Allocation
Total Capacity40 MW Total Utility Power Allocation across a multi-phase hyperscale footprint
Tier LevelTier III Compliant Architecture / LEED Gold Target, ISO 27001, ISO 9001, SOC 1 Type II, SOC 2 Type II Certified
Project TypePurpose-Built Hyperscale, High-Density AI-Ready Colocation & Cloud Hub

City Profile

HeaderDetails
City NameFrankfurt
Population7,80,000
Urban Agglomeration5.8 million
City GDP€160.8 billion
Per Capita Income$101,000 USD
City TierTier 1
Key StrengthsHosting DE-CIX, the worlds largest Internet Exchange Point; financial capital of the Eurozone; strict sustainability mandates driving innovation.

Companies Involved

HeaderDetails
Developer / Operator Yondr Group
Strategic Infrastructure Partner Mainova AG / Regional Utility Operators & Municipality of Bischofsheim
Construction Contractor Mercury Engineering (Lead General Contractor) & Specialized Mission-Critical EPC Partners
MEP Engineering Yondr Global Technical Infrastructure & Critical Facilities Engineering Teams
Network Connectivity Carrier-neutral host with dual underground subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct subterranean dark fiber links connecting to Frankfurt's core carrier hubs and DE-CIX (Frankfurt Internet Exchange).
Power Infrastructure Dedicated 110kV high-voltage utility grid substation, static distributed 2N / N+1 medium-voltage uninterruptible power supply (UPS) modules, automated switchgear, and backup diesel generator plants.

Technical Specifications

HeaderDetails
Power Capacity40 MW Total Secured Utility Power Capacity Allocation
UPS Redundancy2N / N+1 Distributed Redundant Static UPS Architecture
Cooling System Closed-loop efficient air cooling system operating with zero water waste design, hot/cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density GPU racks, and automated BMS environmental controls.
Connectivity Carrier-neutral access with direct low-latency cloud express on-ramps and cross-connect options across European networks.
PUE Target < 1.25 Annualized Operational Design PUE (EnEfG compliant)
Energy Mix 100% Certified Green Renewable Energy matched via PPAs, supported by rooftop solar PV arrays.

Milestones

HeaderDetails
Announcement November 2021
Construction Start 2022
Phase 1 Go-Live November 2024 (20 MW)
Full Buildout July 2025 (Full 40 MW Operational)

Investment Details

HeaderDetails
Total InvestmentEstimated €200,000,000 EUR to €300,000,000 EUR
Funding Corporate Capital Expenditure & Infrastructure Financing by Yondr Group / Apollo Global Management