Yotta D1: 30MW Hyperscale Data Center in Greater Noida
Status: Fully Operational / AI-Native Infrastructure Upgrades Active (June 2026) | Location: Plot No 7, Tusiana Village, Knowledge Park V, Greater Noida, Tusyana, Uttar Pradesh 201306
Project Overview
Functioning as the premier foundational anchor of North India's first hyperscale data center park, Yotta D1 is a hyper-connected, high-density facility strategically located in the Delhi-NCR region. Developed across a 20-acre master campus designed to accommodate six interconnected data center buildings, the facility currently operates with an active 30 MW IT load capacity, providing a robust and scalable platform for a wide range of digital infrastructure requirements. Engineered from the ground up to support hyperscale operations, Yotta D1 plays a critical role in enabling sovereign cloud infrastructure, hosting complex regional government databases through the National Informatics Centre (NIC), and delivering secure enterprise colocation services. Its strategic location and advanced design make it a key component of India's rapidly expanding digital ecosystem. Following extensive structural upgrades and infrastructure enhancements completed during 2025 and 2026, the facility has further strengthened its capabilities to support next-generation computing demands. Yotta D1 now serves as a primary hub for Shakti Cloud, integrating high-density computing environments, advanced GPU-powered clusters, and AI-optimized infrastructure capable of supporting large-scale training and inference workloads. The facility incorporates resilient power and cooling systems, advanced network connectivity, comprehensive security controls, and highly redundant operational frameworks to ensure maximum reliability and performance. By combining hyperscale capacity, government-grade infrastructure, and AI-ready capabilities within a future-ready campus environment, Yotta D1 plays a vital role in accelerating cloud adoption, digital transformation, and artificial intelligence innovation across North India. The facility continues to provide the secure, scalable, and high-performance foundation required to support emerging technologies, critical public-sector services, and the growing demands of enterprises operating in an increasingly data-driven economy.
Quick Facts
| Field | Value |
| Project Name | Yotta D1: 30MW Hyperscale Data Center in Greater Noida |
| Location | Plot No 7, Tusiana Village, Knowledge Park V, Greater Noida, Tusyana, Uttar Pradesh 201306 |
| Status | Fully Operational / AI-Native Infrastructure Upgrades Active (June 2026) |
| Commissioning | Formally inaugurated and went live on October 31, 2022; high-density compute upgrades finalized through Mid-2026 |
| Total IT Load | 30.0 MW (Fully provisioned continuous active IT load across all operational server halls) |
| Total Capacity | Spans a gross built-up footprint of 300,000 sq ft across a ground-plus-seven-floors industrial design, accommodating up to 5,000 server racks. |
| Tier Level | Tier III Certified (Uptime Institute Tier Standard Design & Construction Certified / Maintained to Tier IV operational resilience guidelines) |
| Project Type | Operational Operationalized Hyperscale & Distributed AI Cloud Core Node |
City Profile
| Header | Details |
| City Name | Delhi |
| Population | ~16.8 million |
| Urban Agglomeration | ~32 million (Delhi Urban Agglomeration/NCR) |
| City GDP | Approximately US$170–180 billion |
| Per Capita Income | Approximately ₹460,000–₹500,000 per year |
| City Tier | Tier 1 |
| Key Strengths | National capital, government and administrative center, strong service economy, IT and telecom sectors, extensive metro network, world-class healthcare, educational institutions, and major business districts |
Companies Involved
| Header | Details |
| Developer / Operator | Yotta Data Services Private Limited |
| Strategic Infrastructure Partner | Greater Noida Industrial Development Authority (GNIDA) / Invest UP / Ministry of Electronics and Information Technology (MeitY). |
| Construction Contractor | Hiranandani Construction Division. |
| MEP Engineering | Automated high-capacity Coolant Distribution Units (CDUs), high-output rack manifolds, and multi-redundant mechanical switchgears. |
| Network Connectivity | Dense carrier-neutral architecture utilizing 3 completely independent, geographically isolated underground dark fiber entry pathways. |
| Power Infrastructure | Robust dual-feeder transmission pipeline running directly from a massive, dedicated 220 kV on-site substation connected to the state grid. |
Technical Specifications
| Header | Details |
| Power Capacity | 30.0 MW Total Active IT Load Profile |
| UPS Redundancy | Distributed Redundant N+2 Topology with isolated active lithium-ion battery modules and 48-hour continuous standby generator backup. |
| Cooling System | Advanced Chilled-Water Loop Matrix featuring N+2 Redundant Chillers, smart containment zones, and thermal storage integration. |
| Connectivity | Single-point connection to all tier-1 domestic telecom operators, major national internet exchanges, and primary global cloud environments. |
| PUE Target | < 1.40 (Optimized via variable speed drive chillers and automated cooling automation software) |
| Energy Mix | Integrated with regional open-access renewable power agreements, prioritizing solar arrays to offset campus carbon footprints. |
Milestones
| Header | Details |
| Announcement | October 2020 |
| Construction Start | Early 2021 |
| Phase 1 Go-Live | October 31, 2022 |
| Full Buildout | Operational with Active AI Cluster Scaling through 2026 |
Investment Details
| Header | Details |
| Total Investment | Approximately $260 Million (Part of the larger INR 7,000-Crore master-planned Greater Noida Data Center Park blueprint) |
| Funding | Core equity funding via Hiranandani Group capital reserves, supplemented by long-term enterprise leasing cash cycles. |