Yotta D1: 30MW Hyperscale Data Center in Greater Noida

Status: Fully Operational / AI-Native Infrastructure Upgrades Active (June 2026)   |   Location: Plot No 7, Tusiana Village, Knowledge Park V, Greater Noida, Tusyana, Uttar Pradesh 201306


Project Overview

Functioning as the premier foundational anchor of North India's first hyperscale data center park, Yotta D1 is a hyper-connected, high-density facility strategically located in the Delhi-NCR region. Developed across a 20-acre master campus designed to accommodate six interconnected data center buildings, the facility currently operates with an active 30 MW IT load capacity, providing a robust and scalable platform for a wide range of digital infrastructure requirements. Engineered from the ground up to support hyperscale operations, Yotta D1 plays a critical role in enabling sovereign cloud infrastructure, hosting complex regional government databases through the National Informatics Centre (NIC), and delivering secure enterprise colocation services. Its strategic location and advanced design make it a key component of India's rapidly expanding digital ecosystem. Following extensive structural upgrades and infrastructure enhancements completed during 2025 and 2026, the facility has further strengthened its capabilities to support next-generation computing demands. Yotta D1 now serves as a primary hub for Shakti Cloud, integrating high-density computing environments, advanced GPU-powered clusters, and AI-optimized infrastructure capable of supporting large-scale training and inference workloads. The facility incorporates resilient power and cooling systems, advanced network connectivity, comprehensive security controls, and highly redundant operational frameworks to ensure maximum reliability and performance. By combining hyperscale capacity, government-grade infrastructure, and AI-ready capabilities within a future-ready campus environment, Yotta D1 plays a vital role in accelerating cloud adoption, digital transformation, and artificial intelligence innovation across North India. The facility continues to provide the secure, scalable, and high-performance foundation required to support emerging technologies, critical public-sector services, and the growing demands of enterprises operating in an increasingly data-driven economy.


Quick Facts

FieldValue
Project NameYotta D1: 30MW Hyperscale Data Center in Greater Noida
LocationPlot No 7, Tusiana Village, Knowledge Park V, Greater Noida, Tusyana, Uttar Pradesh 201306
StatusFully Operational / AI-Native Infrastructure Upgrades Active (June 2026)
CommissioningFormally inaugurated and went live on October 31, 2022; high-density compute upgrades finalized through Mid-2026
Total IT Load30.0 MW (Fully provisioned continuous active IT load across all operational server halls)
Total CapacitySpans a gross built-up footprint of 300,000 sq ft across a ground-plus-seven-floors industrial design, accommodating up to 5,000 server racks.
Tier LevelTier III Certified (Uptime Institute Tier Standard Design & Construction Certified / Maintained to Tier IV operational resilience guidelines)
Project TypeOperational Operationalized Hyperscale & Distributed AI Cloud Core Node

City Profile

HeaderDetails
City NameDelhi
Population~16.8 million
Urban Agglomeration~32 million (Delhi Urban Agglomeration/NCR)
City GDPApproximately US$170–180 billion
Per Capita IncomeApproximately ₹460,000–₹500,000 per year
City TierTier 1
Key StrengthsNational capital, government and administrative center, strong service economy, IT and telecom sectors, extensive metro network, world-class healthcare, educational institutions, and major business districts

Companies Involved

HeaderDetails
Developer / Operator Yotta Data Services Private Limited
Strategic Infrastructure Partner Greater Noida Industrial Development Authority (GNIDA) / Invest UP / Ministry of Electronics and Information Technology (MeitY).
Construction Contractor Hiranandani Construction Division.
MEP Engineering Automated high-capacity Coolant Distribution Units (CDUs), high-output rack manifolds, and multi-redundant mechanical switchgears.
Network Connectivity Dense carrier-neutral architecture utilizing 3 completely independent, geographically isolated underground dark fiber entry pathways.
Power Infrastructure Robust dual-feeder transmission pipeline running directly from a massive, dedicated 220 kV on-site substation connected to the state grid.

Technical Specifications

HeaderDetails
Power Capacity30.0 MW Total Active IT Load Profile
UPS RedundancyDistributed Redundant N+2 Topology with isolated active lithium-ion battery modules and 48-hour continuous standby generator backup.
Cooling System Advanced Chilled-Water Loop Matrix featuring N+2 Redundant Chillers, smart containment zones, and thermal storage integration.
Connectivity Single-point connection to all tier-1 domestic telecom operators, major national internet exchanges, and primary global cloud environments.
PUE Target < 1.40 (Optimized via variable speed drive chillers and automated cooling automation software)
Energy Mix Integrated with regional open-access renewable power agreements, prioritizing solar arrays to offset campus carbon footprints.

Milestones

HeaderDetails
Announcement October 2020
Construction Start Early 2021
Phase 1 Go-Live October 31, 2022
Full Buildout Operational with Active AI Cluster Scaling through 2026

Investment Details

HeaderDetails
Total InvestmentApproximately $260 Million (Part of the larger INR 7,000-Crore master-planned Greater Noida Data Center Park blueprint)
Funding Core equity funding via Hiranandani Group capital reserves, supplemented by long-term enterprise leasing cash cycles.