ML1 Data Center (A-FLOW Campus)

Status: Live / Operational   |   Location: Biñan, Laguna


Project Overview

Launched on January 19, 2026, the ML1 Data Center is the first building of the A-FLOW campus in Biñan, Laguna. This facility marks the high-profile entry of FLOW Digital Infrastructure (backed by PAG) and AyalaLand Logistics Holdings into the Philippine hyperscale market. The project is strategically located in the "Laguna Tech Corridor," providing a critical disaster recovery and secondary site for the congested Metro Manila area.

The ML1 facility is designed to meet the skyrocketing demand for local data hosting driven by the Philippines' high social media and e-commerce penetration. Architecturally, the building is "AI-ready," featuring flexible floor planning to accommodate future liquid cooling requirements as local enterprises begin adopting generative AI. As part of a larger three-building campus, ML1 provides the foundational infrastructure for global cloud service providers (CSPs) and content delivery networks (CDNs) to localize their traffic. By establishing this hub outside the immediate capital, A-FLOW is pioneering the decentralization of digital infrastructure in the Philippines. The project is expected to create over 500 high-tech jobs and significantly improve internet latency for the 30+ million residents of the Greater Manila Area. Furthermore, the campus utilizes sustainable design practices, targeting LEED Gold certification and integrating with AyalaLand’s broader renewable energy initiatives.


Quick Facts

FieldValue
Project NameML1 Data Center (A-FLOW Campus)
LocationBiñan, Laguna
StatusLive / Operational
CommissioningJanuary 19, 2026
Total IT Load6 MW (Phase 1)
Total Capacity36 MW (Full Campus build-out)
Tier LevelTier III Certified
Project TypeGreenfield Hyperscale Campus

City Profile

HeaderDetails
City NameBiñan
Population≈ 407,000 (Biñan City, Laguna)
Urban Agglomeration≈ 3.4 million (Laguna province urban belt / CALABARZON influence)
City GDP≈ USD 6–7 billion (estimated, driven by manufacturing, electronics, and services)
Per Capita Income≈ USD 6,500–7,000 per year
City TierTier 2 City (Emerging Industrial & Technology Hub)
Key StrengthsStrategic location near Metro Manila, strong manufacturing and electronics base, presence of industrial parks and PEZA zones, skilled workforce, robust logistics connectivity, growing IT-BPM and data-driven industries.

Companies Involved

HeaderDetails
Developer / Operator a-flow
Strategic Infrastructure Partner PAG (Private Equity Backer)
Construction Contractor EEI Corporation / Local Partners
MEP Engineering Aurecon
Network Connectivity Globe Telecom / PLDT / Converge ICT
Power Infrastructure Meralco (Manila Electric Company)

Technical Specifications

HeaderDetails
Power Capacity6 MW (Phase 1) / 36 MW Total Campus
UPS RedundancyN+1 Distributed Redundancy
Cooling System Air-cooled chillers with variable speed fans
Connectivity Carrier-neutral with diverse underground ducting
PUE Target 1.35
Energy Mix Grid-sourced with I-RECs (Renewable Energy Certificates)

Milestones

HeaderDetails
Announcement October 2022
Construction Start December 2024
Phase 1 Go-Live January 19, 2026
Full Buildout 2027

Investment Details

HeaderDetails
Total Investment~US$ 200 Million (Campus Total)
Funding Joint Venture Equity & Debt Financing