Project Overview

Formally confirmed in late 2025 and seeing massive land-allotment increases as of March 2026, the Adani-Google IndiaAI Hub is a $15 billion (₹1.25 Lakh Crore) investment designed to be Google’s largest AI hub outside the United States. The project is spread across a massive 601.4-acre footprint in Andhra Pradesh, with Tarluwada serving as the principal 266-acre hub. This facility is unique because it integrates an "energy-to-compute" ecosystem; it will be powered entirely by renewable energy sourced from Adani's Khavda Renewable Park. The hub will house Google’s full AI stack, including proprietary TPU (Tensor Processing Unit) and GPU clusters for deep learning. Beyond compute, the site will serve as a new international subsea gateway, landing multiple high-capacity cables to provide route diversity from Mumbai and Chennai. This project is a cornerstone of the Viksit Bharat 2047 vision, expected to create tens of thousands of high-tech jobs and establish a "Sovereign AI" foundation for Indian startups and government services.


Quick Facts

FieldValue
Project NameAdani-Google Vizag: $15B 1GW AI Data Center Hub India
LocationTarluwada, Visakhapatnam
StatusGroundbreaking / Land Handover (March 2026)
CommissioningPhase 1 (Core AI Hub): H1 2027
Total IT Load1,000 MW (1 GW)
Total CapacityMulti-campus cluster across 3 districts
Tier LevelTier IV (Sovereign AI Optimized)
Project TypeGigawatt-Scale AI Mega-Campus

City Profile

HeaderDetails
City NameVisakhapatnam (Vizag)
PopulationApproximately 2.3 Million (City)
Urban AgglomerationNot specified (City-level focus)
City GDPNot readily available in public announcement
Per Capita IncomeNot readily available in public announcement
City TierTier-1/Emerging Tier-1 Digital Hub
Key StrengthsStrategic location on the eastern coast; Existing port/industrial infrastructure; Emerging hub for subsea cable landing stations (CLS); Strong government support for data center development.

Companies Involved

HeaderDetails
Developer / Operator Ascent Corp
Strategic Infrastructure Partner Andhra Pradesh Industrial Infrastructure Corp (APIIC).
Construction Contractor Adani Infra (India) Ltd.
MEP Engineering AdaniConneX Global Engineering / Google R&D.
Network Connectivity New international subsea gateway; direct link to Google terrestrial fiber.
Power Infrastructure 100% Renewable energy via Adani Green Energy (Solar/Wind).

Technical Specifications

HeaderDetails
Power Capacity1,000 MW (Gigawatt Scale)
UPS Redundancy$2N$ Fully Redundant
Cooling System Closed-loop liquid cooling for AI clusters + industrial air-cooling.
Connectivity Carrier-neutral gateway with high-capacity subsea cable landings.
PUE Target < 1.15
Energy Mix 100% Green (Adani Khavda Park + Energy Storage Systems).

Milestones

HeaderDetails
Announcement October 14, 2025
Construction Start March 2026 (Site Preparation)
Phase 1 Go-Live H1 2027
Full Buildout 2030

Investment Details

HeaderDetails
Total Investment$15 Billion
Funding Joint Capital from Alphabet Inc. and Adani Group.