AdaniConneX Navi Mumbai 1000MW Hyperscale Data Center Campus Maharashtra
Status: Under Advanced Multi-Phase Development | Location: Premier hyperscale data center corridor, Navi Mumbai, Maharashtra
Project Overview
Adani Green Energy and Adani Energy Solutions (managing lifecycle energy security, transmission infrastructure, and green power lines).
Quick Facts
| Field | Value |
| Project Name | AdaniConneX Navi Mumbai 1000MW Hyperscale Data Center Campus Maharashtra |
| Location | Premier hyperscale data center corridor, Navi Mumbai, Maharashtra |
| Status | Under Advanced Multi-Phase Development |
| Commissioning | Phased Ready-For-Service (RFS) timelines scaling significantly from late 2026 onwards |
| Total IT Load | Gigawatt-scale Master Plan (Up to 1,000 MW potential capacity) |
| Total Capacity | India's largest localized data center infrastructure park designed to act as the primary cloud and AI landing gateway for global hyperscalers. |
| Tier Level | Tier IV Architecture Blueprint (Designed for 99.999% Availability) |
| Project Type | Greenfield Hyperscale, Wholesale Colocation, and AI-Native Supercomputing Campus |
City Profile
| Header | Details |
| City Name | Navi Mumbai |
| Population | ~1.12 million |
| Urban Agglomeration | 22+ million (Mumbai Metropolitan Region) |
| City GDP | Part of the Mumbai Metropolitan Region economy, one of India's largest economic centers |
| Per Capita Income | Approximately ₹350,000–₹450,000 per year |
| City Tier | Tier 1 |
| Key Strengths | Planned urban infrastructure, IT parks, business hubs, JNPT port connectivity, excellent transportation network, educational institutions, growing data center ecosystem |
Companies Involved
| Header | Details |
| Developer / Operator | AdaniConneX |
| Strategic Infrastructure Partner | Adani Green Energy and Adani Energy Solutions (managing lifecycle energy security, transmission infrastructure, and green power lines). |
| Construction Contractor | Adani Infrastructure EPC division along with global specialist sub-contractors. |
| MEP Engineering | EdgeConneX global engineering teams paired with domestic specialists implementing automated facility management systems and variable-density cooling footprints. |
| Network Connectivity | Ultra-high-density Optical Ground Wire (OPGW) fiber networks directly tying the campus into major international subsea cable landing stations and western network nodes. |
| Power Infrastructure | Massive dedicated on-site high-voltage sub-stations tied directly into extra-high-voltage regional transmission grids to protect against peak load fluctuations. |
Technical Specifications
| Header | Details |
| Power Capacity | Highly customizable power distribution systems built to support variable densities from standard cloud compute up to extreme multi-kW AI GPU clusters. |
| UPS Redundancy | Isolated, fault-tolerant 2N or N+1 continuous power topologies backed by massive industrial battery storage banks and ultra-fast failover generators. |
| Cooling System | Intelligent, water-efficient closed-loop air and direct-to-chip liquid cooling readiness, optimizing cooling performance in tropical climates. |
| Connectivity | Carrier-neutral campus layout containing redundant Meet-Me-Rooms (MMRs) per building for seamless integration with all major domestic telecom operators. |
| PUE Target | Highly optimized operational PUE designed to meet strict international environmental and corporate efficiency mandates. |
| Energy Mix | Up to 100% renewable energy matching strategy, directly supplied by Adani’s expanding solar-wind hybrid generation networks across India. |
Milestones
| Header | Details |
| Announcement | Initial multi-phase master plan established |
| Construction Start | Major international banking framework finalized |
| Phase 1 Go-Live | Structural shells and grid links executed |
| Full Buildout | Major capacity blocks scheduled for late 2026 deployment and scaling progressively through the decade |
Investment Details
| Header | Details |
| Total Investment | Multi-billion dollar infrastructure deployment framework (part of a massive $1.44 Billion internationally secured construction financing package). |
| Funding | Consortium-backed international green construction finance facilities along with joint-venture capital allocation. |