Digital Edge Palava 270MW Hyperscale Data Center Campus Mumbai

Status: Announced / Initial Planning & Site Preparation   |   Location: 30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava


Project Overview

Digital Edge is accelerating India's AI and cloud infrastructure ambitions through the development of a landmark 270MW hyperscale data center campus near Mumbai, following the acquisition of strategically located land valued at approximately ₹10 billion (US$104 million) from master developer Lodha. Situated within the environmentally focused Palava Green Integrated Data Centre Park, the project represents one of the largest single-site digital infrastructure developments in the Mumbai Metropolitan Region and is expected to play a pivotal role in meeting the country's rapidly expanding demand for cloud computing, artificial intelligence, enterprise digital transformation, and high-performance computing services. The campus has been purpose-built to support next-generation workloads, featuring infrastructure capable of accommodating ultra-high rack densities, advanced liquid and hybrid cooling technologies, scalable power distribution systems, and resilient network connectivity designed for AI training clusters and large-scale cloud deployments. Its location offers direct access to Mumbai's extensive fiber ecosystem, submarine cable landing stations, reliable utility infrastructure, and a growing enterprise customer base, making it an ideal destination for hyperscale cloud providers and AI companies seeking low-latency digital infrastructure. By integrating sustainable design principles within the Palava Green Integrated Data Centre Park, including energy-efficient building systems, optimized water management, and renewable energy integration opportunities, Digital Edge aims to deliver a future-ready facility that balances massive computing capacity with long-term environmental responsibility while strengthening India's position as one of Asia's fastest-growing digital infrastructure markets.


Quick Facts

FieldValue
Project NameDigital Edge Palava 270MW Hyperscale Data Center Campus Mumbai
Location30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava
StatusAnnounced / Initial Planning & Site Preparation
CommissioningPhased development planned to scale across multi-year buildout phases
Total IT Load~270.0 MW (Full buildout potential across the campus)
Total CapacityMassively scaled to support extensive multi-megawatt deployments for hyperscalers, global cloud providers, and high-density AI compute frameworks.
Tier LevelTier III / Tier IV Compliant Architecture
Project TypeGreenfield Mega-Campus Development

City Profile

HeaderDetails
City NameMumbai
Population~18.4 Million (Urban Agglomeration)
Urban Agglomeration~18.4 Million (Mumbai UA)
City GDPHighest in India (Financial & Commercial Capital)
Per Capita IncomeHigh (Economic Engine of India)
City TierTier 1 Data Center Hub
Key StrengthsIndias Primary financial hub, highest fiber density, 9+ subsea cable landing stations, strong power grid access

Companies Involved

HeaderDetails
Developer / Operator Digital Edge
Strategic Infrastructure Partner Lodha (providing integrated park infrastructure, initial utility access, and zoning support).
Construction Contractor Leading global and domestic Tier-1 mission-critical EPC contractors.
MEP Engineering Advanced mechanical, electrical, and plumbing engineering designed for massive power scaling and optimized cooling distribution.
Network Connectivity Multiple redundant carrier entry paths with low-latency fiber rings connecting directly to Mumbai’s primary internet exchanges and subsea cable landing stations.
Power Infrastructure High-voltage dedicated substation infrastructure integrated with the local utility grid to ensure multi-megawatt continuous power paths.

Technical Specifications

HeaderDetails
Power CapacityScalable multi-stage power blocks engineered to deliver up to 270MW of total capability at full buildout.
UPS RedundancyHigh-efficiency 2N or isolated parallel N+1 continuous UPS configurations backed by industrial battery systems.
Cooling System Future-ready design structured to support a hybrid of high-efficiency air cooling and advanced liquid cooling configurations (including direct-to-chip readiness) to handle high-kW rack densities.
Connectivity Dual carrier-neutral Meet-Me-Rooms providing deep peering capabilities, direct cloud on-ramps, and dark fiber access.
PUE Target Highly optimized design PUE utilizing advanced thermal management, smart variable cooling loops, and automated building management systems (BMS).
Energy Mix Strongly aligned with the park's green mandate, targeting heavy utilization of renewable energy sources and sustainable power procurement structures.

Milestones

HeaderDetails
Announcement Mid 2026
Construction Start Late 2026
Phase 1 Go-Live Scheduled Ahead
Full Buildout NA

Investment Details

HeaderDetails
Total InvestmentMulti-billion dollar overarching capital expenditure deployment (Initial land acquisition valued at ~₹10 Billion / $104M USD).
Funding Backed by Digital Edge platform capital, institutional investors, and global infrastructure funds.

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.