AirTrunk JHB1 Johor Bahru

Status: Operational (Phase 1) / Expanding   |   Location: Jalan Johor Jaya, Johor Bahru, Malaysia


Project Overview

AirTrunk JHB1 is a massive 150MW+ hyperscale data center campus located in Johor Bahru, Malaysia. Spanning over 10.3 hectares (approx. 25 acres), it serves as a critical digital gateway for Southeast Asia, strategically positioned to handle the spillover demand from land-constrained Singapore. JHB1 is a flagship "AI-ready" facility, featuring AirTrunk’s pioneering direct-to-chip liquid cooling technology alongside traditional indirect evaporative cooling. This allows the facility to support the extreme power densities required for high-performance computing (HPC) and Artificial Intelligence workloads.

A standout feature of JHB1 is its industry-leading design Power Usage Effectiveness (PUE) of 1.15, making it one of the most sustainable and efficient data centers in the region. The project is backed by a massive 132kV private substation and incorporates a "solar-ready" roof capable of generating over 1MW of onsite renewable power. Through a strategic partnership with Malaysia’s utility provider (TNB) and a Virtual Power Purchase Agreement (VPPA), the campus is a central pillar in Malaysia’s "MADANI" initiative to transform Johor into a premier global AI and cloud hub.


Quick Facts

FieldValue
Project NameAirTrunk JHB1 Johor Bahru
LocationJalan Johor Jaya, Johor Bahru, Malaysia
StatusOperational (Phase 1) / Expanding
CommissioningJuly 2024 (Phase 1 Go-Live)
Total IT Load150 MW+
Total Capacity~235,800 sq. ft. (Technical Data Hall Area)
Tier LevelTier III Standards
Project TypeHyperscale / AI-Ready Campus

City Profile

HeaderDetails
City NameJohor Bahru
Population~1.7 Million
Urban Agglomeration~2.5 Million (Iskandar Malaysia region)
City GDPRM 150 Billion (State of Johor)
Per Capita Income~RM 42,000
City TierTier 1 (Malaysia) / Global Secondary Hub
Key StrengthsProximity to Singapore, abundant land, favorable power costs

Companies Involved

HeaderDetails
Developer / Operator AirTrunk
Strategic Infrastructure Partner Tenaga Nasional Berhad (TNB)
Construction Contractor Local Tier-1 Contractors
MEP Engineering Proprietary AI-optimized liquid & air cooling systems
Network Connectivity Carrier-neutral; Multiple diverse fiber entry points
Power Infrastructure Dual 132kV high-voltage power feeds

Technical Specifications

HeaderDetails
Power Capacity150 MW Total Campus Capacity
UPS Redundancy2N Power Redundancy
Cooling System Direct-to-chip Liquid Cooling & Indirect Evaporative Cooling
Connectivity Low-latency cross-border link to Singapore
PUE Target 1.15 (Design PUE)
Energy Mix Renewable (VPPA 30MW) + Onsite Solar (1MW+)

Milestones

HeaderDetails
Announcement 2023
Construction Start 2023
Phase 1 Go-Live July 2024 (50MW initial capacity)
Full Buildout Expected 2027

Investment Details

HeaderDetails
Total InvestmentEstimated US$ 1 Billion+ (Phase 1 & Full Buildout)
Funding Private Equity (Macquarie Asset Management, PSP Investments)