Aligned Data Centers PHX3 Phoenix: 150MW Hyperscale & AI Campus
Status: Active Construction Phase | Location: Greater Phoenix Metropolitan Area (Union Hills / West Valley Corridor), Maricopa County, AZ, United States
Project Overview
Aligned Data Centers’ PHX-03 is a landmark 150 MW hyperscale data center campus strategically located within the rapidly expanding West Valley/Phoenix data center corridor, one of North America’s fastest-growing digital infrastructure markets. Building upon Aligned’s established presence in Maricopa County alongside its operational PHX-01 and PHX-02 facilities, PHX-03 is purpose-built to support hyperscale cloud providers, enterprise customers, and the rapidly increasing demands of artificial intelligence (AI), machine learning, and high-performance computing (HPC) workloads. Designed for large-scale cloud infrastructure and next-generation generative AI deployments, the campus incorporates Aligned’s patented Delta Cube (Delta³) cooling technology together with advanced direct liquid cooling (DLC) infrastructure, enabling exceptional thermal efficiency while significantly reducing water consumption in Arizona’s arid desert climate. This innovative cooling approach supports ultra-high-density GPU clusters and future AI hardware while improving operational sustainability and energy performance. The facility is powered by resilient high-voltage electrical infrastructure supplied by Arizona Public Service (APS) and Salt River Project (SRP), ensuring scalable and reliable energy delivery for mission-critical computing environments. As a carrier-neutral campus, PHX-03 offers access to major national dark-fibre routes, enabling low-latency connectivity, diverse network paths, and seamless interconnection with leading telecommunications providers and cloud platforms through direct cloud on-ramps. Combined with enterprise-grade security, resilient power architecture, scalable infrastructure, and sustainability-focused engineering, Aligned Data Centers’ PHX-03 provides a future-ready digital platform for organisations deploying hyperscale cloud services, AI training clusters, and next-generation data-intensive applications in one of the United States’ premier data center markets.
Quick Facts
| Field | Value |
| Project Name | Aligned Data Centers PHX3 Phoenix: 150MW Hyperscale & AI Campus |
| Location | Greater Phoenix Metropolitan Area (Union Hills / West Valley Corridor), Maricopa County, AZ, United States |
| Status | Active Construction Phase |
| Commissioning | Phase 1 Go-Live: 2026 (Phased multi-hall hyperscale delivery) |
| Total IT Load | 150 MW Critical IT Load Capacity |
| Total Capacity | 150 MW Critical IT Power across ~500,000+ sq ft footprint |
| Tier Level | Tier III Equivalent / Concurrent Maintainability (ISO 27001, SOC 1/2/3, PCI-DSS, NIST 800-53, HIPAA Certified Design) |
| Project Type | Purpose-Built Greenfield Hyperscale, Public Cloud & High-Density AI Factory Campus |
City Profile
| Header | Details |
| City Name | Phoenix |
| Population | approx 28,184$ |
| Urban Agglomeration | $approx 198,651$ |
| City GDP | $approx $10.91$ Billion USD |
| Per Capita Income | $48,362 USD. |
| City Tier | Secondary U.S. Data Center Market |
| Key Strengths | Vibrant Economy: |
Companies Involved
| Header | Details |
| Developer / Operator | Aligned Data Centers |
| Strategic Infrastructure Partner | Arizona Public Service (APS) / Salt River Project (SRP) & Arizona Commerce Authority |
| Construction Contractor | Specialized US Mission-Critical EPC & General Contractors |
| MEP Engineering | Aligned Global Infrastructure Engineering & High-Density Thermal Design Teams |
| Network Connectivity | Dual geodiverse underground dark fiber entry vaults; carrier-neutral platform with direct cross-connects to 20+ major telecom providers, low-latency DCI links to Phoenix hubs, and cloud direct connects (AWS, Azure, Google Cloud). |
| Power Infrastructure | Dual high-voltage grid utility substation feeds, static 2N / block-redundant uninterruptible power supply (UPS) topology, and N+1 emergency standby diesel generators with 48+ hours of on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | 150 MW Critical IT Power Capacity |
| UPS Redundancy | 2N / Block Redundant UPS Architecture |
| Cooling System | Patented Delta ${}^3$ cooling technology combined with DeltaFlow~${}^2$ direct-to-chip liquid cooling capability, supporting high-density AI nodes up to 100 kW+ per rack with zero or minimal water consumption. |
| Connectivity | Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), high-speed fiber cross-connects, and low-latency routes across the Western Interconnection. |
| PUE Target | < 1.15 Annualized Operational Design PUE |
| Energy Mix | High-reliability grid integration supplemented by Aligned's corporate sustainability initiatives and Arizona solar Power Purchase Agreements (PPAs). |
Milestones
| Header | Details |
| Announcement | 2023–2024 |
| Construction Start | 2024–2025 |
| Phase 1 Go-Live | 2026 |
| Full Buildout | 2026–2028+ (Phased delivery across technical whitespace modules) |
Investment Details
| Header | Details |
| Total Investment | Estimated $600,000,000 USD to $850,000,000 USD |
| Funding | Aligned Data Centers / Macquarie Asset Management corporate capital expenditure (CapEx) allocation |