Aligned Data Centers Project Caprock - 540MW Sustainable AI

Status: Under Construction / Groundbreaking   |   Location: near Abernathy, TX (Permian Basin area)


Project Overview

Project Caprock is a massive 540MW sustainable AI and hyperscale data center campus located in Hale County, Texas. This project represents one of the largest infrastructure investments in the West Texas region, strategically positioned to leverage the area's unique energy profile and vast land availability. The campus is designed specifically to solve the "power-density-water" trilemma that modern AI workloads face. Spanning 313 acres, the facility will eventually house six massive data center buildings totaling 1.65 million square feet. What sets Project Caprock apart is its "Waterless" sustainability mandate. Located in a region where water conservation is critical, Aligned is deploying its patented Delta³ cooling technology alongside advanced liquid-to-chip cooling systems. This ensures that the massive heat generated by AI GPU clusters is managed through a closed-loop system that consumes zero water from local aquifers. This environmental focus was a key factor in securing local permits and tax incentives, as it protects the agricultural interests of the surrounding South Plains. The project is expected to have a USD 5 billion economic impact on the region over the next decade. By choosing Abernathy, Aligned is tapping into the Waha gas hub and the ERCOT power grid's renewable energy surplus (wind and solar), providing hyperscalers with a path toward net-zero operations. As AI inference moves closer to energy-rich zones, Project Caprock serves as a blueprint for the future of "Energy-First" site selection in the global data center market.


Quick Facts

FieldValue
Project NameAligned Data Centers Project Caprock - 540MW Sustainable AI
Locationnear Abernathy, TX (Permian Basin area)
StatusUnder Construction / Groundbreaking
CommissioningGroundbroken April 11, 2026 (Phase 1 Go-Live Q1 2027)
Total IT Load540 MW
Total Capacity1.65 Million Sq. Ft. (Across 6 Buildings)
Tier LevelTier III Equivalent (High Availability AI Specs)
Project TypeHyperscale / AI-Optimized Campus

City Profile

HeaderDetails
City NameAbernathy
Population≈ 2,600 (2020 U.S. Census estimate)
Urban Agglomeration≈ 330,000+
City GDPNot independently estimated (small city economy)
Per Capita Income≈ $20,000 – $25,000
City TierTier 4 / Small Town
Key StrengthsStrategic location along key regional routes near Lubbock

Companies Involved

HeaderDetails
Developer / Operator Aligned Data Centers
Strategic Infrastructure Partner Hale County Economic Development Corporation
Construction Contractor HITT Contracting (Mission Critical Division)
MEP Engineering Black & Veatch
Network Connectivity Multiple long-haul fiber routes; Carrier Neutral
Power Infrastructure 540 MW total; Dedicated on-site substation

Technical Specifications

HeaderDetails
Power Capacity540 MW (Cumulative campus capacity)
UPS RedundancyFlexible N+1 or 2N (Delta Cube architecture)
Cooling System Closed-loop waterless cooling / Direct-to-chip liquid cooling
Connectivity Diverse fiber entry points with low latency to Dallas/Phoenix
PUE Target 1.15
Energy Mix 100% Renewable Energy credits (RECs) with on-site storage

Milestones

HeaderDetails
Announcement Q4 2025
Construction Start April 11, 2026
Phase 1 Go-Live Q1 2027 (Projected)
Full Buildout 2030 (Estimated completion)

Investment Details

HeaderDetails
Total InvestmentEstimated USD 5 Billion
Funding Private Equity (Macquarie Capital) and Debt Financing