Aligned Data Centers Project Caprock - 540MW Sustainable AI
Status: Under Construction / Groundbreaking | Location: near Abernathy, TX (Permian Basin area)
Project Overview
Project Caprock is a massive 540MW sustainable AI and hyperscale data center campus located in Hale County, Texas. This project represents one of the largest infrastructure investments in the West Texas region, strategically positioned to leverage the area's unique energy profile and vast land availability. The campus is designed specifically to solve the "power-density-water" trilemma that modern AI workloads face. Spanning 313 acres, the facility will eventually house six massive data center buildings totaling 1.65 million square feet. What sets Project Caprock apart is its "Waterless" sustainability mandate. Located in a region where water conservation is critical, Aligned is deploying its patented Delta³ cooling technology alongside advanced liquid-to-chip cooling systems. This ensures that the massive heat generated by AI GPU clusters is managed through a closed-loop system that consumes zero water from local aquifers. This environmental focus was a key factor in securing local permits and tax incentives, as it protects the agricultural interests of the surrounding South Plains. The project is expected to have a USD 5 billion economic impact on the region over the next decade. By choosing Abernathy, Aligned is tapping into the Waha gas hub and the ERCOT power grid's renewable energy surplus (wind and solar), providing hyperscalers with a path toward net-zero operations. As AI inference moves closer to energy-rich zones, Project Caprock serves as a blueprint for the future of "Energy-First" site selection in the global data center market.
Quick Facts
| Field | Value |
| Project Name | Aligned Data Centers Project Caprock - 540MW Sustainable AI |
| Location | near Abernathy, TX (Permian Basin area) |
| Status | Under Construction / Groundbreaking |
| Commissioning | Groundbroken April 11, 2026 (Phase 1 Go-Live Q1 2027) |
| Total IT Load | 540 MW |
| Total Capacity | 1.65 Million Sq. Ft. (Across 6 Buildings) |
| Tier Level | Tier III Equivalent (High Availability AI Specs) |
| Project Type | Hyperscale / AI-Optimized Campus |
City Profile
| Header | Details |
| City Name | Abernathy |
| Population | ≈ 2,600 (2020 U.S. Census estimate) |
| Urban Agglomeration | ≈ 330,000+ |
| City GDP | Not independently estimated (small city economy) |
| Per Capita Income | ≈ $20,000 – $25,000 |
| City Tier | Tier 4 / Small Town |
| Key Strengths | Strategic location along key regional routes near Lubbock |
Companies Involved
| Header | Details |
| Developer / Operator | Aligned Data Centers |
| Strategic Infrastructure Partner | Hale County Economic Development Corporation |
| Construction Contractor | HITT Contracting (Mission Critical Division) |
| MEP Engineering | Black & Veatch |
| Network Connectivity | Multiple long-haul fiber routes; Carrier Neutral |
| Power Infrastructure | 540 MW total; Dedicated on-site substation |
Technical Specifications
| Header | Details |
| Power Capacity | 540 MW (Cumulative campus capacity) |
| UPS Redundancy | Flexible N+1 or 2N (Delta Cube architecture) |
| Cooling System | Closed-loop waterless cooling / Direct-to-chip liquid cooling |
| Connectivity | Diverse fiber entry points with low latency to Dallas/Phoenix |
| PUE Target | 1.15 |
| Energy Mix | 100% Renewable Energy credits (RECs) with on-site storage |
Milestones
| Header | Details |
| Announcement | Q4 2025 |
| Construction Start | April 11, 2026 |
| Phase 1 Go-Live | Q1 2027 (Projected) |
| Full Buildout | 2030 (Estimated completion) |
Investment Details
| Header | Details |
| Total Investment | Estimated USD 5 Billion |
| Funding | Private Equity (Macquarie Capital) and Debt Financing |