Ansan Global Meta: Keppel's $659M 60MW Shovel-Ready AI Hub

Status: Active / Land Secured & Shovel-Ready Civil Engineering Pipeline (Tracking June 2026)   |   Location: 726-4 Wonsi-dong, Danwon-gu, Ansan, Banwol National Industrial Complex, Gyeonggi Province, South Korea


Project Overview

The Ansan Global Meta Data Centre is a high-profile, shovel-ready 60 MW digital infrastructure development located at 726-4 Wonsi-dong inside the Banwol National Industrial Complex in Ansan, South Korea. Formally announced on June 9, 2026, the project marks global asset manager Keppel's strategic entry into South Korea's high-growth digital infrastructure ecosystem. The acquisition was executed through its private vehicle, Keppel Data Centre Fund III (KDCF III), which secured a commanding 73% effective stake in the land-owning special purpose vehicle.  Advancing cleanly into early site mobilization and architectural foundation programming in mid-2026, the development bypasses severe market entry barriers. The Seoul Metropolitan Area currently faces an acute infrastructure deficit, with a historic vacancy rate of just 1.4% and an entire 2025–2027 development pipeline that is 100% pre-leased. By acquiring a site that already holds fully approved local construction permits and active power grid allocations, Keppel circumvents the localized 12-month utility backlogs. The facility is purpose-built to absorb burgeoning generative AI processing spikes, offering scalable hardware configurations roughly 40 kilometers southwest of central Seoul.


Quick Facts

FieldValue
Project NameAnsan Global Meta: Keppel's $659M 60MW Shovel-Ready AI Hub
Location726-4 Wonsi-dong, Danwon-gu, Ansan, Banwol National Industrial Complex, Gyeonggi Province, South Korea
StatusActive / Land Secured & Shovel-Ready Civil Engineering Pipeline (Tracking June 2026)
CommissioningCore structural handover and critical technical facility go-live targeted for 2030
Total IT Load~48.0 MW net critical operational compute capacity across initial deployments
Total Capacity60.0 Megawatts (60 MW) gross ultimate master-planned campus power footprint
Tier LevelTier III Equivalent (Concurrently maintainable infrastructure design specifications)
Project TypeGreenfield High-Density AI-Ready Hyperscale & Sovereign Cloud Facility

City Profile

HeaderDetails
City NameSeoul
Population~9.4 million (Seoul city proper)
Urban Agglomeration~26 million (Seoul Capital Area metropolitan region)
City GDP~US$400 billion
Per Capita Income~US$42,000–45,000
City TierTier 1 / Alpha Global City
Key StrengthsGlobal financial center, technology and innovation hub, headquarters of major conglomerates (Samsung, LG, Hyundai), advanced infrastructure, world-class public transportation, strong education and research institutions, vibrant culture and tourism sector

Companies Involved

HeaderDetails
Developer / Operator Keppel Data Centres
Strategic Infrastructure Partner Shinyoung Co. Ltd. (Local Asset & Joint Development Consortia)
Construction Contractor Hyundai Engineering & Construction (Hyundai E&C)
MEP Engineering Keppel Connectivity Division — Advanced Data Centre Technical Operations Group
Network Connectivity Carrier-neutral deployment incorporating physically isolated, concrete-hardened subterranean network corridors linked directly to Gasan and Gangnam telecom backbones
Power Infrastructure Korea Electric Power Corporation (KEPCO) Sub-Grid Grid Network (Fully secured, pre-approved dedicated high-voltage utility substation frameworks)

Technical Specifications

HeaderDetails
Power Capacity60 MW gross ultimate utility power envelope engineered to support hyper-dense server layouts and intensive training racks
UPS Redundancy$2N$ block-redundant static solid-state UPS topologies paired with quick-start industrial backup generator arrays with multi-day localized fuel storage
Cooling System AI-ready technical cooling architecture pre-engineered to support direct-to-chip liquid cooling loops alongside optimized industrial air handlers
Connectivity Minimum of 4 physically separate, subterranean dark fiber entries providing absolute route diversity and secure regional carrier loop transport
PUE Target $\le 1.25$ design-optimized annualized operating profile utilizing high-efficiency mechanical plant systems
Energy Mix Sustainability-focused layout incorporating smart energy management systems, fully aligned with Keppel’s net-zero carbon operations target by 2040

Milestones

HeaderDetails
Announcement 2026 - Q2
Construction Start 2026 - Q3
Phase 1 Go-Live 2030 - Q1
Full Buildout 2031 - Q2

Investment Details

HeaderDetails
Total InvestmentTracked at approximately KRW 1 Trillion (~$659 Million USD) total projected project capitalization for multi-stage civil construction and technical fit-out
Funding Funded through KDCF III institutional capital equity tranches (backed by its $2.1 Billion USD fund under management) alongside localized funding lines from NH Investment & Securities