GAK Sejong: NAVER's Gigawatt-Scale NVIDIA DSX AI Factory

Status: South Korea   |   Location: 824, Haengbok-daero, Sejong-si, South Korea


Project Overview

The NAVER GAK Sejong AI Expansion is a landmark digital infrastructure development transforming NAVER's existing hyperscale flagship into a massive, gigawatt-scale AI Factory. Formally announced on June 7, 2026, via a strategic alliance with NVIDIA, the project serves as the primary launchpad for South Korea’s sovereign artificial intelligence initiative. The expansion is custom-engineered to meet strict data localization and security mandates for domestic enterprise and government operations. Moving rapidly into hardware staging, specialized power distribution upgrades, and mechanical modifications in mid-2026, the project kicks off with an immediate 55 MW hardware expansion layer. Rather than operating as a general-purpose cloud center, the new wing is built entirely on the unified NVIDIA DSX full-stack reference architecture. This specialized layout combines high-density accelerated computing matrices, custom runtime layers, and advanced workload orchestration to minimize token creation costs. The facility will directly power NAVER’s upcoming real-time AI Agent Platform and the "Seoul World Model" a massive spatial digital twin utilizing urban street-view modeling and generative physics simulators.  


Quick Facts

FieldValue
Project NameGAK Sejong: NAVER's Gigawatt-Scale NVIDIA DSX AI Factory
Location824, Haengbok-daero, Sejong-si, South Korea
StatusSouth Korea
CommissioningPhase 1 initial 55 MW dedicated AI cluster staging targeted for late 2026 / early 2027
Total IT Load~270.0 MW net critical operational compute capacity across expanded campus footprint
Total Capacity1.00 Gigawatt (1,000 MW) gross ultimate master-planned AI Factory roadmap
Tier LevelTier IV Compliant (Fault-tolerant architectural design and power paths)
Project TypeBrownfield Campus Expansion, Gigawatt-Scale AI Factory & Sovereign Cloud Hub

City Profile

HeaderDetails
City NameSejong-si
Population~410,000 (2025 estimate)
Urban Agglomeration~430,000
City GDP~USD 18 billion (estimated)
Per Capita Income~USD 43,000–45,000
City TierTier 2 (South Korea)
Key StrengthsAdministrative capital of South Korea; concentration of government ministries and public institutions; planned smart city development; modern infrastructure; high quality of life; strong public-sector employment; innovation and sustainability initiatives

Companies Involved

HeaderDetails
Developer / Operator NAVER Corporation
Strategic Infrastructure Partner NVIDIA Corporation (Full-Stack Technology Blueprint & Silicon Alliance)
Construction Contractor Leading South Korean Tier-1 Prime Mission-Critical General Builders
MEP Engineering Joint NAVER Core Data Center Engineering Division & NVIDIA Advanced Systems Design Group
Network Connectivity Ultra-high-bandwidth, carrier-neutral private fiber fabrics deploying custom optical switches to seamlessly interconnect tens of thousands of processing units
Power Infrastructure Korea Electric Power Corporation (KEPCO) Regional Transmission Network (Enhanced high-voltage dedicated substation integrations)

Technical Specifications

HeaderDetails
Power CapacityInitial 55 MW rapid deployment block scaling into a long-term, multi-phase 1.0 GW gross utility power roadmap
UPS Redundancy$2(N+1)$ fault-tolerant solid-state UPS configurations optimized for heavy GPU transient surges and continuous cluster stabilization
Cooling System Next-generation direct-to-chip liquid cooling loops paired with GAK Sejong's existing NAMU (NAVER Air Membrane Unit) natural free-air handling units
Connectivity Minimum of 6 physically isolated, concrete-hardened network entry points providing absolute path routing diversity and ultra-low latency backbones
PUE Target $\le 1.15$ design-optimized annualized operating profile utilizing NVIDIA DSX MaxLPS software to maximize token throughput per megawatt
Energy Mix High-efficiency campus architectural integration utilizing localized solar arrays, thermal energy storage walls, and smart rainwater harvesting blocks

Milestones

HeaderDetails
Announcement 2026 - Q2
Construction Start 2026 - Q2
Phase 1 Go-Live 2027 - Q1
Full Buildout 2030 - Q4

Investment Details

HeaderDetails
Total InvestmentMulti-billion dollar long-term capital allocation with high-density GPU computing hardware accounting for the vast majority of infrastructure costs
Funding Direct corporate capital expenditures from NAVER Corporation, supported by structured strategic technology development funds