Empyrion KR1: 40MW Gangnam AI-Ready Carrier-Neutral Facility

Status: Active / Fully Operational & Live Production Staging (Tracking June 2026)   |   Location: 224 Yangjae-dong, Seocho-gu, Gangnam Area, Seoul, 137-130, South Korea


Project Overview

The Empyrion Digital KR1 Gangnam Data Centre is a state-of-the-art, high-density digital infrastructure asset situated at 224 Yangjae-dong within Seoul's premium Gangnam technology corridor. Representing Empyrion Digital’s flagship deployment in South Korea, this 40 MW facility is custom-engineered to overcome the extreme grid limitations and space scarcity that prevent hyperscale expansions inside Seoul's core business districts. Formally launched and processing live production workloads through mid-2026, the 9-story vertical structure supplies 30,714 square meters of premium colocation space built explicitly for high-performance computing (HPC) and graphic processing unit (GPU) clusters. Developed through a core connectivity partnership with Sejong Telecom, KR1 integrates a carrier-neutral ecosystem right at the heart of the metro network. This strategic positioning allows international cloud service providers, gaming platforms, and enterprise AI developers to scale high-density cabinets while securing direct, ultra-low latency access to local dark fiber backbones and regional internet exchanges.  


Quick Facts

FieldValue
Project NameEmpyrion KR1: 40MW Gangnam AI-Ready Carrier-Neutral Facility
Location224 Yangjae-dong, Seocho-gu, Gangnam Area, Seoul, 137-130, South Korea
StatusActive / Fully Operational & Live Production Staging (Tracking June 2026)
CommissioningReached Ready-for-Service (RFS) and officially launched operations in July 2025
Total IT Load~40.0 MW net critical operational compute capacity
Total Capacity40.0 Megawatts (40 MW) gross single-site urban grid envelope
Tier LevelTier III Compliant (Concurrently maintainable infrastructure blueprint)
Project TypeGreenfield Urban Core High-Density, AI-Ready & Carrier-Neutral Data Centre

City Profile

HeaderDetails
City NameSeoul
Population~9.4 million (Seoul city proper)
Urban Agglomeration~26 million (Seoul Capital Area metropolitan region)
City GDP~US$400 billion
Per Capita Income~US$42,000–45,000
City TierTier 1 / Alpha Global City
Key StrengthsGlobal financial center, technology and innovation hub, headquarters of major conglomerates (Samsung, LG, Hyundai), advanced infrastructure, world-class public transportation, strong education and research institutions, vibrant culture and tourism sector

Companies Involved

HeaderDetails
Developer / Operator Empyrion Digital
Strategic Infrastructure Partner Sejong Telecom (Core Network Hub & IP Transit Integration Partner)
Construction Contractor Leading Tier-1 South Korean Mission-Critical Civil Engineering Specialists
MEP Engineering Empyrion Digital Advanced Facilities Engineering & Thermal Management Division
Network Connectivity Highly dense carrier-neutral ecosystem deploying Sejong Telecom's primary network hub, offering native dark fiber paths, low-latency cross-connects, and diverse IP transit solutions
Power Infrastructure Korea Electric Power Corporation (KEPCO) Urban Sub-Grid (Dedicated on-site transformers and underground high-voltage infrastructure isolation)

Technical Specifications

HeaderDetails
Power Capacity40 MW gross ultimate IT capacity delivered via ultra-stable, high-amperage risers optimized for accelerated computing architectures
UPS Redundancy$N+1$ block-redundant static solid-state UPS configurations backed by industrial-grade rapid-start standby diesel generators
Cooling System Next-generation Statepoint Liquid Cooling System (SPLC) paired with integrated photovoltaic building walls to maximize water and energy efficiency
Connectivity Minimum of 4 concrete-hardened subterranean network vaults ensuring absolute fiber loop path diversity and route safety
PUE Target Highly optimized annualized operating efficiency profile minimizing technical overhead within a compact urban architectural footprint
Energy Mix Green building design utilizing on-site solar energy capture walls and closed-loop liquid-to-chip heat rejection layouts aligned with ISO 14001 benchmarks

Milestones

HeaderDetails
Announcement 2022 - Q3
Construction Start 2023 - Q2
Phase 1 Go-Live 2025 - Q3 (July 2025 Operational Launch)
Full Buildout 2026 - Q1

Investment Details

HeaderDetails
Total InvestmentMulti-hundred million dollar long-term asset deployment under Seraya Partners' regional digital infrastructure fund
Funding Direct institutional equity from Seraya Partners, structured green infrastructure credit lines, and local project finance syndications

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.