atNorth DEN01 Copenhagen AI Data Center Campus: 30MW Sustainable HPC Hub in Denmark

Status: Fully Operational / Active HPC & AI Deployment   |   Location: Tonsbakken 12, 2740 Skovlunde / Ballerup, Greater Copenhagen, Denmark


Project Overview

atNorth’s DEN01 Data Center Campus in Ballerup (Skovlunde), Greater Copenhagen, is a flagship sustainable digital infrastructure facility purpose-built to support high-performance computing (HPC), hyperscale cloud services, artificial intelligence (AI), machine learning (ML), and other compute-intensive enterprise workloads. Strategically located within the Greater Copenhagen metropolitan region, the campus delivers 30 MW of scalable IT power capacity, providing resilient infrastructure for cloud providers, research organizations, financial institutions, and enterprises requiring high-density computing environments. The facility is engineered with advanced Direct-to-Chip Liquid Cooling (DLC) technology, enabling rack power densities ranging from 40 kW to more than 100 kW per rack, making it ideally suited for next-generation GPU clusters, AI model training, scientific simulations, and high-performance analytics. Sustainability is at the core of DEN01’s design, with operations powered entirely by 100% renewable electricity, significantly reducing carbon emissions while supporting customers’ environmental objectives. A key differentiator of the campus is its innovative waste heat recovery system, which captures residual thermal energy generated by the data center and transfers it directly into the local municipal district heating network, providing sustainable heating for nearby residential communities and improving overall energy efficiency through circular energy reuse. The campus also features resilient power infrastructure, advanced cooling systems, and high-capacity fiber connectivity, enabling secure, low-latency access to major cloud platforms, internet exchanges, and enterprise networks across the Nordic region and Europe. Combining renewable energy, AI-ready cooling technology, sustainable heat reuse, and scalable hyperscale infrastructure, atNorth’s DEN01 Data Center Campus provides a future-ready platform supporting Europe’s accelerating demand for cloud computing, AI innovation, and digital transformation.


Quick Facts

FieldValue
Project NameatNorth DEN01 Copenhagen AI Data Center Campus: 30MW Sustainable HPC Hub in Denmark
LocationTonsbakken 12, 2740 Skovlunde / Ballerup, Greater Copenhagen, Denmark
StatusFully Operational / Active HPC & AI Deployment
CommissioningPhase 1 Go-Live: Late 2024 – Early 2025
Total IT Load30 MW Critical IT Power Allocation
Total Capacity30 MW Total IT Power Capacity across a 26,728 m² plot (~7,305 m² / 80,729 sq ft white space)
Tier LevelTier III Compliant Architecture / ISO 27001, ISO 14001 Certified Platform
Project TypePurpose-Built Hyperscale, High-Density AI/HPC Colocation & District Heat Reuse Hub

City Profile

HeaderDetails
City NameCopenhagen
Population~670,000
Urban Agglomeration~1.4 million (Greater Copenhagen)
City GDP~USD 170 billion (Greater Copenhagen economy)
Per Capita Income~USD 75,000
City TierTier 1 – Nordic Technology, Business & Digital Infrastructure Hub
Key StrengthsCapital and largest city of Denmark; major financial and technology center; strong life sciences, fintech, and clean technology sectors; advanced fiber connectivity; expanding hyperscale and colocation data center market; abundant renewable energy; highly skilled workforce; excellent international connectivity; gateway to the Nordic and Baltic regions; leading smart city and sustainability initiatives.

Companies Involved

HeaderDetails
Developer / Operator atNorth
Strategic Infrastructure Partner Local Municipal District Heating Network (Heat Reuse Partner) & Danish National Electricity Grid
Construction Contractor Specialized Nordic Mission-Critical EPC Contractors & Engineering Partners
MEP Engineering atNorth In-House Global Technical Infrastructure & HPC Engineering Teams
Network Connectivity Carrier-neutral platform with four diverse subterranean fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); ultra-low latency dark fiber links connecting directly to major European network hubs (FLAP) and Nordic subsea landing routes.
Power Infrastructure High-voltage utility grid incomers with N+1 power distribution, static distributed uninterruptible power supply (UPS) modules, automated switchgear, and standby diesel backup generators with minimum 48-hour on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity30 MW Total Secured Utility Power Capacity Allocation
UPS RedundancyN+1 Distributed Redundant Static UPS Architecture
Cooling System Hybrid climate cooling system featuring free-air cooling economizers, N+2 white space fan wall cooling, Direct-to-Chip Liquid Cooling (DLC) supporting 100+ kW GPU racks, and waste heat recovery district heating integration.
Connectivity Carrier-neutral access with direct low-latency cloud express on-ramps and cross-connect options across European networks (sub-5.5ms latency to Amsterdam, Frankfurt, and London).
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% Certified Carbon-Free Renewable Energy (Wind and Hydroelectric power) matched with local heat reuse efficiency.

Milestones

HeaderDetails
Announcement 2023
Construction Start Late 2023
Phase 1 Go-Live Late 2024 – Early 2025
Full Buildout Operational Active Campus

Investment Details

HeaderDetails
Total InvestmentEstimated €100,000,000 EUR to €150,000,000 EUR Campus Development
Funding Corporate Capital Expenditure & Infrastructure Equity Financing by atNorth / Partners Group