Project Overview
CapitaLand's Mumbai 01 is strategically located within the TTC Industrial Area at Digha Naka along the Airoli corridor, one of Navi Mumbai's most important industrial and technology hubs, offering excellent connectivity to Mumbai's commercial districts, telecom networks, and transportation infrastructure. Purpose-built to support the rapidly expanding requirements of hyperscalers, global cloud service providers, AI workloads, and large enterprises, the carrier-neutral facility benefits from Navi Mumbai's reliable power infrastructure and close proximity to more than 10 major subsea cable landing stations across the Mumbai metropolitan coastline, enabling high-speed domestic and international connectivity with low network latency and enhanced resilience. Designed as a next-generation digital infrastructure campus, Mumbai 01 features high structural floor loading capacity, scalable multi-story architecture, flexible data hall layouts, and infrastructure capable of supporting high-density computing environments required for artificial intelligence, machine learning, and cloud applications. The facility also integrates advanced cooling technologies, energy-efficient power systems, and sustainable operational practices to improve overall efficiency while reducing environmental impact. Combined with robust physical security, redundant power and cooling systems, and carrier-neutral connectivity, CapitaLand's Mumbai 01 serves as a critical digital gateway that enables organizations to scale mission-critical workloads efficiently while delivering high availability, operational resilience, and seamless connectivity for domestic and international digital ecosystems.
Quick Facts
| Field | Value |
| Project Name | CapitaLand Data Centre Mumbai 01 108MW Hyperscale Campus, Airoli-Dighe, Navi Mumbai |
| Location | Plot No 14/2, 15, 37, TTC Industrial Area, MIDC Digha Naka Dighe, Airoli, Thane, Maharashtra 400708 |
| Status | Under Construction / Phase-wise Commissioning |
| Commissioning | Phase 1 technical fit-outs and initial operational deployment active; subsequent multi-building block scaling moving through late 2026 and 2027. |
| Total IT Load | ~108.0 MW (Total campus critical IT power capacity) |
| Total Capacity | Comprising 2 dedicated data center buildings housing 24 data halls; engineered for IT power allocations between 2.5 MW and 2.7 MW per individual hall. |
| Tier Level | Comprising 2 dedicated data center buildings housing 24 data halls; engineered for IT power allocations between 2.5 MW and 2.7 MW per individual hall. |
| Project Type | Greenfield Hyperscale, Cloud, and Large-Scale Enterprise Colocation Campus |
City Profile
| Header | Details |
| City Name | Navi Mumbai |
| Population | ~1.12 million |
| Urban Agglomeration | 22+ million (Mumbai Metropolitan Region) |
| City GDP | Part of the Mumbai Metropolitan Region economy, one of India's largest economic centers |
| Per Capita Income | Approximately ₹350,000–₹450,000 per year |
| City Tier | Tier 1 |
| Key Strengths | Planned urban infrastructure, IT parks, business hubs, JNPT port connectivity, excellent transportation network, educational institutions, growing data center ecosystem |
Companies Involved
| Header | Details |
| Developer / Operator | CapitaLand |
| Strategic Infrastructure Partner | Local Maharashtra state electrical utilities (MSEDCL/MSETCL) for high-voltage infrastructure backbone along with major domestic telecom fiber providers. |
| Construction Contractor | Leading Tier-1 Indian civil infrastructure and engineering contracting firms. |
| MEP Engineering | Internationally certified engineering consultancies managing complex critical power, high-voltage substations, and thermal systems. |
| Network Connectivity | Highly diverse carrier-neutral layout equipped with 4 physically separate fiber entry paths and routes, dedicated dual data shafts, and multiple Meet-Me-Rooms (MMRs) per server floor. |
| Power Infrastructure | Robust on-premise dedicated 220 kV Gas Insulated Substation (GIS); dual power distribution feeds routing to racks; supported by an N+N redundant UPS design for IT load providing an 8-minute End-of-Life (EOL) battery backup at full load; backup power provided via an N+1 generator configuration with up to 48 hours of continuous on-site fuel storage. |
Technical Specifications
| Header | Details |
| Power Capacity | Highly scalable power delivery options capable of transitioning effortlessly from standard enterprise rack loads to ultra-dense high-performance computing setups. |
| UPS Redundancy | N+N redundant configuration ensuring complete mechanical and electrical path isolation right down to the individual server rack PDU. |
| Cooling System | Outfitted with N+4 redundant air-cooled chillers coupled with water economization, alongside N+2 redundant CRAC units per data hall; features a dedicated UPS system for chiller pumps and CRACs ensuring 7 minutes of thermal ride-through protection; built ready to accommodate advanced liquid cooling and rear-door heat exchangers (RDHx). |
| Connectivity | 2 separate MMRs per data center floor feeding into high-count carrier fiber rings for seamless peering and direct cloud edge deployments. |
| PUE Target | Highly optimized Power Usage Effectiveness target optimized via intelligent infrastructure monitoring software and smart thermal containment. |
| Energy Mix | Strongly driven by green building criteria aiming for LEED Gold Certification; incorporates high-efficiency chillers, real-time energy management tools, and rooftop solar panel arrays. |
Milestones
| Header | Details |
| Announcement | 2025 |
| Construction Start | 2026 |
| Phase 1 Go-Live | Mid-to-Late 2026 Phase Verification |
| Full Buildout | 2027 |
Investment Details
| Header | Details |
| Total Investment | Part of CapitaLand’s substantial capital expenditure program targeted at constructing a multi-city, future-ready 244 MW digital infrastructure platform across India. |
| Funding | Sponsored and funded through institutional equity lines from CapitaLand India Trust along with structured global infrastructure fund allocations. |