CloudHQ Lisses CDG Data Center Campus Paris France Specs

Status: Operational / Multi-Phase Expansion   |   Location: Rue Léonard de Vinci, 91090 Lisses, Île-de-France, France


Project Overview

The CloudHQ Lisses Data Center Campus, also known as the CDG Campus, is a major hyperscale development located in Lisses, south of Paris, France, representing an investment of more than €1 billion in next-generation digital infrastructure. The campus is designed around two twin data center buildings, CDG1 and CDG2, each providing approximately 74.4 MW of critical IT capacity, bringing the total planned capacity to around 148.8 MW. This substantial power footprint positions the development to support highly demanding workloads, including hyperscale cloud platforms, artificial intelligence foundation model training, high-performance computing, and large-scale enterprise applications. Its location within the wider Paris industrial corridor provides strategic access to the French capital’s major connectivity ecosystem, enterprise market, and regional network infrastructure while offering sufficient space for large-scale data center operations. A dedicated on-site 225 kV high-voltage utility substation is a key component of the campus infrastructure, providing the substantial electrical capacity required to operate high-density computing environments and support future scalability. The development also incorporates advanced closed-loop liquid cooling technology, an increasingly important infrastructure approach for AI and high-performance computing systems where conventional air cooling may not be sufficient for rising rack densities. By circulating cooling fluid through a closed system, the technology is designed to efficiently manage heat generated by high-performance computing equipment while reducing reliance on traditional cooling methods. With nearly 150 MW of planned critical IT capacity, dedicated high-voltage power infrastructure, advanced liquid cooling, and a strategic position near Paris, the CloudHQ Lisses Data Center Campus is positioned as a significant hyperscale platform for the next generation of cloud, AI, and enterprise computing requirements in France.


Quick Facts

FieldValue
Project NameCloudHQ Lisses CDG Data Center Campus Paris France Specs
LocationRue Léonard de Vinci, 91090 Lisses, Île-de-France, France
StatusOperational / Multi-Phase Expansion
CommissioningJune 2025 (CDG1 Phase 1 Energization) – Phased Rollout
Total IT Load148.8 MW Critical IT Power Capacity (74.4 MW per building across CDG1 and CDG2)
Total Capacity~929,808 sq ft (~86,382 m²) gross building area across two dedicated hyperscale facilities
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant Hyperscale Standards
Project TypePurpose-Built Master-Planned Hyperscale & AI Cloud Data Center Campus

City Profile

HeaderDetails
City NameLisses
Population~8,000
Urban Agglomeration~200,000+ (wider Évry-Courcouronnes urban area)
City GDPNot separately reported; part of the economically significant Grand Paris Sud area
Per Capita IncomeNot separately reported at city level
City TierTier 3 – Suburban Industrial & Logistics City
Key StrengthsProximity to Paris; access to the A6 motorway; strong logistics infrastructure; industrial and commercial zones; access to the Paris metropolitan labor market; proximity to Évry-Courcouronnes; and established telecommunications and transportation networks.

Companies Involved

HeaderDetails
Developer / Operator CloudHQ
Strategic Infrastructure Partner RTE (Réseau de Transport d'Électricité), City of Lisses, Éssonne Departmental Council
Construction Contractor Mission-Critical European General Contractors & Specialized Hyperscale EPCs
MEP Engineering CloudHQ Global Mission-Critical Infrastructure & Thermal Engineering Teams
Network Connectivity Carrier-neutral facility with dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and dedicated diverse fiber ducting connecting directly to major Paris carrier hubs (Interxion/Digital Realty, EQUINIX) and European internet exchanges (PARIX/France-IX).
Power Infrastructure Direct connection to the 225 kV transmission grid via an on-site dedicated utility substation, concurrently maintainable static 2N / N+1 uninterruptible power supply (UPS) systems, automated transfer switchgear (ATS), and N+1 emergency backup generators with on-site bulk fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity~180+ MVA Dedicated Substation Grid Service Allocation
UPS RedundancyConcurrently Maintainable 2N / N+1 Static UPS Architecture
Cooling System Direct-to-chip liquid cooling (DLC) readiness for high-density AI clusters, high-efficiency closed-loop dry coolers, CRAH/CRAC units configured with air-side economization to eliminate water consumption during normal operations.
Connectivity Sub-millisecond optical dark fiber links connecting Lisses directly to core Paris cloud availability zones and Western European transport backbones.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% Certified Renewable Energy Procurement backed by long-term European Power Purchase Agreements (PPAs).

Milestones

HeaderDetails
Announcement November 2021
Construction Start November 2022
Phase 1 Go-Live June 2025 (CDG1 Operational)
Full Buildout Multi-Phase 148.8 MW Master Campus Rollout (CDG1 & CDG2)

Investment Details

HeaderDetails
Total Investment~€1,000,000,000+ EUR (~$1.1 Billion USD Capital Expenditure)
Funding Corporate Capital Expenditure (CloudHQ LLC)