Project Overview
The VAN3 facility’s latest expansion underscores Vancouver’s emergence as a critical crossroads between North America and Asia-Pacific networks. By enhancing its interconnection density and upgrading meet-me-room capacity, Cologix has positioned VAN3 to handle significantly higher volumes of latency-sensitive traffic, particularly from AI inference platforms, financial trading systems, and real-time content delivery networks. The integration of additional cloud onramps, including expanded AWS Direct Connect and Google Cloud Interconnect access, enables enterprises to build hybrid and multi-cloud architectures with minimal latency and greater redundancy.
A key highlight of the modernization phase is the investment in seismic resiliency, a crucial requirement given Vancouver’s location in Seismic Zone 4. Structural reinforcements, coupled with modular power infrastructure, ensure operational continuity even under extreme conditions. At the same time, VAN3 maintains strong sustainability credentials, leveraging British Columbia’s predominantly hydroelectric power grid to achieve a low PUE target of 1.30 while keeping carbon emissions minimal.
As data sovereignty, edge computing, and AI-driven workloads continue to reshape infrastructure demand, VAN3 is well-positioned to serve as a scalable, future-ready hub for enterprises and carriers seeking reliable, high-performance connectivity in the Pacific Northwest.
Quick Facts
| Field | Value |
| Project Name | Cologix VAN3 Vancouver |
| Location | 2828 Natal Street, Vancouver |
| Status | Operational (Recent AI-Expansion Phase) |
| Commissioning | Initial: Sept 2019; Upgrade Phase: Feb 2024 |
| Total IT Load | 5 MW |
| Total Capacity | 5.5 MW |
| Tier Level | Tier III (Constructed Facility) |
| Project Type | Network-Neutral Interconnection / Edge |
City Profile
| Header | Details |
| City Name | vancouver |
| Population | ~675,000 |
| Urban Agglomeration | ~2.7 million |
| City GDP | ~$165 billion USD (Metro Vancouver region estimate) |
| Per Capita Income | ~$55,000 USD (approx., Metro Vancouver) |
| City Tier | Alpha (Global City – strong regional and international economic influence) |
| Key Strengths | Major Pacific trade gateway (Port of Vancouver) |
Companies Involved
| Header | Details |
| Developer / Operator | Cologix |
| Strategic Infrastructure Partner | Mubadala Investment Company |
| Construction Contractor | Whelan Construction |
| MEP Engineering | Affiliated Engineers / Deerns |
| Network Connectivity | Ziply Fiber, Zayo, Telus, Shaw |
| Power Infrastructure | BC Hydro |
Technical Specifications
| Header | Details |
| Power Capacity | 5 MW IT Load |
| UPS Redundancy | N+1 Distributed Redundant |
| Cooling System | Hot Aisle Containment / DX & Chilled Water |
| Connectivity | Direct link to 555 W Hastings (Carrier Hotel) |
| PUE Target | 1.30 |
| Energy Mix | 98% Renewable (Hydroelectric-dominant) |
Milestones
| Header | Details |
| Announcement | Q1 2018 |
| Construction Start | Q3 2018 |
| Phase 1 Go-Live | September 2019 |
| Full Buildout | April 2026 (Modernization Completed) |
Investment Details
| Header | Details |
| Total Investment | $150 Million (Cumulative Site Value) |
| Funding | Private Equity (Mubadala / Stonepeak) |