Compass Datacenters Atlanta Data Center Campus: 70MW Sustainable Hub

Status: Active Development / Phased Campus Buildout   |   Location: Greater Atlanta Digital Infrastructure Corridor, Georgia, USA


Project Overview

Compass Datacenters' Atlanta Campus is a sustainable, AI-ready digital infrastructure development strategically located to support the rapidly expanding Greater Atlanta data center market, one of the fastest-growing hyperscale regions in the United States. Designed using Compass Datacenters' industrialized, prefabricated modular construction platform, the campus enables rapid deployment, consistent build quality, and scalable expansion to meet increasing demand from hyperscale cloud providers, enterprise customers, and AI-driven applications. The campus is engineered to accommodate high-density computing environments required for artificial intelligence (AI), machine learning (ML), high-performance computing (HPC), and next-generation cloud workloads while maintaining exceptional operational efficiency and reliability. A defining feature of the development is Compass's proprietary indirect air cooling technology, which delivers efficient thermal management without consuming water during normal operations, significantly reducing environmental impact and supporting long-term sustainability goals. The facility is powered by reliable electricity supplied through Georgia Power's grid infrastructure, ensuring resilient energy delivery for mission-critical operations. Additionally, the campus benefits from low-latency connectivity through access to major Atlanta fiber routes, regional cloud on-ramps, and carrier-rich network interconnection hubs, enabling seamless connectivity to leading public cloud platforms and enterprise networks. Combining modular scalability, energy-efficient design, water-free cooling technology, and strategic network connectivity, Compass Datacenters' Atlanta Campus provides a future-ready platform capable of supporting the growing demands of digital transformation, cloud computing, and AI infrastructure across the southeastern United States.


Quick Facts

FieldValue
Project NameCompass Datacenters Atlanta Data Center Campus: 70MW Sustainable Hub
LocationGreater Atlanta Digital Infrastructure Corridor, Georgia, USA
StatusActive Development / Phased Campus Buildout
CommissioningPhased Rollout & Ongoing Construction (2025–2027+)
Total IT Load~50 MW – 70 MW Critical IT Power Capacity
Total Capacity~70 MW Total Utility Power Allocation
Tier LevelTier III Certified Architecture / ISO 27001, SOC 2 Type II, LEED Certified Platform
Project TypePurpose-Built Hyperscale, Waterless-Cooled & AI-Ready Data Center Campus

City Profile

HeaderDetails
City NameAtlanta
Population~510,000 (city proper, 2024 estimate)
Urban Agglomeration~6.3 million (Atlanta metropolitan area)
City GDP~$515 billion (Atlanta metro GDP)
Per Capita Income~$43,000 (city proper, approximate)
City TierAlpha− (Global city classification; major economic hub in the U.S.)
Key StrengthsMajor transportation hub (home to Hartsfield–Jackson Atlanta International Airport, one of the busiest in the world)

Companies Involved

HeaderDetails
Developer / Operator Compass Datacenters
Strategic Infrastructure Partner Georgia Power (Electric Utility) & Southern Company Transmission
Construction Contractor Specialized US Mission-Critical EPC Contractors & Off-Site Modular Prefabrication Partners
MEP Engineering Compass Datacenters In-House Global Technical & Thermal Engineering Teams
Network Connectivity Carrier-neutral host with dual redundant underground fiber entrance vaults; multi-tenant Meet-Me-Rooms (MMRs); direct low-latency backhaul routes to 56 Marietta (Atlanta’s primary carrier hotel) and regional fiber rings.
Power Infrastructure Dual high-voltage grid incomers, distributed static 2N / N+1 uninterruptible power supply (UPS) systems, automated switchgear, and standby diesel backup generator arrays with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity~70 MW Total Utility Supply Allocation
UPS Redundancy2N / N+1 Static Uninterruptible Power Supply (UPS) Configuration
Cooling System Closed-loop indirect air cooling system operating with zero water consumption, Direct-to-Chip Liquid Cooling (DLC) readiness for high-density GPU racks, and automated BMS environmental controls.
Connectivity Carrier-neutral access with direct low-latency cloud express on-ramps and cross-connect options across North American networks.
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix High-percentage clean renewable energy matching (backed by Georgia Power clean energy mix).

Milestones

HeaderDetails
Announcement Regional Hyperscale Expansion Phase
Construction Start Active Buildout
Phase 1 Go-Live Target 2026
Full Buildout Phased Multi-Building Rollout

Investment Details

HeaderDetails
Total InvestmentEstimated $350,000,000 USD to $500,000,000 USD
Funding Corporate Capital Expenditure & Infrastructure Financing by Compass Datacenters / Brookfield Infrastructure Partners, Ontario Teachers' Pension Plan, & KKR

Stay Ahead in the Data Center World