CtrlS Chandan Valley Campus
Status: Under Construction (Phase 1 Development) | Location: Chandan Valley Industrial Park, near Hyderabad, Telangana, India
Project Overview
The CtrlS Chandan Valley Campus is positioned to be one of India's foremost hyperscale data center hubs, strategically located near the dynamic IT and business capital of Hyderabad. This monumental project underscores the rapid acceleration of India's digital infrastructure buildout, driven by unprecedented growth in cloud adoption, digital services, and the emerging demands of Artificial Intelligence (AI) workloads. The campus, being developed by CtrlS Datacenters, will span a significant 40 acres and is designed for a massive total IT capacity of over 612 MW upon full buildout.
The facility is being engineered to meet the highest global standards, targeting a Rated-4 (Tier IV equivalent) design, which mandates continuous operation with maximum fault tolerance and redundancy in its critical systems. This high level of resilience is crucial for supporting mission-critical enterprise and hyperscale cloud operations. A key feature is the establishment of a dedicated Gas Insulated Substation (GIS) with an expandable capacity reaching up to an enormous 900 MW, securing the necessary power for this energy-intensive campus.
Recognizing the shift toward high-density computing driven by AI and machine learning, the campus incorporates next-generation cooling technologies. This includes provisions for advanced thermal management strategies such as Direct Liquid Cooling (DLC) and even Immersion Cooling, alongside energy-efficient methods like Free Air-Cooling and the use of solar module facades. Construction commenced in September 2025, with the first phase anticipated to be operational by early 2027-2028. Strategically located within the Tier I city ecosystem of Hyderabad, the campus leverages the city's robust network connectivity and its status as a leading technology and economic center, ensuring the delivery of high-availability, low-latency, and future-ready digital infrastructure.
Quick Facts
| Field | Value |
| Project Name | CtrlS Chandan Valley Campus |
| Location | Chandan Valley Industrial Park, near Hyderabad, Telangana, India |
| Status | Under Construction (Phase 1 Development) |
| Commissioning | Phase 1 anticipated by Q1 2027/28 |
| Total IT Load | 612 MW |
| Total Capacity | 6 Data Center Buildings, 5,101 racks (Phase 1 - 250 MW sanctioned power) |
| Tier Level | Rated-4 ( |
| Project Type | Hyperscale Data Center Campus / Green Energy Hub |
City Profile
| Header | Details |
| City Name | Hyderabad |
| Population | 10 million |
| Urban Agglomeration | 10.8 M |
| City GDP | $75 billion |
| Per Capita Income | ₹4.94 lakh |
| City Tier | Tier I |
| Key Strengths | IT/ITES, Pharmaceuticals, Biotech, Connectivity, Favorable Government Policy |
Companies Involved
| Header | Details |
| Developer / Operator | CtrlS Datacenters |
| Strategic Infrastructure Partner | N/A (Self-developed, focus on GIS and renewable power integration) |
| Construction Contractor | N/A (Self-developed, focus on GIS and renewable power integration) Construction Contractor N/A (Details not specified publicly) |
| MEP Engineering | N/A (Details not specified publicly) |
| Network Connectivity | High-density, interconnected data centers planned |
| Power Infrastructure | Dedicated Gas Insulated Substation (GIS) up to 900 MW expandable capacity |
Technical Specifications
| Header | Details |
| Power Capacity | 900 MW (Total GIS Capacity - expandable) |
| UPS Redundancy | N+N or 2N |
| Cooling System | Advanced technologies: Solar Module Facades, Free Air-Cooling, Direct Liquid Cooling, and Immersion Cooling support |
| Connectivity | Carrier-Neutral (Implied), High-Density Interconnects |
| PUE Target | N/A (Likely sub-1.4, given advanced cooling) |
| Energy Mix | Significantly reliant on Green Energy and Renewable Power |
Milestones
| Header | Details |
| Announcement | January 2025 |
| Construction Start | September 2025 |
| Phase 1 Go-Live | Q1 2027/28 (Anticipated) |
| Full Buildout | Phased development over several years |
Investment Details
| Header | Details |
| Total Investment | N/A |
| Funding | N/A (Internal funding/strategic debt) |