WBS Power/Prime Capital Hyperscale Campus (Co-located with Project Jupiter)
Status: Pre-Construction/Planning (Targeting 2026/2027 Start) | Location: Former military airfield, Brandenburg, Germany
Project Overview
This upcoming hyperscale data center project in Brandenburg, Germany, represents a significant shift toward deeply integrated, sustainable digital infrastructure in Europe. Developed through a joint venture between renewable energy specialist WBS Power and Prime Capital, the campus is planned for a colossal 500 MW of IT load. Its strategic location at a former military airfield was chosen specifically for its existing access to a crucial 380kV high-voltage power line, a feature that has become a critical bottleneck for data center growth in the constrained FLAP-D (Frankfurt, London, Amsterdam, Paris, Dublin) markets.
What makes this project truly unique is its direct co-location with Project Jupiter, a massive renewable energy scheme. This includes up to 150 MW of solar power and a colossal 500 MW / 2,000 MWh Battery Energy Storage System (BESS), one of the largest co-located BESS installations in Germany. By integrating the data center with this major renewable energy and storage hub, the developers aim to ensure the facility is powered by a high percentage of clean, carbon-free energy, directly supporting Europe's ambitious climate goals and upcoming EU Data Centre Energy Efficiency Package requirements.
The development is a direct response to the massive demand from global hyperscalers and AI labs, which are increasingly seeking locations that can provide reliable, large-scale, and, most importantly, green power capacity outside of the traditional, grid-strained urban hubs. While the project is currently in the pre-construction phase, with the BESS and solar components slated to begin construction in late 2026 or early 2027, its successful implementation will set a new standard for sustainable, utility-scale digital infrastructure development across the continent, reinforcing Germany's position as a key player in the European data center landscape
Quick Facts
| Field | Value |
| Project Name | WBS Power/Prime Capital Hyperscale Campus (Co-located with Project Jupiter) |
| Location | Former military airfield, Brandenburg, Germany |
| Status | Pre-Construction/Planning (Targeting 2026/2027 Start) |
| Commissioning | TBD (Follows Project Jupiter construction timeline) |
| Total IT Load | 500 MW |
| Total Capacity | N/A (Focus on power capacity for now) |
| Tier Level | N/A |
| Project Type | Hyperscale Campus / Renewable Energy Integration Hub |
City Profile
| Header | Details |
| City Name | Brandenburg |
| Population | 73,939 as of late 2023 |
| Urban Agglomeration | 4.7 million |
| City GDP | €97.54 billion |
| Per Capita Income | €37,774 |
| City Tier | Tier II |
| Key Strengths | Proximity to Berlin, Large available land, Favorable grid access, Strong focus on green energy transition |
Companies Involved
| Header | Details |
| Developer / Operator | WBS Power (Joint Venture with Prime Capital) |
| Strategic Infrastructure Partner | Prime Capital (Acting for Prime Green Energy Infrastructure Fund II) |
| Construction Contractor | N/A |
| MEP Engineering | N/A (Details not specified publicly) |
| Network Connectivity | N/A (High-speed fiber connectivity implied) |
| Power Infrastructure | Shared 380kV High-Voltage Grid Connection with co-located BESS/Solar |
Technical Specifications
| Header | Details |
| Power Capacity | 500 MW |
| UPS Redundancy | (Implied high-level redundancy for a 500MW hyperscale facility) |
| Cooling System | advanced cooling to meet EU efficiency targets |
| Connectivity | N/A |
| PUE Target | N/A |
| Energy Mix | 100% Green Energy Target |
Milestones
| Header | Details |
| Announcement | Recent (Late 2025) |
| Construction Start | Late 2026 or Early 2027 |
| Phase 1 Go-Live | TBD |
| Full Buildout | Phased development |
Investment Details
| Header | Details |
| Total Investment | 500 $ million |
| Funding | Prime Green Energy Infrastructure Fund II |