Status: Pre-Construction/Planning (Targeting 2026/2027 Start) | Location: Former military airfield, Brandenburg, Germany
This upcoming hyperscale data center project in Brandenburg, Germany, represents a significant shift toward deeply integrated, sustainable digital infrastructure in Europe. Developed through a joint venture between renewable energy specialist WBS Power and Prime Capital, the campus is planned for a colossal 500 MW of IT load. Its strategic location at a former military airfield was chosen specifically for its existing access to a crucial 380kV high-voltage power line, a feature that has become a critical bottleneck for data center growth in the constrained FLAP-D (Frankfurt, London, Amsterdam, Paris, Dublin) markets.
What makes this project truly unique is its direct co-location with Project Jupiter, a massive renewable energy scheme. This includes up to 150 MW of solar power and a colossal 500 MW / 2,000 MWh Battery Energy Storage System (BESS), one of the largest co-located BESS installations in Germany. By integrating the data center with this major renewable energy and storage hub, the developers aim to ensure the facility is powered by a high percentage of clean, carbon-free energy, directly supporting Europe's ambitious climate goals and upcoming EU Data Centre Energy Efficiency Package requirements.
The development is a direct response to the massive demand from global hyperscalers and AI labs, which are increasingly seeking locations that can provide reliable, large-scale, and, most importantly, green power capacity outside of the traditional, grid-strained urban hubs. While the project is currently in the pre-construction phase, with the BESS and solar components slated to begin construction in late 2026 or early 2027, its successful implementation will set a new standard for sustainable, utility-scale digital infrastructure development across the continent, reinforcing Germany's position as a key player in the European data center landscape
| Field | Value |
|---|---|
| Project Name | WBS Power / Prime Capital Hyperscale Campus | Co-Located Project Jupiter AI Hub |
| Location | Former military airfield, Brandenburg, Germany |
| Status | Pre-Construction/Planning (Targeting 2026/2027 Start) |
| Project Type | Hyperscale Campus / Renewable Energy Integration Hub |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Brandenburg |
| Population | 73,939 as of late 2023 |
| Urban Agglomeration | 4.7 million |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.