WBS Power/Prime Capital Hyperscale Campus (Co-located with Project Jupiter)

Status: Pre-Construction/Planning (Targeting 2026/2027 Start)   |   Location: Former military airfield, Brandenburg, Germany


Project Overview

This upcoming hyperscale data center project in Brandenburg, Germany, represents a significant shift toward deeply integrated, sustainable digital infrastructure in Europe. Developed through a joint venture between renewable energy specialist WBS Power and Prime Capital, the campus is planned for a colossal 500 MW of IT load. Its strategic location at a former military airfield was chosen specifically for its existing access to a crucial 380kV high-voltage power line, a feature that has become a critical bottleneck for data center growth in the constrained FLAP-D (Frankfurt, London, Amsterdam, Paris, Dublin) markets.

What makes this project truly unique is its direct co-location with Project Jupiter, a massive renewable energy scheme. This includes up to 150 MW of solar power and a colossal 500 MW / 2,000 MWh Battery Energy Storage System (BESS), one of the largest co-located BESS installations in Germany. By integrating the data center with this major renewable energy and storage hub, the developers aim to ensure the facility is powered by a high percentage of clean, carbon-free energy, directly supporting Europe's ambitious climate goals and upcoming EU Data Centre Energy Efficiency Package requirements.

The development is a direct response to the massive demand from global hyperscalers and AI labs, which are increasingly seeking locations that can provide reliable, large-scale, and, most importantly, green power capacity outside of the traditional, grid-strained urban hubs. While the project is currently in the pre-construction phase, with the BESS and solar components slated to begin construction in late 2026 or early 2027, its successful implementation will set a new standard for sustainable, utility-scale digital infrastructure development across the continent, reinforcing Germany's position as a key player in the European data center landscape


Quick Facts

FieldValue
Project NameWBS Power/Prime Capital Hyperscale Campus (Co-located with Project Jupiter)
LocationFormer military airfield, Brandenburg, Germany
StatusPre-Construction/Planning (Targeting 2026/2027 Start)
CommissioningTBD (Follows Project Jupiter construction timeline)
Total IT Load500 MW
Total CapacityN/A (Focus on power capacity for now)
Tier LevelN/A
Project TypeHyperscale Campus / Renewable Energy Integration Hub

City Profile

HeaderDetails
City NameBrandenburg
Population73,939 as of late 2023
Urban Agglomeration4.7 million
City GDP€97.54 billion
Per Capita Income€37,774
City TierTier II
Key StrengthsProximity to Berlin, Large available land, Favorable grid access, Strong focus on green energy transition

Companies Involved

HeaderDetails
Developer / Operator WBS Power (Joint Venture with Prime Capital)
Strategic Infrastructure Partner Prime Capital (Acting for Prime Green Energy Infrastructure Fund II)
Construction Contractor N/A
MEP Engineering N/A (Details not specified publicly)
Network Connectivity N/A (High-speed fiber connectivity implied)
Power Infrastructure Shared 380kV High-Voltage Grid Connection with co-located BESS/Solar

Technical Specifications

HeaderDetails
Power Capacity500 MW
UPS Redundancy(Implied high-level redundancy for a 500MW hyperscale facility)
Cooling System advanced cooling to meet EU efficiency targets
Connectivity N/A
PUE Target N/A
Energy Mix 100% Green Energy Target

Milestones

HeaderDetails
Announcement Recent (Late 2025)
Construction Start Late 2026 or Early 2027
Phase 1 Go-Live TBD
Full Buildout Phased development

Investment Details

HeaderDetails
Total Investment500 $ million
Funding Prime Green Energy Infrastructure Fund II

Stay Ahead in the Data Center World