CtrlS Kolkata: 60MW AI-Ready Data Center Hub in New Town

Status: Active / Phase 1 Live & Phase 2 Under Construction (Tracking June 2026)   |   Location: JF77+M28, Action Area IIE, Reckjoani, New Town, West Bengal 700161


Project Overview

The CtrlS Kolkata Data Center Campus, designated as the KOL-1 Facility, is a landmark digital infrastructure asset strategically positioned within Eastern India's premier technology enclave, the Bengal Silicon Valley IT Hub in New Town. Functioning as a critical gateway for regional data sovereignty and international fiber transit, this 60 MW campus represents a massive geographic milestone for CtrlS. It is specifically custom-built from the ground up to support high-performance cloud ecosystems, digital banking platforms, and advanced artificial intelligence inference arrays. Tracking dynamically through June 2026, the master-planned campus has successfully activated its first major operational block, delivering 16 MW of critical capacity across 1,137 highly secure racks. Simultaneously, heavy structural work is advancing on the remaining phases to scale the campus to its ultimate 60 MW facility load. By establishing a world-class, rated-4 certified footprint in Kolkata, the development completely sidesteps regional infrastructure speed-to-market boundaries. It provides global hyperscalers and domestic enterprises with direct access to a highly resilient, low-latency node connected straight into cross-border landing corridors and major domestic internet exchanges.  


Quick Facts

FieldValue
Project NameCtrlS Kolkata: 60MW AI-Ready Data Center Hub in New Town
LocationJF77+M28, Action Area IIE, Reckjoani, New Town, West Bengal 700161
StatusActive / Phase 1 Live & Phase 2 Under Construction (Tracking June 2026)
CommissioningPhase 1 (16 MW / 1,137 Racks) Live; Phase 2 structural integration progressing through 2026
Total IT Load~42.0 MW net critical operational compute capacity across full buildout
Total Capacity60.0 Megawatts (60 MW) gross total campus utility envelope
Tier LevelRated 4 Compliant (Fault-tolerant architecture with concurrently maintainable frameworks)
Project TypeGreenfield AI-Ready, Hyperscale Cloud & Enterprise Colocation Campus

City Profile

HeaderDetails
City NameKolkata
PopulationApproximately 4.5 million (city proper)
Urban AgglomerationApproximately 15.0 million
City GDPApproximately US$150–170 billion (estimated metropolitan GDP)
Per Capita IncomeApproximately US$10,000–12,000 (metro estimate, PPP-adjusted)
City TierTier 1 – Major Metropolitan City
Key StrengthsMajor commercial and financial hub of Eastern India; large skilled workforce; strong IT and ITES sector; major seaport access; extensive rail, road, and air connectivity; growing data center ecosystem; rich cultural and educational heritage

Companies Involved

HeaderDetails
Developer / Operator CtrlS Datacenters
Strategic Infrastructure Partner Government of West Bengal / Bengal Silicon Valley Core Steering Committee
Construction Contractor Leading Indian Prime Mission-Critical General Contractors & Engineering Specialists
MEP Engineering CtrlS Advanced Facility Architecture Group & High-Density Thermal Systems Divisions
Network Connectivity Absolute carrier-neutral connectivity matrix deploying multi-operator underground dark fiber paths connecting directly to international subsea landing stations
Power Infrastructure Dual-feed high-voltage utility connection backed by dedicated, on-site transformation infrastructure engineered for maximum grid isolation and safety

Technical Specifications

HeaderDetails
Power Capacity60 MW gross facility load engineered to support variable enterprise rack densities and dense cloud infrastructure blocks
UPS Redundancy$2N+1$ block-redundant solid-state static UPS networks paired with highly responsive automated backup diesel generator configurations
Cooling System Next-generation hybrid precision cooling loops integrated with smart hot-aisle/cold-aisle containment systems to maintain optimized thermodynamic profiles
Connectivity Minimum of 4 physically independent, concrete-fortified subterranean network entry vaults to ensure uninterrupted data transport path diversity
PUE Target $\le 1.35$ design-optimized annualized operating profile driven by advanced localized environmental controls matching premium tropical metrics
Energy Mix High-sustainability structural framework incorporating green building design methodologies and escalating options for regional renewable grid sourcing

Milestones

HeaderDetails
Announcement 2023 - Q3 (Land Allocation & Initial Site Clearances Awarded)
Construction Start 2024 - Q1 (Civil Structural Framing & Foundation Pouring)
Phase 1 Go-Live 2025 - Q3 (Phase 1 Commissioning & Initial 16MW Operational Launch)
Full Buildout 2027 - Q4 (Targeted Finalization of Multi-Phase Campus Deployment)

Investment Details

HeaderDetails
Total InvestmentMulti-million dollar dedicated regional digital capital asset expenditure forming a vital anchor block of CtrlS's nationwide infrastructure expansion strategy
Funding 100% capitalized via corporate infrastructure development reserves managed under the CtrlS global digital asset optimization roadmap

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.