Equinix MD6 Madrid 3.5MW Colocation Campus

Status: Operational   |   Location: Calle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain


Project Overview

The Equinix MD6 International Business Exchange (IBX) data center in Alcobendas, Madrid, serves as a hyper-connected cornerstone for Spain's digital economy and a vital hub for the European financial markets. Launched in August 2022, the facility spans 15,780 square feet of optimized colocation space, offering 3.5 megawatts (MW) of critical IT load. Engineered to handle high-density enterprise configurations, MD6 supports power densities reaching 10 kilowatts (kW) per rack, making it perfectly suited for modern high-performance computing (HPC) and NVIDIA GPU-accelerated workloads. A major milestone for the facility is its selection by Bolsas y Mercados Españoles (BME), a subsidiary of the SIX Group, to host its new "Equinox" equity trading platform. BME is actively migrating its matching engines and colocation services to MD6, with full transition finalized by Q2 2027. This high-frequency ecosystem is further enhanced by Transaction Network Services (TNS), which provides ultra-low latency Layer 1 and Layer 3 network pathways. Operating with an N+1 water-cooled configuration and evaporative cooling towers, the data center achieves high energy efficiency. Furthermore, MD6 operates on a 100% renewable energy mix, backed by solar Virtual Power Purchase Agreements (vPPAs) within Spain.


Quick Facts

FieldValue
Project NameEquinix MD6 Madrid 3.5MW Colocation Campus
LocationCalle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain
StatusOperational
CommissioningQ3 2022
Total IT Load3.5 MW
Total Capacity3.5 MW (3,500 kW)
Tier LevelTier III Equivalent (IBX Uptime Standards)
Project TypeRetail Colocation / Carrier-Neutral Financial Hub

City Profile

HeaderDetails
City NameMadrid
Population3.3Million
Urban Agglomeration 7 Million
City GDP€135.362 billion in 2020
Per Capita Income €38,435 per inhabitant in 2022.
City TierTier 1
Key StrengthsStrategic Subsea Cable Hub (connecting to the Americas and Africa); Central Location in Iberian Peninsula; Government Support for Digitalization.

Companies Involved

HeaderDetails
Developer / Operator Equinix
Strategic Infrastructure Partner Bolsas y Mercados Españoles (BME Exchange)
Construction Contractor Equinix Smart Build (Internal)
MEP Engineering Equinix Global Design and Engineering
Network Connectivity Equinix Fabric, BME Proximity, TNS Waypoint Trading Solutions
Power Infrastructure 230v / 400v Power Distribution

Technical Specifications

HeaderDetails
Power Capacity3.5 MW Marketed Power
UPS RedundancyN+1 Enterprise-Grade Redundancy
Cooling System N+1 Water-Cooled Plant with Evaporative Cooling Towers
Connectivity Carrier-Neutral MMR, Equinix Internet Exchange, Layer 1 & 3 ultra-low latency
PUE Target Optimized High Efficiency Design
Energy Mix 100% Renewable (Solar GoOs from Spain vPPA)

Milestones

HeaderDetails
Announcement Pre-2022
Construction Start Pre-2022
Phase 1 Go-Live August 2022
Full Buildout Q2 2027 (Final BME Matching Engine Migration)

Investment Details

HeaderDetails
Total InvestmentUndisclosed (Part of Madrid Campus Capital Expenditure)
Funding Equinix Corporate Capital