CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub

Status: Operational / Active Phased Development & Expansion   |   Location: Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area)


Project Overview

CyrusOne’s FRA5 Frankfurt Campus in Hanau is a high-density, mission-critical digital infrastructure facility strategically located approximately 25 km east of central Frankfurt, positioning it within one of Europe’s most important data center and connectivity markets. Delivering 54 MW of critical IT capacity across two purpose-built three-storey data centre buildings and approximately 18,000 m² of technical space, the campus is designed to support hyperscale cloud providers, enterprise colocation customers, financial institutions, and organisations running artificial intelligence (AI), machine learning (ML), and high-performance computing (HPC) workloads. Engineered for scalability and operational resilience, FRA5 features advanced power distribution, redundant electrical systems, and flexible infrastructure capable of accommodating high-density deployments and next-generation GPU clusters. The campus benefits from robust regional utility infrastructure, providing reliable, high-capacity power to meet the growing demands of cloud computing and AI applications. Its strategic location also enables ultra-low-latency connectivity to DE-CIX Frankfurt, one of the world’s largest Internet Exchange points, along with access to multiple carrier networks and leading cloud platforms, supporting seamless hybrid and multi-cloud deployments. Sustainability is a key aspect of the campus design, with closed-loop dry cooling systems significantly reducing water consumption while maintaining efficient thermal performance, complemented by air-cooled uninterruptible power supply (UPS) modules that enhance energy efficiency and operational reliability even during periods of high ambient temperatures. Combined with enterprise-grade physical security, resilient infrastructure, advanced connectivity, and environmentally responsible engineering, CyrusOne’s FRA5 Frankfurt Campus provides a future-ready platform for organisations deploying mission-critical cloud services, AI infrastructure, and data-intensive digital applications in one of Europe’s premier digital hubs.


Quick Facts

FieldValue
Project NameCyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub
LocationIndustrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area)
StatusOperational / Active Phased Development & Expansion
CommissioningPhase 1 Go-Live: Q1 2024–2025 / Full Campus Phaseout: 2025–2027
Total IT Load54 MW Total Critical IT Load
Total Capacity54 MW IT Power Capacity across 18,000 m² of technical space in 2 x 3-story buildings
Tier LevelTier III Equivalent Concurrently Maintainable Architecture (ISO 27001, ISO 14001, ISO 50001, ISO 9001 Certified)
Project TypePurpose-Built Greenfield Hyperscale, High-Density AI-Ready Compute & Enterprise Colocation Campus

City Profile

HeaderDetails
City NameFrankfurt
Population7,80,000
Urban Agglomeration5.8 million
City GDP€160.8 billion
Per Capita Income$101,000 USD
City TierTier 1
Key StrengthsHosting DE-CIX, the worlds largest Internet Exchange Point; financial capital of the Eurozone; strict sustainability mandates driving innovation.

Companies Involved

HeaderDetails
Developer / Operator CyrusOne
Strategic Infrastructure Partner City of Hanau, Main-Kinzig Power Grid Authorities, & DE-CIX Ecosystem Partners
Construction Contractor Specialized European Mission-Critical Contractors & Engineering EPCs
MEP Engineering CyrusOne European Technical Infrastructure Engineering Teams
Network Connectivity Carrier-neutral facility with four diverse fiber ingress routes onto site, dual Meet-Me-Rooms (MMRs), and direct low-latency connections to major Frankfurt internet exchange hubs (DE-CIX).
Power Infrastructure Active/Active dual redundant 20 kV incomer feeds with a total site capacity of 90 MVA, block-redundant (7-to-make-6) static UPS topologies providing 9 MW per floor, and 2N backup diesel generator sets with 48+ hours on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity
UPS RedundancyBlock-Redundant / 2N Air-Cooled UPS Topologies
Cooling System Closed-loop chilled water systems utilizing free-cooling air-cooled chillers, hot/cold aisle containment, zero-water evaporative loss design, and liquid-to-chip infrastructure support for high-density AI clusters.
Connectivity Carrier-neutral access, direct cloud interconnects, diverse fiber rings, and carrier integration across 4 independent fiber routes.
PUE Target < 1.27 Annualized Design PUE
Energy Mix 100% Certified Green Renewable Energy supply with BREEAM Very Good environmental target standards.

Milestones

HeaderDetails
Announcement November 2021
Construction Start Q3 2022 / Groundbreaking Q4 2023
Phase 1 Go-Live Q1 2024 / Q1 2025 (Building 1)
Full Buildout 2026–2027 (Building 2 & Final AI High-Density Expansion)

Investment Details

HeaderDetails
Total InvestmentEstimated €350,000,000 EUR to €450,000,000 EUR
Funding CyrusOne corporate capital expenditure (backed by KKR and Global Infrastructure Partners)