CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub
Status: Operational / Active Phased Development & Expansion | Location: Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area)
Project Overview
CyrusOne’s FRA5 Frankfurt Campus in Hanau is a high-density, mission-critical digital infrastructure facility strategically located approximately 25 km east of central Frankfurt, positioning it within one of Europe’s most important data center and connectivity markets. Delivering 54 MW of critical IT capacity across two purpose-built three-storey data centre buildings and approximately 18,000 m² of technical space, the campus is designed to support hyperscale cloud providers, enterprise colocation customers, financial institutions, and organisations running artificial intelligence (AI), machine learning (ML), and high-performance computing (HPC) workloads. Engineered for scalability and operational resilience, FRA5 features advanced power distribution, redundant electrical systems, and flexible infrastructure capable of accommodating high-density deployments and next-generation GPU clusters. The campus benefits from robust regional utility infrastructure, providing reliable, high-capacity power to meet the growing demands of cloud computing and AI applications. Its strategic location also enables ultra-low-latency connectivity to DE-CIX Frankfurt, one of the world’s largest Internet Exchange points, along with access to multiple carrier networks and leading cloud platforms, supporting seamless hybrid and multi-cloud deployments. Sustainability is a key aspect of the campus design, with closed-loop dry cooling systems significantly reducing water consumption while maintaining efficient thermal performance, complemented by air-cooled uninterruptible power supply (UPS) modules that enhance energy efficiency and operational reliability even during periods of high ambient temperatures. Combined with enterprise-grade physical security, resilient infrastructure, advanced connectivity, and environmentally responsible engineering, CyrusOne’s FRA5 Frankfurt Campus provides a future-ready platform for organisations deploying mission-critical cloud services, AI infrastructure, and data-intensive digital applications in one of Europe’s premier digital hubs.
Quick Facts
| Field | Value |
| Project Name | CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub |
| Location | Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area) |
| Status | Operational / Active Phased Development & Expansion |
| Commissioning | Phase 1 Go-Live: Q1 2024–2025 / Full Campus Phaseout: 2025–2027 |
| Total IT Load | 54 MW Total Critical IT Load |
| Total Capacity | 54 MW IT Power Capacity across 18,000 m² of technical space in 2 x 3-story buildings |
| Tier Level | Tier III Equivalent Concurrently Maintainable Architecture (ISO 27001, ISO 14001, ISO 50001, ISO 9001 Certified) |
| Project Type | Purpose-Built Greenfield Hyperscale, High-Density AI-Ready Compute & Enterprise Colocation Campus |
City Profile
| Header | Details |
| City Name | Frankfurt |
| Population | 7,80,000 |
| Urban Agglomeration | 5.8 million |
| City GDP | €160.8 billion |
| Per Capita Income | $101,000 USD |
| City Tier | Tier 1 |
| Key Strengths | Hosting DE-CIX, the worlds largest Internet Exchange Point; financial capital of the Eurozone; strict sustainability mandates driving innovation. |
Companies Involved
| Header | Details |
| Developer / Operator | CyrusOne |
| Strategic Infrastructure Partner | City of Hanau, Main-Kinzig Power Grid Authorities, & DE-CIX Ecosystem Partners |
| Construction Contractor | Specialized European Mission-Critical Contractors & Engineering EPCs |
| MEP Engineering | CyrusOne European Technical Infrastructure Engineering Teams |
| Network Connectivity | Carrier-neutral facility with four diverse fiber ingress routes onto site, dual Meet-Me-Rooms (MMRs), and direct low-latency connections to major Frankfurt internet exchange hubs (DE-CIX). |
| Power Infrastructure | Active/Active dual redundant 20 kV incomer feeds with a total site capacity of 90 MVA, block-redundant (7-to-make-6) static UPS topologies providing 9 MW per floor, and 2N backup diesel generator sets with 48+ hours on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | 54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity |
| UPS Redundancy | Block-Redundant / 2N Air-Cooled UPS Topologies |
| Cooling System | Closed-loop chilled water systems utilizing free-cooling air-cooled chillers, hot/cold aisle containment, zero-water evaporative loss design, and liquid-to-chip infrastructure support for high-density AI clusters. |
| Connectivity | Carrier-neutral access, direct cloud interconnects, diverse fiber rings, and carrier integration across 4 independent fiber routes. |
| PUE Target | < 1.27 Annualized Design PUE |
| Energy Mix | 100% Certified Green Renewable Energy supply with BREEAM Very Good environmental target standards. |
Milestones
| Header | Details |
| Announcement | November 2021 |
| Construction Start | Q3 2022 / Groundbreaking Q4 2023 |
| Phase 1 Go-Live | Q1 2024 / Q1 2025 (Building 1) |
| Full Buildout | 2026–2027 (Building 2 & Final AI High-Density Expansion) |
Investment Details
| Header | Details |
| Total Investment | Estimated €350,000,000 EUR to €450,000,000 EUR |
| Funding | CyrusOne corporate capital expenditure (backed by KKR and Global Infrastructure Partners) |