Data4 Milan Data Center Campus: 270MW AI Digital Hub

Status: Operational (MIL01 Phase 1–DC09) / Active Construction & Expansion (MIL01 expansion & MIL02)   |   Location: Cornaredo (MIL01: Via Monzoro, 101-105) & Vittuone (MIL02: Via Giovanni Pascoli), Metropolitan City of Milan, Italy


Project Overview

Data4’s Milan Campus is one of the largest and most advanced digital infrastructure developments in Italy and Southern Europe, strategically spanning 28 hectares across two interconnected sites in Cornaredo (MIL01) and Vittuone (MIL02). Upon full completion, the mega-campus is planned to deliver an impressive 270 MW of total critical IT capacity across 18 purpose-built data center modules, providing one of the region’s most scalable platforms for hyperscale cloud providers, multinational enterprises, public sector organisations, and artificial intelligence (AI) applications. Located approximately 15 km west of central Milan, the campus benefits from excellent access to major transportation corridors and Italy’s primary fibre backbone networks, enabling low-latency connectivity across domestic and international markets. Designed as a carrier-neutral ecosystem, the campus offers customers flexible interconnection with multiple telecommunications providers, direct access to leading public cloud platforms, and seamless support for hybrid and multi-cloud deployments. Engineered to meet the growing requirements of next-generation digital infrastructure, the facilities incorporate AI-ready high-density liquid cooling technologies capable of supporting power-intensive GPU clusters, machine learning platforms, and high-performance computing (HPC) environments while maintaining high levels of energy efficiency and operational reliability. Sustainability is embedded throughout the campus design, with modern power distribution, energy-efficient cooling systems, and infrastructure developed to support long-term environmental objectives alongside scalable digital growth. Combined with enterprise-grade physical security, resilient utility infrastructure, advanced connectivity, and flexible expansion capabilities, Data4’s Milan Campus provides a future-ready foundation for mission-critical workloads and strengthens Milan’s position as one of Europe’s leading hubs for cloud, AI, and hyperscale digital infrastructure.


Quick Facts

FieldValue
Project NameData4 Milan Data Center Campus: 270MW AI Digital Hub
LocationCornaredo (MIL01: Via Monzoro, 101-105) & Vittuone (MIL02: Via Giovanni Pascoli), Metropolitan City of Milan, Italy
StatusOperational (MIL01 Phase 1–DC09) / Active Construction & Expansion (MIL01 expansion & MIL02)
CommissioningMIL01 First Phase Go-Live: 2014 / MIL02 Construction: 2025–2028+
Total IT Load~180 MW Critical IT Load (270 MW Total Grid / Gross Facility Capacity)
Total Capacity270 MW Total Power Capacity across 28 Hectares (MIL01: 170 MW across 14 Data Centers / MIL02: 100 MW across 4 Data Centers)
Tier LevelTier III Equivalent Design & Facility (ISO 27001, ISO 14001, ISO 50001, ISO 45001, PCI-DSS Certified)
Project TypePurpose-Built Greenfield Hyperscale, Enterprise Colocation & AI-Ready Campus Hub

City Profile

HeaderDetails
City NameMilan
Population~1.4 million
Urban Agglomeration~3.2 million
City GDP~USD 220–240 billion
Per Capita Income~USD 60,000–65,000
City TierAlpha Global City
Key StrengthsGlobal financial and fashion capital

Companies Involved

HeaderDetails
Developer / Operator Data4 Infrastructure
Strategic Infrastructure Partner Unareti (Regional Electricity Distributor), Terna (Italian Transmission Grid), & Lombardy Regional Authority
Construction Contractor Specialized European Mission-Critical Contractors & General Engineering Firms
MEP Engineering Data4 Technical & Facilities Engineering Teams
Network Connectivity Dual geodiverse underground fiber vaults; carrier-neutral access to 40+ carriers and direct links to MIX (Milan Internet eXchange) and major regional fiber backbones.
Power Infrastructure High-voltage dedicated substations connected directly to the national grid (Terna/Unareti), dual 2N utility power feeds, 2N static modular UPS systems, and N+1 / 2N backup diesel generators with on-site fuel reserve.

Technical Specifications

HeaderDetails
Power Capacity170 MW (MIL01 Campus) + 100 MW (MIL02 Campus) = 270 MW Total Capacity
UPS Redundancy2N / N+1 Static Uninterruptible Power Supply (UPS) Configuration
Cooling System Closed-loop chilled water systems, eco-mode air-side economizers, hot/cold aisle containment, and high-density liquid-to-chip cooling infrastructure for AI workloads.
Connectivity Carrier-neutral platform with 2 Meet-Me-Rooms (MMRs) per building, dark fiber cross-connects, and low-latency access to major European connectivity corridors.
PUE Target < 1.30 Operational Design PUE
Energy Mix 100% Certified Renewable Energy with sustainability features including heat reuse initiatives and circular waste management.

Milestones

HeaderDetails
Announcement 2013 (Initial MIL01 Expansion) / 2024 (MIL02 Campus Master Plan)
Construction Start 2014 (MIL01) / 2025 (MIL02)
Phase 1 Go-Live 2014 (MIL01 Initial Phase) / 2024 (MIL01 DC09 Launch)
Full Buildout 2028–2030 (Completion of all 18 Data Center Buildings across MIL01 & MIL02)

Investment Details

HeaderDetails
Total Investment€2.0 Billion (Total Planned Cumulative Capital Expenditure for Data4 Italy Expansion)
Funding Data4 Group corporate investment backed by Brookfield Asset Management