DataBank SLC1 Data Center Salt Lake City: 179 E Social Hall Ave Colocation Specs
Status: Operational | Location: 179 East Social Hall Avenue, Suite 200, Salt Lake City, UT 84111, Utah, United States
Project Overview
DataBank SLC1 is a premier downtown Salt Lake City carrier hotel and network interconnection facility located at 179 East Social Hall Avenue, serving as a critical connectivity hub for enterprises, telecommunications providers, cloud platforms, and digital service operators across the Salt Lake City metropolitan area and broader Intermountain West. Spanning approximately 10,610 square feet, the facility is designed primarily around network interconnection and edge connectivity rather than large-scale compute deployments, allowing organizations to establish efficient connections between local infrastructure and major regional and national networks. SLC1 hosts more than 38 on-site carriers, creating a diverse connectivity ecosystem that enables customers to access multiple telecommunications providers from a single location. This carrier density supports low-latency cross-connects, diverse network routing, and flexible connectivity configurations for businesses with demanding bandwidth and performance requirements. The facility also provides blended bandwidth solutions, allowing customers to combine connectivity from multiple network providers to improve network resilience, performance, and operational flexibility. Direct fiber connections further strengthen the facility’s role as an aggregation point within Salt Lake City’s digital infrastructure ecosystem, enabling efficient communication between enterprises, cloud environments, internet networks, and larger data center campuses. SLC1 is particularly valuable as a network extension for workloads that require substantial computing resources but benefit from a dedicated connectivity hub in the downtown market. Its infrastructure complements larger compute-oriented deployments at DataBank’s Granite Point campus in Bluffdale, creating a distributed architecture in which downtown network interconnection can work alongside larger-scale data center capacity located farther from the city center. This model allows customers to connect efficiently to regional computing environments while maintaining access to a broad carrier ecosystem. By combining carrier diversity, fiber-rich connectivity, low-latency cross-connects, and blended bandwidth services, DataBank SLC1 serves as an important edge networking and aggregation point for the Salt Lake City region. The facility strengthens DataBank’s broader Utah infrastructure footprint while providing enterprises and service providers with a flexible platform for cloud connectivity, network optimization, hybrid IT, and distributed digital operations.
Quick Facts
| Field | Value |
| Project Name | DataBank SLC1 Data Center Salt Lake City: 179 E Social Hall Ave Colocation Specs |
| Location | 179 East Social Hall Avenue, Suite 200, Salt Lake City, UT 84111, Utah, United States |
| Status | Operational |
| Commissioning | Active Operating Carrier Hotel & Edge Interconnection Node |
| Total IT Load | 0.5 MW Critical IT Load Capacity |
| Total Capacity | 10,610 sq ft IT whitespace (~16,000 sq ft gross total floor area) |
| Tier Level | Tier III Equivalent Concurrently Maintainable Architecture |
| Project Type | Carrier Hotel, Downtown Network Edge & Enterprise Colocation Hub |
City Profile
| Header | Details |
| City Name | West Valley |
| Population | 137,491 (2025 estimate) |
| Urban Agglomeration | Part of the Salt Lake City metropolitan area, ~1.3 million |
| City GDP | Not separately reported; part of the Salt Lake City metropolitan economy |
| Per Capita Income | US$30,104 (2020–2024) |
| City Tier | Tier 2 – Regional Industrial, Logistics & Digital Infrastructure Hub |
| Key Strengths | Strategic location within the Salt Lake City metropolitan area; strong transportation connectivity; proximity to Salt Lake City International Airport; established industrial and logistics base; access to Utah's technology ecosystem; strong fiber and telecommunications connectivity; skilled workforce; proximity to major commercial markets; competitive location for enterprise and digital infrastructure. |
Companies Involved
| Header | Details |
| Developer / Operator | DataBank |
| Strategic Infrastructure Partner | Rocky Mountain Power (PacifiCorp), Regional Carrier & Fiber Ecosystem Partners |
| Construction Contractor | Mission-Critical Engineering & Data Center Specialty Contractors |
| MEP Engineering | DataBank Global Infrastructure & Mission-Critical Engineering Teams |
| Network Connectivity | Primary carrier-hotel design featuring 38+ on-net carriers, path-diverse fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), regional blended bandwidth, and direct high-speed interconnects to DataBank facilities. |
| Power Infrastructure | Redundant utility feeds, 2N / N+1 static uninterruptible power supply (UPS) systems, automated transfer switchgear (ATS), 120V/208V/3-phase/DC distribution, and dedicated backup diesel generators with on-site fuel reserves. |
Technical Specifications
| Header | Details |
| Power Capacity | ~1.6 MW Utility Substation Capacity Allocation (0.5 MW Critical IT) |
| UPS Redundancy | Concurrently Maintainable 2N / N+1 Static UPS Architecture |
| Cooling System | Precision perimeter CRAH cooling units in N+1 redundancy, cold-aisle containment, air-side free cooling utilizing Utah's ambient air, and real-time environmental monitoring. |
| Connectivity | Sub-millisecond optical dark fiber connections linking downtown Salt Lake City to regional cloud availability zones, Granite Point campus (Bluffdale), and West Coast backbones. |
| PUE Target | < 1.35 Annualized Operational Design PUE |
| Energy Mix | Regional grid power supplied by Rocky Mountain Power with options for local renewable energy matching. |
Milestones
| Header | Details |
| Announcement | Operational Facility |
| Construction Start | Completed / Operational |
| Phase 1 Go-Live | Operational |
| Full Buildout | Active Commercial Carrier Hotel & Edge Interconnection Facility |
Investment Details
| Header | Details |
| Total Investment | ~$15,000,000 – $25,000,000 USD (Estimated Facility Capital Expenditure & Modernization) |
| Funding | Corporate Capital Expenditure (DataBank / DigitalBridge) |