CirrusDS View 78 Campus Data Center Midvale Utah Specs
Status: Planned / Under Development | Location: 983 W Center Street, Midvale, UT 84047, Utah, United States
Project Overview
The CirrusDS View 78 Campus is a master-planned hyperscale and wholesale colocation data center development located at 983 West Center Street in Midvale, Utah, within the rapidly expanding Salt Lake Valley digital infrastructure market. Designed to address the growing requirements of enterprise cloud platforms, artificial intelligence, high-performance computing, and wholesale colocation customers, the campus provides a scalable environment capable of supporting both current deployments and future large-scale computing demand. Phase 1 of the development encompasses more than 224,000 square feet of data center and supporting infrastructure and is planned to deliver approximately 32 MW of critical IT load, providing substantial capacity for enterprise and high-density computing environments. The campus has been master-planned for significant long-term expansion, with the full buildout projected to reach more than 1.12 million square feet of infrastructure and scale to approximately 160 MW of total power capacity distributed across multiple facilities. This phased approach allows computing capacity to be added progressively as demand develops while maintaining a unified campus design and supporting infrastructure environment. The project’s location in Midvale provides access to the broader Salt Lake City metropolitan market, including established telecommunications networks, business centers, transportation infrastructure, and regional fiber routes. Its wholesale-oriented architecture is particularly suited to hyperscale cloud providers, large enterprises, managed service providers, and technology companies seeking dedicated space and substantial power capacity for scalable deployments. The planned infrastructure can accommodate a wide range of workloads, from conventional enterprise applications and cloud services to increasingly power-intensive AI and high-performance computing environments. By combining a large development footprint, significant initial capacity, and a long-term expansion strategy, the View 78 Campus provides a flexible platform for organizations requiring scalable digital infrastructure in Utah. The project also reflects the growing trend toward larger multi-building data center campuses in regional markets, where available land, power infrastructure, and connectivity can support phased hyperscale expansion. At full development, CirrusDS View 78 is positioned to become a significant digital infrastructure hub in the Salt Lake Valley, supporting regional cloud adoption, AI growth, wholesale colocation, and the broader expansion of Utah’s data center ecosystem.
Quick Facts
| Field | Value |
| Project Name | CirrusDS View 78 Campus Data Center Midvale Utah Specs |
| Location | 983 W Center Street, Midvale, UT 84047, Utah, United States |
| Status | Planned / Under Development |
| Commissioning | Phased Rollout Target |
| Total IT Load | 32.0 MW Initial Phase (Expandable up to 160.0 MW Master-Planned Load) |
| Total Capacity | 224,000 sq ft Initial Phase (Expandable up to 1,120,000 sq ft across multi-building campus) |
| Tier Level | Tier II / Tier III Equivalent Concurrently Maintainable Standards |
| Project Type | Purpose-Built Wholesale & Hyperscale Colocation Campus |
City Profile
| Header | Details |
| City Name | Midvale |
| Population | ~36,000 |
| Urban Agglomeration | ~1.3 million — Salt Lake City metropolitan area |
| City GDP | Not separately reported; part of the Salt Lake City metropolitan economy |
| Per Capita Income | ~US$35,000–40,000 (estimated) |
| City Tier | Tier 2 – Regional Technology, Business & Digital Infrastructure Hub |
| Key Strengths | Strategic location within the Salt Lake City metropolitan area; proximity to downtown Salt Lake City; strong highway and rail connectivity; access to major fiber networks; established commercial and technology ecosystem; skilled workforce; proximity to Salt Lake City International Airport; growing data center and telecommunications infrastructure; competitive location for enterprise digital infrastructure. |
Companies Involved
| Header | Details |
| Developer / Operator | Cirrus Data Services |
| Strategic Infrastructure Partner | Midvale City, Rocky Mountain Power (PacifiCorp), Regional Carrier Fiber Operators |
| Construction Contractor | Mission-Critical Engineering & Data Center General Contractors |
| MEP Engineering | Mission-Critical Mechanical & Electrical Infrastructure Specialists |
| Network Connectivity | Carrier-neutral facility, dual path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), and direct interconnectivity to major Salt Lake City carrier hotels and regional fiber networks. |
| Power Infrastructure | High-voltage utility grid connections from Rocky Mountain Power, static N+1 / 2N uninterruptible power supply (UPS) modules, automatic transfer switchgear (ATS), and sound-attenuated N+1 emergency backup diesel generators with localized bulk fuel reserves. |
Technical Specifications
| Header | Details |
| Power Capacity | ~40 MVA Initial Utility Substation Allocation (Scaling to 180+ MVA for Full 160 MW Buildout) |
| UPS Redundancy | Concurrently Maintainable Tier II / Tier III N+1 or 2N Static UPS Architecture |
| Cooling System | Flexible airflow and liquid cooling infrastructure engineered to support low-density to high-density server racks, featuring closed-loop dry coolers, CRAH units, and direct-to-chip liquid cooling readiness. |
| Connectivity | Sub-millisecond optical dark fiber routes linking Midvale directly to carrier hubs in downtown Salt Lake City, West Jordan, and regional cloud availability zones. |
| PUE Target | < 1.25 Annualized Operational Design PUE |
| Energy Mix | Regional grid power supplied by Rocky Mountain Power with options for local renewable energy integration. |
Milestones
| Header | Details |
| Announcement | Planned / Announced Campus |
| Construction Start | Target Phase 1 Development |
| Phase 1 Go-Live | Phased Rollout Target |
| Full Buildout | Multi-Phase Master-Planned Campus Development |
Investment Details
| Header | Details |
| Total Investment | ~$350,000,000 USD (Initial Phase) / $1.5B+ USD (Full Campus Buildout) |
| Funding | Private Capital Expenditure / Infrastructure Investment (Cirrus Data Services) |