Microsoft Cheyenne Data Center Expansion Wyoming AI Hyperscale Specs

Status: Under Development / Multi-Phase Expansion   |   Location: Bison Business Park, Wapiti Trail, College Drive, and North Range Business Park areas, Cheyenne, WY 82007


Project Overview

The Microsoft Cheyenne Data Center Expansion represents a major multi-campus hyperscale development in Southeast Wyoming, significantly increasing Microsoft’s long-term infrastructure footprint in the region. The company has secured more than 3,200 acres across several strategically located sites, including approximately 200 acres within Bison Business Park, around 3,000 acres of adjacent land, and an additional 385-acre parcel near College Drive. This extensive land position provides Microsoft with substantial room for phased development and future expansion as demand for Azure cloud services, artificial intelligence, machine learning, and other high-performance computing workloads continues to accelerate. The Cheyenne campus is expected to support large-scale compute infrastructure designed to deliver reliable, low-latency services to customers across North America while strengthening Microsoft’s broader regional cloud infrastructure network. A key element of the development is its utility strategy, with Microsoft working alongside Black Hills Energy to establish customized power and infrastructure frameworks capable of supporting the significant energy requirements associated with hyperscale and AI computing. The project also incorporates advanced cooling technologies designed to operate without consuming water during normal operations, helping reduce pressure on local water resources and improving the facility’s environmental efficiency. With its large land footprint, scalable infrastructure strategy, strong utility partnerships, and focus on sustainable cooling, the expansion positions Cheyenne as an important location within Microsoft’s growing global data center portfolio and creates significant potential for additional capacity over the long term.


Quick Facts

FieldValue
Project NameMicrosoft Cheyenne Data Center Expansion Wyoming AI Hyperscale Specs
LocationBison Business Park, Wapiti Trail, College Drive, and North Range Business Park areas, Cheyenne, WY 82007
StatusUnder Development / Multi-Phase Expansion
CommissioningPhased Rollout Target (Ongoing expansion cycles)
Total IT Load100 MW – 250 MW (Current Expansion Phases) / Scaling to 600+ MW Master-Planned Capacity
Total Capacity3,200+ Acres Land Acquisition / Multi-million sq ft gross floor area across Cheyenne campuses
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant Enterprise Standards
Project TypePurpose-Built Hyperscale Cloud & AI Infrastructure Campus

City Profile

HeaderDetails
City Name Cheyenne
Population~65,000
Urban Agglomeration~100,000
City GDP~$6–7 billion (estimated, metro-based)
Per Capita Income~$38,000
City TierTier 3 (Small but strategic U.S. city)
Key StrengthsLow-cost power, strong wind energy access, favorable tax environment (no state income tax), proximity to Denver tech ecosystem, growing data center hub, high land availability

Companies Involved

HeaderDetails
Developer / Operator Microsoft Corporation
Strategic Infrastructure Partner City of Cheyenne, Black Hills Energy (Cheyenne Light, Fuel & Power), Laramie County
Construction Contractor Mission-Critical General Contractors & Industrial Engineering Partners
MEP Engineering Microsoft Cloud Infrastructure & Design (MCID) Teams
Network Connectivity Carrier-neutral, multi-path dark fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), direct interconnects to Microsoft Azure regional backbones, and high-speed terrestrial transport links.
Power Infrastructure Substation grid connections served by Black Hills Energy under Large Power Contract Service (LPCS) tariffs, 2N/N+1 static UPS modules, fast-transfer switchgear, and on-site backup diesel/gas generators with large-capacity fuel storage.

Technical Specifications

HeaderDetails
Power Capacity~250 MW – 600 MW Total Grid Service Capacity Allocation
UPS RedundancyConcurrently Maintainable 2N / N+1 Static UPS Systems
Cooling System Advanced air-side economization, closed-loop liquid cooling (direct-to-chip readiness) utilizing Heat Exchanger Units (HXUs) designed for zero-operational water consumption.
Connectivity Sub-millisecond optical connections into major West Coast and Midwest carrier hubs, linking directly to the global Microsoft Azure edge network.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix Regional grid mix from Black Hills Energy, balanced by Microsoft’s long-term off-site power purchase agreements (PPAs) for renewable wind and solar energy.

Milestones

HeaderDetails
Announcement Multi-Phase Expansion Announced
Construction Start Active Site Preparation & Construction
Phase 1 Go-Live Operational / Phased Expansion Rollout
Full Buildout Multi-Decade Master-Planned Hyperscale Development

Investment Details

HeaderDetails
Total Investment~$1,000,000,000+ USD (Cumulative Multi-Phase Expansion Investment)
Funding Corporate Capital Expenditure (Microsoft Corporation)